Split core current transformer selection for power meters
Short answer
The meter input decides: a 5 A or 1 A secondary split core CT feeds a low-impedance current input and must stay shorted, while a voltage-output split core needs a high-impedance input. Then match the ratio to the load, add meter burden to lead resistance against the rated VA, and take class, window and insulation from the datasheet.

On this page
- Which output type does your power meter accept?
- What CT ratio do I need for a 300 A feeder?
- How much burden VA do the meter and leads use?
- What accuracy class should a metering split core CT have?
- What window size and insulation rating does the conductor need?
- Can you clip a split core CT on without de-energizing?
- How do you install and verify a split core CT?
- Which split core CT do you order for the example feeder?
- Questions asked
Order the CT to match the meter input, then size it to the conductor. A meter with a low-impedance current input takes a 5 A or 1 A secondary CT, which is a current source that must never run open; a meter with a high-impedance voltage input takes a millivolt-output split core. Once the output type is settled, fix the ratio from the feeder's load range, add the meter input burden to the lead resistance and compare the total against the rated VA, then take class, window and insulation rating from the datasheet. Split core earns its keep where you will measure different groups at different times; for one permanent feeder a solid core of the same class is simpler. The worked example below sizes a 300/5 A unit for a feeder that peaks at 240 A.
Which output type does your power meter accept? #
Read the meter's input specification before you shortlist any CT: a low-impedance current input takes a current-secondary CT at the nominal secondary current the meter names, and a high-impedance voltage input takes a millivolt-output unit, of which 0.333 V at rated primary current is a common convention.
The two types are not interchangeable. A current-secondary CT is a current source: it drives whatever current the ratio demands and develops whatever voltage the burden requires. On a high-impedance voltage input it effectively runs open, which raises a hazardous secondary voltage and can destroy the input stage. A millivolt-output unit has its burden built in and delivers a stated voltage at rated current; on a low-impedance current input the output collapses to near zero because the input swamps the internal burden, so readings are wrong even when nothing fails.
Find the input type in the meter's installation manual: it states either a nominal secondary with the input burden in ohms or VA, or a voltage input with the minimum impedance the accuracy specification assumes. Match the CT output to exactly that line item.
| Meter input as documented in the manual | CT output to select | What the input does to the CT | Secondary left open-circuit |
|---|---|---|---|
| Current input, low impedance, burden in ohms or VA | Matching current secondary, ratio chosen for the load | Sits inside the CT's rated burden budget | Never permitted: short the secondary first |
| Voltage input, high impedance | Millivolt output scaled to rated primary current | Draws almost no current, adds no burden | Only where the datasheet states the output tolerates open circuit |
What CT ratio do I need for a 300 A feeder? #
For a feeder that peaks at 240 A, choose 300/5 A: the rated primary sits above the maximum load, and the smallest load you meter, say 30 A, stays at 10% of rated primary, above the floor where the accuracy class is guaranteed.
Two conditions fix the ratio. Continuous load must stay at or below the rated primary, and every current you actually need to meter must sit at or above the guaranteed-accuracy floor, which IEC measuring classes specify only down to 5% of rated primary current. Take the smallest standard primary at or above the feeder maximum, then test the minimum against it.
Oversizing wastes that band. A CT with a 600 A primary on the same secondary puts the 30 A minimum right on the class floor, so anything below it carries no accuracy guarantee, and light-load resolution drops because the same full-scale secondary now represents 600 A. Undersizing is worse: run a measuring CT past its rated primary and it leaves its specified range, far enough into saturation that the ratio describes nothing.
Decision rule: smallest standard primary at or just above the maximum load, with every current you must meter inside the guaranteed band.
How much burden VA do the meter and leads use? #
A 5 VA CT at the example ratio tolerates a total secondary impedance of 0.2 Ω, and the example below shows a 10 m lead run plus a meter input of 0.08 Ω reaching 0.313 Ω, so this CT must be ordered at 10 VA.
The numbers are a worked example: take the real burden from the meter manual and the real VA rating from the CT datasheet, and treat the result as an estimate to check against both before ordering.
