Short answer
Yes, on the 13.8 kV side the 600/5 C200 is acceptable: full load is 31.4 A primary (0.26 A secondary), the worst 480 V through-fault is about 510 A primary (4.3 A secondary), and the class covers 12 kA at its full 2.0 Ω standard burden. Keep the total secondary loop burden below about 1.15 Ω and confirm the relay picks up near 0.33 A secondary.
On this page
- Is a 600/5 CT too big for a 750 kVA transformer feeder?
- Will the relay still pick up at the actual load?
- What does the ANSI C200 class actually guarantee?
- Does the 500 MVA bus fault current saturate a 600/5 CT?
- What secondary burden keeps the C200 out of saturation?
- How much fault current does the CT see for a low-voltage fault?
- Can you use a C200 CT for metering indication?
- When should you change the CT instead of the settings?
- Questions asked
The 600/5, ANSI C200 CT on that 1200 A vacuum-breaker feeder is acceptable for protecting a 750 kVA, 13.8 kV/480 V transformer, and you can commit to it after three checks. The relay must pick up near 0.33 A secondary, because transformer full load is only 31.4 A primary. The total secondary loop burden must stay below about 1.15 Ω, so the C200 class still covers the full 20.9 kA bus fault. And the protection must see the 510 A through-fault that a fault on the transformer's low-voltage side produces. The sections below run each check with the arithmetic shown.
Is a 600/5 CT too big for a 750 kVA transformer feeder? #
No — on the 13.8 kV side the ratio is oversized for load but right for fault duty: transformer full load is 31.4 A primary, about 5% of the CT's 600 A continuous rating, so heating and ratio accuracy at load are non-issues.
The full-load current comes from kVA = √3 × V_LL × I:
I = 750,000 VA ÷ (1.732 × 13,800 V) = 31.4 A
Through the 600/5 ratio (120:1) that is 31.4 ÷ 120 = 0.26 A secondary. Your 300 kW load is lighter still: 300,000 W ÷ (1.732 × 13,800 V) = 12.6 A primary at unity power factor, or 0.105 A secondary. A CT running at 5% of rating neither heats nor approaches its excitation knee at load; the only price is a secondary current small enough to test the relay's floor, which is the next section.
Everything above assumes the CT really is on the 13.8 kV feeder. On the low-voltage side, full load is 902 A — 750 kVA at that side's line voltage — and a 600 A primary rating is undersized.
| Quantity | Value | Basis |
|---|---|---|
| Full-load current, 13.8 kV side | 31.4 A | 750 kVA ÷ (√3 × 13.8 kV) |
| CT secondary current at full load | 0.26 A | 31.4 A ÷ 120 |
| 300 kW load, unity PF | 12.6 A primary / 0.105 A secondary | 300 kW ÷ (√3 × 13.8 kV) |
| Overload pickup at 125% of full load | 39 A primary / 0.33 A secondary | 1.25 × 31.4 A |
| C200 class point | 100 A secondary = 12 kA primary | 20 × 5 A into 2.0 Ω |
| 13.8 kV bus fault | 20.9 kA | 500 MVA ÷ (√3 × 13.8 kV) |
| Low-voltage bus fault seen at the CT | ≈510 A primary / 4.3 A secondary | 31.4 A ÷ 0.0615 pu |
| Loop burden for class coverage at 20.9 kA | ≤1.15 Ω | 200 V ÷ 174 A |
Will the relay still pick up at the actual load? #
Yes, if its overcurrent elements can be set at or below about 0.33 A secondary: your 300 kW load is 0.105 A secondary at unity power factor, and an overload pickup at 125% of transformer full load is 39 A primary, 0.33 A secondary.
Numerical relays publish both a minimum pickup setting and a measurement accuracy floor for their current inputs; pull both from the relay manual. At 0.105 A secondary the relay sees about 2% of its 5 A nominal input, so indication at light load is where accuracy is weakest, while pickup — a setting, not a measurement — is exact. If the relay's lowest phase pickup sits above 0.33 A, the 600/5 ratio is genuinely too coarse for overload protection on this transformer, and a smaller ratio is the fix, not a setting workaround.
While you set the elements, keep pickup and the time curve clear of energization inrush; the method is in estimating transformer inrush current for protection coordination.
