What changes when a motor is rewound from 220 V to 575 V

Motors and motor starters Published 11 min read By Current Intel engineering team

Short answer

A 220 V to 575 V rewind multiplies the stator turns by about 2.61, so horsepower, torque and speed hold while full-load current falls to 0.383 of the old nameplate reading. Locked-rotor current drops by the same factor, winding resistance climbs by roughly the turns ratio squared, and heat, efficiency and reliability ride on the copper fill the shop puts back in the slots.

On this page
  1. What stays the same after a voltage-change rewind?
  2. How much does full-load current drop after the rewind?
  3. How do turns and wire size change in the new stator winding?
  4. What happens to heat and efficiency after a voltage-change rewind?
  5. What happens to locked-rotor current and winding resistance?
  6. What should the rewind order and the new nameplate say?
  7. What has to be resized outside the motor?
  8. How do you test a rewound motor before it goes back on load?
  9. Questions asked

Rewound for 575 V, the same three-phase induction motor keeps its horsepower, its torque and its speed and simply trades current for turns: the new winding draws a bit more than a third of the old full-load current, and everything else follows from how well the shop puts the copper back into the same slots. This article works a real case, a 150 hp machine going from 220 V to 575 V, through the turns ratio and the current arithmetic first, then through the winding design, the heat balance, the nameplate, the panel settings and the bench tests that decide whether the rewind is sound. The numbers come first because every decision downstream hangs on them.

What stays the same after a voltage-change rewind? #

Horsepower, torque and speed stay put, because the new winding carries about 2.61 times the turns of the old one, so the air-gap flux and the torque per ampere return to their original values at the same supply frequency and speed.

Air-gap flux is set by volts per turn. The supply voltage and the turns per phase rise together by 575/220, so flux density, torque capability, breakdown torque and magnetizing behavior all come back to their old values, and speed does not move because the pole count and the frequency are untouched. The turns-set-the-voltage rule works identically in a rewound alternator, where turns and poles fix the voltage at a given speed; the guide to alternator rewind voltage at 100 rpm sets out that arithmetic.

Quantity After the rewind Why
Rated power and torque Unchanged Flux density and the frame set them, not winding voltage
Speed Unchanged Same pole count, same supply frequency
Full-load current Falls by 220/575 Same shaft power through a higher voltage
Locked-rotor current Falls by the same ratio Winding impedance grows with the square of the turns
Winding resistance Climbs by about the turns ratio squared More turns of thinner wire in the same slot
Core loss About unchanged Flux density does not move
Copper loss About unchanged if slot fill holds Fewer amperes against more ohms

Two claims travel with voltage changes and both fail here. Core loss climbs with the square of the voltage only when a finished winding is pushed above its design voltage; rewound with proportionate turns, the volts-per-turn value is unchanged and so is the core loss. And the rewound machine is not physically larger than the original when it reuses the same frame and core.

Decision: every unchanged row in that table assumes the shop wound proportionate turns back into the same slots, which is exactly what the design sheet documents.

How much does full-load current drop after the rewind? #

Full-load current falls to 220/575, about 0.383 of the old nameplate reading, because the same shaft power flows through the winding at the higher voltage with the flux unchanged; an old plate that reads 340 A should come back reading roughly 130 A at the same load.

The exact figure comes from the standard three-phase line-current relation, I = P / (√3 × V × efficiency × power factor), with P the shaft output in watts and V the line-to-line voltage in volts. Worked example, inputs labeled: a 150 hp motor at 220 V, assumed efficiency 0.95 and power factor 0.88, values typical for a machine this size and belonging, in the end, to the shop's design sheet.

  • P = 150 hp × 746 W/hp = 111,900 W
  • efficiency × power factor = 0.95 × 0.88 = 0.836
  • I at 220 V = 111,900 / (1.732 × 220 × 0.836) = 111,900 / 318.6 = 351 A
  • I at 575 V = 111,900 / (1.732 × 575 × 0.836) = 111,900 / 832.6 = 134 A
  • Cross-check: 351 A × 220/575 = 134 A

These are illustrative estimates, not nameplate values. NFPA 70, the National Electrical Code, 2023 edition, keeps full-load current tables for standard factory-built motors in Article 430; a rewound machine is judged against its own new plate instead, so confirm the final value with your authority having jurisdiction and the equipment documentation. The plate states line current, and the difference between line and winding current matters if the shop changes the wye or delta connection, which the page on motor nameplate line current versus winding current covers.

Decision: multiply the old plate reading by 220/575 and hold the shop to that figure on the new plate within a few percent; a larger gap means the efficiency or slot-fill assumption moved, and you want the design sheet before accepting the motor.

How do turns and wire size change in the new stator winding? #

The shop winds about 2.61 turns for every old turn, and each conductor drops to roughly a third of its previous cross-section so the same slots hold the copper, while thicker turn-to-turn and phase insulation takes a growing share of that slot area.

