Short answer
Electrical lockout on automated equipment isolates energy only through a lockable physical device: a main disconnect, an MCC feeder breaker, a motor disconnect or a panel incomer. A PLC output, contactor, safety relay, E-stop or HMI command stops the machine but isolates nothing. Lock the isolator, let stored energy discharge as the equipment documentation directs, then prove zero voltage at the work point with a proven instrument.
On this page
- Which devices isolate and which only stop
- Trace every source that can feed the work
- Stored energy the disconnect does not remove
- The lockout sequence, step by step
- Worked example: verifying zero voltage on a 480 V three-phase MCC feeder
- Where automation lockout goes wrong
- The standards behind the sequence
- Questions asked
On automated equipment, electrical lockout isolates exactly one thing: the physical device that interrupts the energy supply. A PLC output, a contactor, a safety relay, an E-stop pushbutton or an HMI command can stop the machine, and none of them is an energy-isolating device. OSHA's 29 CFR 1910.147, the control of hazardous energy rule, permits lockout only at a device that physically prevents energy from reaching the work and that offers a means of attaching a lock — a lockable main disconnect, an MCC feeder breaker, a motor disconnect or a panel incomer. From there the sequence is fixed: stop the machine, open and lock the isolator, let stored energy in drive buses, UPS units and accumulators dissipate as the equipment documentation directs, then prove absence of voltage at the terminals you will touch, with an instrument proven on a known live source before and after.
Which devices isolate and which only stop #
29 CFR 1910.147 defines an energy isolating device as a physical device that prevents the transmission or release of energy to the machine: the mechanically operated disconnect switch, breaker or switchgear you open by hand. The rule treats it as lockable when it has a hasp or another attachment point a lock can fasten to, and it defines the lockout device itself as a positive means, key or combination type, that holds the isolator in the safe position.
On an automation line the qualifying devices are concrete: the machine's main disconnect, lockable feeder breakers in the MCC, the motor disconnect at the load, the panel incomer, and medium-voltage switchgear, which the site electrical authority operates. If a device has no means to take your lock, it is not your isolation point, however official its handle looks.
The control layer stops motion, not energy. A PLC digital output opens a coil circuit while the contactor stays bolted to its supply; a safety relay opens its own contacts and the incoming terminals stay live; a drive that reports disabled reports control state, not terminal state. An E-stop is a stop function, and what makes an e-stop motor-starter circuit a validated safety function is its own subject — validation still makes it no isolator. Even a lockable E-stop is a stop control rather than an isolation point; knowledge-base comparison of a lockable E-stop versus a LOTO disconnect for CNC machines works through the distinction device by device.
Trace every source that can feed the work #
Automation cells routinely carry more than one feed: a control-power transformer supplied from an adjacent panel, a separately fed 24 V DC supply, UPS-backed control circuits, bus cross-ties to a neighboring machine, interconnects along the line. Any one of them can put voltage on the terminals behind your locked main. Find them during the survey stage of the site energy-control procedure, from the drawings and then in the cabinet, name an isolation point for each source, and lock every one. The boundary comes from the site procedure confirmed against the wiring, never from the machine's control schematic alone.
Stored energy the disconnect does not remove #
Opening the isolator removes the supply path; it removes nothing already stored. Drive DC bus capacitors hold hazardous voltage after the supply drops, and the discharge wait is the figure that drive's documentation states for that model and frame — never a value carried from another drive, and a display status or a stopwatch alone is no proof; verify the bus at the documented points with the same proven-instrument method. A UPS keeps its output live from batteries whatever its input isolator does, so UPS-backed circuits stay energized behind a locked main. Control power supplies and breaker capacitor trip units hold charge after switching. Pneumatic and hydraulic accumulators store mechanical energy and are blocked or bled under the machine's procedure. The lock prevents re-energization; it discharges nothing.
The lockout sequence, step by step #
- Identify the boundary from the site energy-control procedure: every energy source, one isolation point for each, and who performs any MV switching.
- Stop the equipment with its normal controls, then open each energy isolating device and apply your personal lock and tag at every one; each authorized worker on the job locks every isolation point personally.
- Release stored energy: serve the drive-bus discharge time the equipment documentation states, bleed or block accumulators, and treat UPS-backed circuits as live until verified.
- Prove the test instrument on a known live source, test absence of voltage at the work location on every phase and to ground, then prove the instrument live again. If either live check fails, the verification is void: replace or correct the instrument and repeat the entire test.
- Open nothing until every reading is zero, and apply any temporary grounding the procedure calls for as the site electrical authority directs.