What does the ANSI C200 class actually guarantee? #
C200 guarantees the CT delivers 20 times rated secondary current — 100 A — into its 2.0 Ω standard burden at 200 V with no more than 10% ratio error: a fault-performance guarantee, not a metering accuracy statement.
IEEE Std C57.13, the standard covering instrument transformer requirements, defines the relaying accuracy classes. The letter C means the ratio error is calculable because internal leakage flux is negligible, and the number is the secondary terminal voltage the CT sustains at 20 times rated secondary current into the matching standard burden: C100 with 1.0 Ω, C200 with 2.0 Ω, C400 with 4.0 Ω, C800 with 8.0 Ω.
For your CT, 100 A × 2.0 Ω equals that class terminal voltage. Two things follow. First, 20 times rated secondary on a 600/5 CT is 12 kA primary — the widely used screening limit for keeping a relaying CT within class accuracy during a fault. Second, the guarantee is defined at the standard burden: reduce the connected burden and the same terminal voltage supports proportionally more secondary current, which is the lever the next two sections pull. Editions and markings vary, so confirm the class details against the CT nameplate and documentation and with the authority having jurisdiction.
Does the 500 MVA bus fault current saturate a 600/5 CT? #
Not at the burden you will actually connect: the 20.9 kA fault is 34.8 times the ratio — above the 12 kA class point — but that point assumes a 2.0 Ω burden, and a lighter burden buys proportionally more current before the class voltage limit.
The fault current at the bus is:
I = 500,000 kVA ÷ (√3 × 13.8 kV) = 20,900 A ≈ 20.9 kA
That current flows through the CT only for a fault on the cable or bus section between the CT and the transformer primary; faults past the transformer are a small fraction of it. 20.9 kA ÷ 600 A = 34.8 times the ratio, and the secondary would be 20,900 ÷ 120 = 174 A if the CT stayed perfectly linear. Whether it does is a voltage question: the CT must drive 174 A through your connected loop, and it holds class accuracy while the required voltage stays under the class voltage. That holds up to a loop of 200 V ÷ 174 A = 1.15 Ω — which is why the burden section decides this one, not the ratio.
Two cautions the screening cannot cover: asymmetrical fault current (the DC offset set by the system X/R) and remanence in the core can push a CT toward transient saturation even when the symmetrical check passes, and relays respond differently to a saturated, distorted secondary. The decisive document is the CT's excitation curve; for this exact ratio, calculating CT saturation time for a 600/5 ratio CT walks through that check. Treat the numbers here as estimates from the study inputs; the governing short-circuit study and the CT and relay documentation decide the final values.
What secondary burden keeps the C200 out of saturation? #
Keep the whole series loop — relay input, both lead conductors, test switches, anything else — under about 1.15 Ω for class coverage at 20.9 kA, and under about 0.57 Ω if you apply the common 2× voltage margin rule of thumb.
Worked example with illustrative inputs; substitute your own:
- Relay current input: 0.1 VA at 5 A → R = 0.1 VA ÷ (5 A)² = 0.004 Ω
- Leads: 100 ft one way of #10 AWG copper at about 1 Ω per 1000 ft (≈3.3 Ω/km), loop of 200 ft → 0.20 Ω
- Total loop: 0.204 Ω
At the 174 A secondary of the 20.9 kA fault the CT must develop 174 A × 0.204 Ω = 36 V. That is 5.6 times below the class voltage, and even doubled for margin (36 × 2 = 71 V) it clears comfortably. A loop this light is normal with a numerical relay in the same switchgear as the CT. It stops being normal when the relay sits a long cable run away, an electromechanical relay with a heavy input is in the circuit, or several devices share the loop; for those cases high nominal CT burden, saturation and accuracy solutions covers the remedies.
One safety note, because this is the section that tempts you into the terminal compartment: follow NFPA 70E, 2024 edition, lockout and absence-of-voltage verification before opening any CT secondary, and never lift a secondary lead while the primary is energized — an open secondary develops hazardous voltage, so short or ground it the way the CT documentation prescribes and keep the single secondary ground point intact.