The numbers behind that: turns per coil multiply by 575/220, conductor cross-section divides by about the same factor to hold the fill, and the ground wall now stands off the new line-to-neutral voltage, about 332 V (575 divided by √3), where the old winding stood off about 127 V (220 divided by √3). That jump is where the heavier slot liners and phase insulation go. Turn-to-turn stress barely moves in a proportionate design, because volts per turn stay constant; it is the extra insulation volume that squeezes the copper.

The shop's design target is volts per coil. A winding assembled with the wrong coil grouping misses that target and shows up later as unbalanced line current and overheating, which is why a documented volts-per-coil check belongs in the order. Wire size itself is chosen against slot fill and conductor current density rather than the turn count alone; the knowledge-base page on selecting motor rewind wire size walks through that choice.

Decision: accept a shop that shows the wire chart, the fill percentage and the volts-per-coil check, and treat a bare promise of "same winding, new voltage" as no design at all.

What happens to heat and efficiency after a voltage-change rewind? #

Copper heat is nearly unchanged when the shop preserves the slot fill, because current drops to a bit over a third of the old value while resistance rises by the square of the turns ratio, and efficiency then depends on how much copper fits back in.

In numbers: the current side of the copper-loss product carries (220/575)² = 0.147, the resistance side carries the turns ratio squared, about 6.8, and 0.147 × 6.8 rounds to 1.0. The loss holds only while the copper cross-section holds. When the shop sacrifices conductor area to the thicker insulation, resistance climbs faster than the square law and the same output leaves a hotter winding and a lower efficiency. A well-executed rewind lands within a small margin of the original efficiency; a copper-starved one pays for the insulation in heat.

One loss moves with the stripping method: an uncontrolled burnout can destroy the interlaminar insulation of the core and permanently raise core loss, so the order should call for a core loss test before and after the old winding comes out, and a controlled burnout or chemical strip. The benefit sits upstream: at 220/575 of the current, feeder I²R losses drop to about 15 percent of their old value.

Decision: judge the rewind by a loaded temperature check against the old winding's behavior under the same load, and treat any rise in winding temperature at the same output as copper the shop did not put back.

What happens to locked-rotor current and winding resistance? #

Locked-rotor current falls by the same 0.383 factor, because winding impedance grows with the square of the turns while the supply voltage grows with the turns themselves, and phase-to-phase winding resistance reads roughly 6.8 times the old value on the same slot fill.

The locked-rotor kilovolt-amperes, meaning the supply voltage multiplied by that current, come back to their old value, so the locked-rotor apparent power does not move, and starting torque holds with it: unchanged flux and an unchanged effective locked-rotor current keep the starting pull where it was. Any breaker or starter sized around the old inrush amperes still needs the new number, which the next section covers.

Decision: measure and record the phase-to-phase resistance of the old winding before the shop strips the core, note the connection, and multiply that baseline by the turns ratio squared, about 6.8 here, to get the acceptance figure for the new winding measured the same way.

What should the rewind order and the new nameplate say? #

Put the rewind order in writing before the shop starts: 575 V, three-phase, the same frequency and base speed, the same insulation class or better, an inverter-duty system if a drive feeds it, and the shop's calculated full-load current stamped on a fresh nameplate.

The order should carry five items:

  • The old nameplate data, recorded before the motor leaves the wall: horsepower, voltage, full-load current, frequency, speed, frame, service factor, insulation class, connection.
  • The new design in writing: the target voltage, three-phase, same frequency and base speed, insulation class equal or better, inverter-duty insulation if a variable frequency drive feeds the motor.
  • The strip method: a controlled burnout or chemical strip, with a core loss test before and after.
  • The design sheet: turns per coil, wire size and slot fill, connection, calculated full-load current, expected no-load current.
  • The new nameplate: rewound voltage, current, connection, class and frame, with the old 220 V plate removed or clearly marked superseded.

A stale plate from the old winding on a rewound frame is how the next person sets an overload wrong, so the plate swap is part of the job, not paperwork. Decision: buy the design sheet, not just the winding; a shop that cannot show turns, fill and test figures is a shop whose work you cannot verify against the checks in the last section.

What has to be resized outside the motor? #

Every protective setting that came from the old full-load current is wrong by the voltage ratio once the rewind is done: set the overload to the new plate current, match the heaters to it, and re-rate the contactor, breaker and starter for the new system voltage.

The overload relay is the binding change: set it from the new nameplate full-load current, as the guide to setting overload relays from nameplate full-load current describes, because the old setting now sits far above the real current and protects nothing. Heater-type overloads need physical elements matched to the new current; the same trap appears in reverse in the article on 460 V overload heaters failing a 208 V motor conversion.

Contactors, circuit breakers and any soft starter or drive in the line-up need a voltage rating for the new system and settings built on the new current; the article on the soft starter phase loss fault that followed a voltage change shows what a missed voltage step does downstream. Conductors sized for the old current keep spare ampacity at the new one, and the available fault current at the new service voltage must be checked against the interrupting ratings in that panel, because a different service voltage means a different available fault current.