Inputs: CT rated 300/5 A, class 0.5, rated burden 5 VA (example values); meter current input 0.08 Ω (example manual value); leads two conductors of 1.5 mm² copper, 10 m from CT to meter, resistivity 0.0175 Ω·mm²/m.
- Allowable impedance: Z = VA ÷ I² = 5 VA ÷ (25 A²) = 0.2 Ω
- Lead resistance: R = 2 × ρ × L ÷ A = 2 × 0.0175 Ω·mm²/m × 10 m ÷ 1.5 mm² = 0.233 Ω
- Total burden: 0.08 Ω + 0.233 Ω = 0.313 Ω
- Burden VA at rated secondary: (25 A²) × 0.313 Ω = 7.83 VA — past the 5 VA rating, so the class statement is void on this wiring
Two fixes pass the same arithmetic:
- Order 10 VA: allowable Z = 10 VA ÷ (25 A²) = 0.4 Ω, and 7.83 VA sits at 78% of the rating, inside the 25% to 100% band where the IEC class holds
- Keep the smaller frame and upsize to 4 mm² leads: R = 2 × 0.0175 × 10 ÷ 4 = 0.0875 Ω, total 0.1675 Ω, burden 4.19 VA, or 84% of rating — also inside the band
Watch the floor too: a 10 VA CT on a short run delivering only about 2 VA sits below 25% of rated burden and loses the guarantee from the other side, so match the VA rating to the real burden instead of buying blind headroom. Secondary voltage rises with burden, and the same physics drives the open-circuit hazard: physics of CT secondary voltage, burden and open-circuit hazards explains both, and why the shorting block is not optional.
What accuracy class should a metering split core CT have? #
Pick class 0.5 for plant energy monitoring and class 0.2 where costs are allocated between users: IEC 61869-2 defines class 0.5 as a ratio error held to ±0.5% at rated current, specified from 5% to 120% of rated primary current and 25% to 100% of rated burden.
The class covers ratio error and phase displacement together, and phase displacement matters on low power factor feeders, where it turns directly into kW error. The burden example above decides whether your actual wiring sits inside the band the class assumes; the class number alone is not a property that survives any burden.
US datasheets use the IEEE C57.13 convention instead: a marking such as 0.3B0.5 means 0.3% ratio error at a 0.5 Ω burden — 12.5 VA at rated secondary current in that convention — roughly midway between the IEC 0.2 and 0.5 grades. Read whichever convention your datasheet uses, but apply the same three checks: the class value, the burden it is defined at, and the current range over which it holds.
The published class is stated for the fully closed split core, and the joint is part of the magnetic circuit, so installation practice decides whether you achieve it.
What window size and insulation rating does the conductor need? #
Size the window to pass the conductor with its insulation and take the CT's rated insulation voltage at or above the feeder voltage: a CT marked 0.66 kV or 1 kV covers a 400 V or 480 V feeder, and the cable's overall diameter comes from the cable schedule.
Look up the overall diameter including insulation, then pick a window with working clearance: a split core must open around the conductor and close without forcing, and a rectangular window suits flat busbar better than a round one. Both the window dimension and the insulation rating are nameplate items, and both belong on the order line.
On a feeder above low voltage the insulation class must match the system, which is a different product family from the LV metering range. A CT fitted on bare busbar needs a rating that explicitly permits bare conductor; where the datasheet specifies insulated cable only, fit it on insulated conductors or sleeve the busbar first.
The CT encircles one phase conductor alone. Close the core around all three phases and the vector sum of the fluxes is near zero, so the output collapses regardless of load; enclosing a phase together with its neutral cancels the same way.
Can you clip a split core CT on without de-energizing? #
Treat fitting as opening a live enclosure: NFPA 70E, 2024 edition, requires de-energizing and verifying absence of voltage before exposing conductors, so clip the CT during an outage unless the CT documentation explicitly permits live installation and your site's energized-work rules allow it.
NFPA 70E is the US standard for safe work practices around electrical hazards, and the practical sequence is the one it exists to enforce: de-energize, lock out, test for absence of voltage, then open the core and clip it on. Confirm the local requirement with the authority having jurisdiction and with the meter and CT documentation, because live-installation provisions differ by product and by country.