How much fault current does the CT see for a low-voltage fault? #
About 510 A primary — 4.3 A secondary, under one times the CT's 5 A rating — because the transformer's 6% impedance limits every through-fault, so faults on the secondary side are the easy part of this application.
The 500 MVA source is stiff compared with the transformer. Source impedance on a 750 kVA base is 750 kVA ÷ 500,000 kVA = 0.0015 pu, so the total is 0.06 + 0.0015 = 0.0615 pu and the through-fault is 31.4 A ÷ 0.0615 = 510 A. That is also your minimum fault for sensitivity: a pickup anywhere between the 39 A overload point and 510 A detects a bolted secondary-side bus fault with better than 13:1 margin. The full method behind the impedance arithmetic is in calculating transformer interrupting current from impedance.
Can you use a C200 CT for metering indication? #
Yes for indication, no for billing: C200 is strictly a relaying designation, and metering accuracy is a separate nameplate marking, so treat ammeter readings as close enough to watch load, not as revenue measurement.
A single CT can carry both a relaying class and a metering class on its nameplate; only the nameplate settles it. Since your stated purpose is indication only, the C200 marking is sufficient. Know where indication is weakest: at 0.105 A secondary, about 2% of nominal, both relay and meter analog front ends sit furthest from their specified accuracy band, so expect the largest percentage error at light load.
When should you change the CT instead of the settings? #
Change it in three cases — relay pickup floor above about 0.33 A secondary, loop burden you cannot get under roughly 1.15 Ω, or a CT on the transformer's low-voltage side — and otherwise keep the 600/5 C200 and put the effort into settings and records.
The decisions, case by case:
- Relay too coarse for overload pickup: a smaller ratio such as 100/5 puts full load at 1.57 A secondary where any relay can pick up, but halving the ratio doubles both the secondary fault current and the voltage the CT must develop, so the class has to rise with it — 100/5 with C400 is the usual pairing at this fault level.
- Burden stuck high: short of heavier conductors or a shorter run, move to C400, which covers twice the loop at the same excitation margin.
- CT on the low-voltage side: full load there is 902 A, so nothing smaller than a 1000/5 primary rating applies, and its class faces a much larger fault duty.
Otherwise, set the overload element at 39 A primary (0.33 A secondary), coordinate the time curve upward toward the source, set any instantaneous element above transformer inrush, and file the burden calculation, the fault-study case and the excitation curve together with the settings. That file — not the ratio alone — is what you sign.
Questions asked
Why not size the CT ratio to the 1200 A breaker instead of the transformer?
Because the breaker's 1200 A continuous rating describes the breaker, not this circuit. A CT ratio follows the current at the CT's own location: load, minimum fault and maximum fault. A 1200/5 CT would push full-load secondary current down to 0.13 A with no gain in fault performance, while the 600/5 already clears every check on the 13.8 kV feeder.
What changes if the CT is on the 480 V side of the transformer?
Everything. Full load there is 902 A, already above a 600 A continuous primary rating, and a bolted bus fault on that side approaches 14.7 kA. Use a 1000/5 or larger ratio and check its accuracy class against that fault duty and the actual connected burden before committing.
Would a 100/5 CT be a better choice for sensitivity?
It buys sensitivity and costs fault headroom. Full load becomes 1.57 A secondary, easy for any pickup, but the 20.9 kA bus fault becomes 1,045 A secondary, which needs 209 V into even a 0.2 Ω loop, past a C200's class voltage. If you truly need the sensitivity, pair 100/5 with C400 or heavier at this fault level.
How do I verify the installed CT at commissioning?
With the feeder locked out and verified de-energized, read the nameplate for ratio, class and rating factor, confirm polarity and the single secondary ground against the drawings, measure the loop resistance of the secondary wiring, and compare the relay's current reading with a calibrated clamp meter at known load. An excitation-curve test on the CT confirms the saturation margin the class only estimates.
Do these phase CTs also cover ground-fault protection?
They cover a residual ground element formed from the three phase currents, but a 600/5 ratio and small CT mismatch limit how sensitive that element can be. On a resistance-grounded or high-impedance-grounded 13.8 kV system where ground current is deliberately small, a zero-sequence CT or the relay's dedicated sensitive ground input is the usual answer. Check the relay's ground-element specification before relying on the phase CTs.