Troubleshooting
Why a 6.6 kV motor reads 4 MΩ after an earth fault trip
Short answer
Keep the 2.6 MW motor out of service. A 6.6 kV form-wound stator must clear IEEE 43-2013 twice — at least 7.6 megohms of insulation resistance at 40 °C (rated kilovolts plus 1) and a polarization index of at least 2.0 — and this one measures 4 megohms with a ratio of 0.65, the signature of moisture or contamination. Verify the relay's earth-fault scaling separately; it does not change the verdict.
On this page
Keep the 2.6 MW motor out of service. After an earth-fault trip, a 6.6 kV form-wound stator that measures 4 MΩ with a polarization index of 0.65 fails both acceptance numbers in IEEE 43-2013, and a clean visual inspection — dry coils, no burn marks, no copper spatter — does not explain those readings away. Resistance that falls instead of climbing over the ten-minute test is the signature of moisture or conductive contamination, and a resistance-limited earth fault can puncture a single coil at the slot exit and go out without leaving anything visible. So test the winding phase by phase at the voltage the standard calls for, keep the supply cable out of the measurement, and establish what the relay's earth-fault element actually measured before quoting the recorded current anywhere.
What the two insulation numbers already prove #
IEEE 43-2013 is the recommended practice for measuring insulation resistance and polarization index on rotating-machine windings with direct voltage, and it sets the acceptance values. For a form-wound stator of this rating the minimum is the rated kilovolts plus 1 megohm, corrected to 40 °C, which works out to 7.6 MΩ for this machine. On the voltage side the standard calls for 2500 to 5000 V DC on a winding rated 5001 to 12000 V, so the acceptance reading comes from an instrument in that band with the winding temperature recorded; readings taken hotter than 40 °C are corrected before they are judged. A 500 V or 1000 V handheld tester is a spot-check instrument at this voltage class, and a higher DC proof voltage is a separate procedure owned by the winding's manufacturer or a repair shop — never a default setting on the test set.
The polarization index is the ten-minute resistance divided by the one-minute resistance at the same voltage. The standard wants at least 2.0 for Class B, F and H systems, which covers most medium-voltage form-wound stators in service, and dry insulation normally climbs well above that as polarization builds. A PI of 0.65 means leakage grew by roughly a third across the test window: water absorbed into the insulation or a conductive film on the bars. Neither shows on a visual check, and dry air removes neither one.
Confirm the acceptance values against the motor manufacturer's documentation for the insulation system, and with the authority having jurisdiction where a plant rule applies.
Checking a 42 A record against the 150 Ω resistor on the 20 kV primary #
Inputs, as reported for this machine:
- System at the motor: 6.6 kV line-to-line, from the machine record.
- Neutral-grounding resistor: 150 Ω at the star point of the 20 kV primary of the supply transformer, from the earthing record.
- Recorded earth-fault current: 42 A, from the relay's event log.
On a system earthed through a resistor, the resistor alone sets the largest sustained earth-fault current: phase-to-earth voltage divided by the resistance, where phase-to-earth voltage is line-to-line voltage divided by the square root of three. If the resistor sat on the motor-side neutral, the limit would be 6600 V / 1.732 = 3811 V, then 3811 V / 150 Ω = 25.4 A. At the star point where it actually sits the same arithmetic gives 20000 V / 1.732 = 11547 V and 11547 V / 150 Ω = 77 A — a cap on primary-side earth-fault current that, unless the secondary winding has its own earthed neutral, does not limit the motor-side fault at all.
The recorded 42 A matches neither figure: it exceeds what a motor-side resistor of that value would allow and stays below what the primary-side resistor allows, so it cannot yet be called primary amperes of a resistance-limited fault. A verified resistance-limited reading must sit at or below the phase-to-earth voltage divided by the resistor; anything above that threshold means the scaling, the CT connection or the earthing topology is not what the record assumes. Establish the relay's earth-fault input — a window CT around the cable, a residual connection of the phase CTs, or a computed residual — with its ratio and its units, and trace on the single-line diagram where the motor-side neutral, if there is one, is earthed. The result is only as good as the protection study and the single-line diagram behind it. Whatever the current turns out to be, the insulation readings fail on their own; no relay finding returns this winding to service.
Why the winding can look undamaged and still be the fault #
On a resistance-grounded feeder the fault current is small enough that the arc's energy is spent in one place: the coil's exit from the slot, where the voltage gradient along the bar surface is steepest. The puncture digs through one coil, the limited current cannot hold a large arc, and the fault burns through and goes out — no copper spatter, no carbonized trail, a stator that looks untouched. That mechanism explains how this machine tripped a feeder while looking clean, and it is why the fault's location must be proven by sectional testing rather than read off the trip: the trip says only that a fault existed inside the measured zone, which takes in cable and terminations too, and the narrowing-down discipline is the one used when locating a ground fault on a resistance-grounded system.
This machine is not the clean case, though. A fault that self-clears usually leaves insulation readings intact afterwards; here the measured resistance sits below the standard's floor and the ten-minute ratio fell, so there are two findings at once: a fault somewhere in the zone, and a winding that is wet or contaminated throughout. The record that the supply cable tested good counts only if that test was made with the cable separated from the machine — a figure taken through the winding is not a cable result.