How do you install and verify a split core CT? #
Land the secondary on a shorting terminal block, close the joint, point the P1 marking to the source, enter the nameplate ratio in the meter, then prove the result with a clamp meter under steady load, where the two currents must agree within the combined class tolerances.
- De-energized and verified per the section above, clip the CT around one phase conductor only, with P1 facing the source unless the meter manual states the opposite convention.
- Close the halves until the latch engages, after checking the mating faces for dirt, paint and burrs.
- Terminate S1 and S2 on a shorting terminal block and keep the short closed until the meter wiring is complete; open the meter side only with the short in place.
- Enter the CT primary and secondary exactly as printed on the nameplate, one CT per phase channel, each channel assigned to its matching voltage phase.
- Energize on a steady load and compare each phase against a calibrated clamp; if the feeder supplies a drive, pick the clamp as described in measuring VFD and soft starter current with the right meter. The pass line is the sum of the published classes — for example the CT class, a 1% clamp and the meter class can add to about 2% of legitimate difference.
- Check the sign of the kW reading: negative kW on a plain load means the CT faces backwards or S1 and S2 are swapped, the same family of error as when swapped voltage leads change three-phase kW readings. Correct the polarity and re-test.
- A plausible current on the wrong phase channel shows up as wrong kW and power factor rather than wrong amps, so verify the channel assignment, not just the magnitudes.
- When the CT moves to another group, repeat steps 4 to 6 on the new circuit; a roving CT that keeps its old setup is the classic source of energy attributed to the wrong feeder.
Which split core CT do you order for the example feeder? #
For the example 240 A feeder, the order line reads: 300/5 A, class 0.5, 10 VA, 0.66 kV or 1 kV insulation, window sized to the cable's overall diameter, split core with a latching joint, plus a shorting terminal block and a meter with a current input.
Check the burden decision first, because the leads created it: if your run is shorter or the meter input burden smaller than the example, redo the arithmetic before paying for VA you will never use. Keep the minimum metered load inside the guaranteed band, and prefer a solid core of the same class wherever the CT will never move.
For a meter with a voltage input the order line changes shape: a millivolt-output split core scaled to rated primary current, matched to the input impedance the accuracy specification assumes, with the same class, window and insulation checks. Where lead runs are long and the meter accepts it, a 1 A secondary removes most of the burden problem in one move, as the arithmetic above shows.
Questions asked
Does the burden VA calculation apply to a voltage-output split core CT?
No. A voltage-output unit sources a fixed voltage, 0.333 V at rated primary current in the common convention, into a high-impedance input, so almost no current flows in the leads and their resistance produces a negligible drop. There is no VA budget to add up. What replaces it is one datasheet line: the minimum input impedance at which the accuracy class holds, which the meter input must clear.
What happens if the secondary of a current-output CT opens under load?
The core saturates and the secondary generates a voltage limited only by that saturation, high enough to damage insulation and dangerous to touch. The practical risk window is work on an energized feeder: disconnecting the meter, or a wire working loose. Land the secondary on a shorting terminal block and keep the short closed whenever the meter side is opened.
Why does one phase read consistently low after fitting a split core CT?
The published class applies to a fully closed, clean, latched joint. A gap, or dirt or paint on the mating faces, adds magnetizing current, which shows up as a steady ratio error, usually a low reading on that phase only. Compare the suspect phase against a calibrated clamp under steady load, then open the joint, clean the faces and re-latch.
Should long lead runs push you toward a lower secondary current?
Yes. Impedance tolerance scales with the inverse square of secondary current, so at 1 A the same VA rating allows 25 times the impedance: a 5 VA rating permits 5 ohms, and a 10 m run in 1.5 mm2 leads, about 0.233 ohms round trip, uses only a sliver of it. Confirm the meter accepts a 1 A input before ordering.
Does the CT class have to match the meter's accuracy class?
They add up rather than match. Worst case, the combined ratio error is the sum of the two class values, so a class 1 CT on a class 0.5 meter can sit about 1.5 percent off at rated current before lead and installation effects. Where energy is billed or allocated, buy the tighter class on the CT and check the meter's class separately.