Decision: nothing at the old settings survives the rewind. New full-load current into the overload, heaters to match, and voltage ratings confirmed at the new system voltage before the first energization.

How do you test a rewound motor before it goes back on load? #

De-energize, lock out and verify absence of voltage first, which is what NFPA 70E, the 2024 edition, requires before anyone touches the conductors; then measure insulation resistance to ground, compare the three phase resistances, and run the motor uncoupled at no load.

Confirm the exact lockout steps with your authority having jurisdiction and your plant's electrical safety program before the covers come off. Then run four checks:

  1. Insulation resistance, winding to ground and between phases, with an insulation-resistance tester selected for the winding's voltage class, motor isolated and discharge observed. IEEE 43, the 2013 edition of the insulation-resistance recommended practice, gives the floor most shops test to: at least the rated kilovolts plus 1 megohm corrected to 40 °C, about 1.6 MΩ for a 0.575 kV winding, with the shop's own test report as the other reference.
  2. Phase-to-phase resistance on all three windings, using the method in the article on what a multimeter shows about three-phase motor winding resistance: the three readings within about five percent of each other, at the shop's design figure, and at the old baseline multiplied by the turns ratio squared for the same connection.
  3. An uncoupled run at 575 V: three balanced line currents, well below the new full-load value and close to the shop's no-load report; an imbalance or a reading far off that report points at turns or connection errors.
  4. Rotation confirmed, then a coupled run at real load: line current at the new plate's figure, and winding temperature at steady state inside the insulation class stamped on the plate. Class F, the common choice, is a 155 °C thermal class.

Decision: every check on its number means the rewind is fit for service; any check off its number sends the motor back to the shop with the design sheet figures attached, because the gap is now a documented number rather than a feeling.

Questions asked

Does a motor rewound from 220 V to 575 V still make its full horsepower?

Yes, if the shop holds the original slot fill. Rated power comes from the frame, the shaft and the thermal capacity of the winding, not from the voltage it runs at. Confirm it on the job: at rated speed and load, line current should sit at the new plate's full-load value with winding temperature inside the insulation class. A current far off the plate figure, or a hot frame at plate current, both mean the design needs another look.

Can one winding serve both 220 V and 575 V?

Not by reconnection alone. Reconnecting coils changes the effective turn count in steps of 2 (series to parallel) and about 1.73 (delta to wye), and 575/220 comes to 2.61, which is not one of those factors. A true dual 220/575 rating therefore needs two separate windings or a transformer, while ratios like 2 to 1 or 1.73 to 1 are the ones a rewind can build into a single winding.

Does the locked-rotor code letter change after the rewind?

No. The code letter expresses locked-rotor kilovolt-amperes per horsepower. The locked-rotor current falls by the same factor that the voltage rises, so the kilovolt-amperes stay with the original design and the letter on the new plate should not change. If the shop's test report shows a different locked-rotor figure, the winding design moved away from the original, and you should ask why before accepting the motor.

Is rewinding better than adding a step-down transformer or buying a 575 V motor?

Rewind when the core tests clean, the shop documents turns, fill and test figures, and the frame is sound: that keeps the mounting and avoids a transformer's continuous losses. Feed the existing low-voltage winding through a step-down transformer when the outage window is short or the core is untested. Replace the motor when the core is damaged, or when the stack has already been rewound once and the design margin is spent.

Does no-load current also fall after the rewind?

Yes, by the same turns logic. Magnetizing reactance grows with the square of the turns, so the uncoupled line current should come out near the old no-load reading times the voltage ratio (220/575). That makes a cheap early test: record the old no-load current before the rewind if you can, and compare the shop's uncoupled figure against it before the motor ever sees a load.

Keep reading

  • Explainer

    Why motor current rises when voltage exceeds nameplate

    A supply 4% above nameplate sits inside the ±10% band NEMA MG1 Part 12 expects motors to tolerate. The power equation gives a lower current only if efficiency and power factor are held fixed; rising magnetizing current near saturation can push measured current back up, so keep the nameplate full-load rating and treat the recalculated figure as an estimate.

    Motors and motor starters

  • Explainer

    Wye or delta winding for a 200 hp 480 V motor

    Read the nameplate connection diagram: a 480 V system pairs with a motor marked 460 V, and a NEMA dual-voltage motor takes the series-wye connection for the high voltage. In wye each winding sees 480 V divided by 1.732, about 277 V; wired in delta it would see the full 480 V, a 73 percent overvoltage.

    Motors and motor starters

  • Explainer

    Running a 690 V 50 Hz motor on a 415 V supply

    The nameplate connection decides. Star at 415 V leaves a 690 V star winding near 240 V, so torque drops to about 36% and a loaded motor stalls; the documented 400 V delta connection sits about 4% over its rating, inside the IEC band, and is the correct connection. With no delta listed, feed 690 V or run a drive with a base frequency near 30 Hz.

    Motors and motor starters