Sectional tests that find the leakage path #
Isolate the machine under the plant's medium-voltage switching procedure, prove absence of voltage, and apply the procedure's earthing before anyone opens the terminal box; in United States practice NFPA 70E, 2024 edition, frames those steps. Confirm the switching details with the authority having jurisdiction and the site procedure, then work through:
- Disconnect the supply cable at the machine terminals and test it on its own at its approved DC voltage; where the measurement is made matters, as covered in testing insulation resistance from the switchgear versus the motor terminals.
- Disconnect or guard every auxiliary lead bonded to the winding — RTD and space-heater circuits drag readings down — and test them separately against their own limits.
- Test each phase to the frame at 2500 to 5000 V DC, recording resistance at one minute and ten minutes together with winding temperature and humidity.
- Compare the phases: one low phase beside two healthy ones points to a localized puncture in that phase's slot exits; three low, drifting readings point to moisture or contamination across the whole winding.
- Discharge and earth the winding after every reading, for the interval the procedure calls for, before touching leads — an instrument at this voltage leaves the insulation charged.
- If all phases read low with a falling ratio, dry the winding by the manufacturer's method and repeat the full two-number test; recovery confirms moisture, and no recovery sends the machine to a repair shop for coil-level fault location and a core test.
What the relay recorded, and what the settings say #
Save the event record first — the operating element, the current trace, the active setting group, the time stamp — before anyone resets flags or edits the setting file. Then identify the earth-fault measurement itself, because each input looks at a different zone and scales differently: a window CT sees the cable it circles, a residual connection of the phase CTs sees everything downstream, and a misfed element produces trips with nothing behind them, as happens when a 51N earth-fault setting trips without a fault. Read the CT ratio and the display units so the recorded current is known in primary amperes or known to be unknown.
The settings as recorded read as two definite-time stages: stage one picks up at 2.5 A and trips after 1.5 s, stage two picks up at 30 A with a 300 s delay. On those numbers stage two can never operate, because any current that reaches 30 A has already sat above stage one's pickup longer than stage one's delay — so either the two pairs are transposed, or stage two is an alarm or backup stage entered deliberately. Read the relay's element list and the coordination study before changing either stage.
The trip decision itself was right: the recorded current sits far above stage one's pickup, so a real earth fault was caught and cleared inside the stage-one delay. Do not raise pickups to keep this trip from coming back; the winding fails its own tests.
The decision #
Four findings decide this job:
| Finding | What it means | Action |
|---|---|---|
| Resistance below the standard's floor, ratio that fell | Wet, contaminated or punctured winding — possibly more than one | Phase-by-phase test, dry out, retest; no recovery goes to the repair shop |
| Recorded fault current above the resistor's calculated limit | Scaling, CT connection or earthing topology not as assumed | Identify the earth-fault CT, ratio and units; trace the neutral earthing on the single-line diagram |
| Second earth-fault stage that can never complete first | Transposed entry or a deliberate alarm stage | Read the element list and the coordination study before editing |
| Good cable result | Feeder probably sound, if tested disconnected | Confirm the cable test was made with the cable separated at the terminals |
Return the machine to service only when it passes both numbers at the standard's voltage band: at least 7.6 MΩ corrected to 40 °C and a polarization index of at least 2.0. It meets neither today — the measured resistance sits under the floor and the ten-minute ratio fell — so the sequence is sectional phase tests, a drying cycle if the moisture pattern confirms, a repeat test against full acceptance values, and a repair shop with coil-level fault location if the winding will not recover. A single low phase goes straight to the shop without a drying cycle. Sort the relay's scaling and the earthing topology out for the record, and change settings only on the coordination study's authority; neither action changes the verdict on the winding.
Questions asked
What DC test voltage does the standard give a medium-voltage stator winding?
The standard calls for 2500 to 5000 V DC on windings rated 5001 to 12000 V, so the acceptance reading comes from an instrument in that band with the winding temperature recorded and the result corrected to 40 °C. A 500 V or 1000 V handheld tester is a spot-check tool at this voltage class. Any higher-voltage proof test runs only under the manufacturer's or repair shop's written procedure.
Can the winding clear the resistance floor and still be rejected?
Yes. The polarization index fails on its own: a ten-minute ratio below the standard's minimum of 2.0 rejects a Class B, F or H stator even when the one-minute resistance clears the megohm limit, because a flat or falling reading means leakage grew during the test. Judge both numbers together, at the correct test voltage and a recorded temperature.
Should the earth-fault pickup be raised so this cannot happen again?
No. The recorded 42 A sits far above the 2.5 A stage-one pickup, so the element did what it was set to do: it caught a real earth fault and cleared it inside the 1.5 s delay. Raise the pickup only after a verified measurement problem — never to keep a winding that fails its insulation tests connected.
Could the earth fault still be in the cable if the cable tested good?
Only if that result came from a test made with the cable disconnected and at its own approved DC voltage. A reading taken through the motor winding, with both terminations included, or at reduced voltage can pass a cable that tracks at a termination. Test the cable alone first; the combined feeder-plus-machine figure comes later, once the winding itself is healthy.