- Restore under the site procedure: each worker removes their own lock, and the article on when operations may reset a tripped breaker or overload sets where that authority begins and ends.
If the isolation point, an energy source or a test result is unclear or conflicts with the site procedure, stop and escalate to the site electrical or safety authority before any work proceeds.
Worked example: verifying zero voltage on a 480 V three-phase MCC feeder #
Inputs, all example values for an illustrative job rather than a measured one: nominal branch voltage 480 V, three-phase, 60 Hz, solidly grounded wye, a common plant feeder; task: replace the leads in a motor terminal box after lockout; instrument: a two-pole tester rated for the measurement category and voltage of the test point, the CAT III 600 V class in this example.
The rule, in words: NFPA 70E, 2024 edition, treats this as part of establishing an electrically safe work condition — separated from every energy source, locked, then absence of voltage verified at the point of work with a rated instrument proven on a known live source before and after. With the isolator locked and the bus wait served, absence of voltage is proven when a proven instrument reads zero on every phase-to-phase pair and every phase-to-ground pair at the work terminals.
The arithmetic: on the live feeder the meter would read 480 V between any two phases, and on a solidly grounded wye the phase-to-ground value is 480 V ÷ 1.732 ≈ 277 V. The check is six readings at the work terminals: A-B, B-C, C-A, then A-G, B-G, C-G. Live, the first three would each show 480 V and the last three about 277 V; isolated, the requirement is 0 V on all six.
The result: with the feeder breaker locked open and the bus wait served, all six readings are zero and both live-source checks pass, so the feeder meets the electrically safe work condition.
The decision: six zeros with a proven instrument means open the terminal box and start the lead replacement. A single reading above zero means the feeder is not isolated: stop, treat everything as energized, find the missed feed, and return to the isolation step. A failed live check voids the test whatever the readings show. The incident energy you accept while making these readings is a separate quantity, and which incident energy applies to a LOTO voltage test on a breaker covers that case.
Where automation lockout goes wrong #
- A stop command read as isolation: contactor open, drive disabled, HMI dark — all report control state while supply terminals stay live.
- The missed second feed: control power or a UPS-fed circuit from another panel keeps terminals live behind a correctly locked main.
- Elapsed time treated as proof of discharge: the wait is the drive's documented figure, and the meter confirms it at the documented points.
- A lock mistaken for discharge: the lock restrains re-energization; stored energy needs its own release and verification step.
- One crew lock shared by many: each authorized worker carries a personal lock, so nobody's safety rides on someone else's key ring.
The standards behind the sequence #
- 29 CFR 1910.147, OSHA's control of hazardous energy rule: defines the energy isolating device, the lockout device and lockability, and sets the program and lock application rules for general industry.
- ANSI/ASSP Z244.1-2024, Control of Hazardous Energy: Lockout, Tagout: the consensus practice for controlling hazardous energy associated with machinery, equipment and processes.
- NFPA 70E, 2024 edition: safety-related work practices, including establishing the electrically safe work condition and verifying absence of voltage with a rated instrument.
Requirements differ by country, edition and local amendment: confirm what applies to your installation with the local authority having jurisdiction and the equipment documentation. Nothing in this article authorizes energized work or replaces your site's written energy-control procedure.
Questions asked
Can tagout replace lockout when the isolator has no lock provision?
Only where the device genuinely cannot be locked. The standard then requires tagout together with added measures that give full protection, such as removing, blocking or continuously supervising the isolating means. Where the device has a hasp or other attachment point for a lock, a tag alone is not a substitute: apply the lock.
How do you establish a drive's DC bus discharge time during lockout?
From that drive's own documentation, for its model and frame size: the manual states the wait and names the points where bus voltage is verified. Never carry one drive's figure to another machine, and treat a display status or a stopwatch alone as no proof. After the wait, confirm the bus with the same proven-instrument method used on the AC side.
Who may remove a personal lock once the job is done?
The worker who applied it, and normally only that worker. If the worker has left site, the site's documented exceptional removal applies: every effort to make contact, confirmation the worker is away, and notice to them on return. Nobody else breaks a lock outside that procedure, whatever the production pressure.
Where does each lock go when several trades work behind one isolator?
On a multiple-lock hasp at the isolation point or into a group lockbox that holds the key. Each authorized worker applies a personal lock before starting and removes it when their own work ends; the isolator resets only when the last lock comes off. The site energy-control procedure documents the arrangement.
Does the voltage test itself carry arc-flash exposure?
Yes: while you take the readings the sources may still be live, so the incident energy for that task at that location comes from the site's arc-flash study, not from the de-energized condition you are working toward. Select PPE from the study's value for the verification task and respect the approach boundaries it sets.