Short answer

Enter the nonmagnetic (PVC) conduit entry when the run is mostly PVC; give steel elbows their own steel segments only if your method accepts them. A bolted fault is a zero-impedance fault at the point of study, so it yields the maximum available current, limited by the source and path impedance alone, and it is the value compared against interrupting ratings and SCCR.

On this page
  1. What a bolted fault is
  2. Where conduit material enters the calculation
  3. The conduit entry decision, case by case
  4. Worked example: the service-main number you start from
  5. Carrying the study past the service main
  6. Procedure: conduit entry and the downstream model
  7. Questions asked

Enter PVC. When the conduit run is mostly PVC with steel elbows at the bends, the single conduit entry for the fault-current calculation is the nonmagnetic (PVC) one, and the elbows become short steel segments only if your calculation method accepts mixed runs. A bolted fault is a zero-impedance fault assumed at the point under study: the maximum available current, limited only by the source and conductor impedance ahead of that point, and the number you compare against interrupting ratings and short-circuit current ratings. Your shop's work starts from the engineering outfit's service-main value; every MCC, panelboard, switchboard and disconnect downstream sits behind more conductor impedance, so its available fault current is lower.

What a bolted fault is #

Zero impedance at the fault means the calculation treats the three phases as solidly joined at the study point, so nothing at the fault itself limits the current. The result is set entirely by what is upstream: the utility source, the transformer, and the conductors between them. IEEE Std 141-1993, the Red Book recommended practice for industrial power distribution, builds its short-circuit calculations on the bolted three-phase fault as the basis for applying equipment.

On the code side, NFPA 70, the National Electrical Code, 2023 edition, requires in 110.9 that equipment intended to interrupt fault current have an interrupting rating at least equal to the current available at its line terminals, and 110.24 requires service equipment in other than dwellings to be field-marked with the maximum available fault current and the date of the calculation, re-marked when modifications raise it. Real faults are not bolted: arcing and contact impedance reduce the current that actually flows, and arc-flash studies estimate arcing current downward from the bolted value.

Bolted is a convention on paper. Never create a short circuit to check a calculated value, and open a panel or terminal box only after de-energizing, locking out and testing for absence of voltage. Confirm the marking and rating requirements with your authority having jurisdiction and the equipment documentation.

Where conduit material enters the calculation #

Fault current at any point depends on the impedances between the source and the fault location, and conductor impedance is where the raceway shows up. In the point-to-point short-circuit method behind the fuse-industry coordination guides (Eaton's formula set is one example), each conductor run contributes:

f = (1.732 × L × I) / (C × n × V)

where L is run length in feet, I is the available fault current upstream in amperes, n is the number of conductors per phase, V is line-to-line voltage in volts, and C is a factor read from the method's table for the conductor's size and material. Those tables split raceway into two classes: nonmagnetic, meaning PVC or aluminum, and steel. Steel conduit adds reactance, so its C value is lower and the calculated downstream current is lower. NFPA 70, 2023 edition, makes the same split in Chapter 9, Table 9, which lists conductor impedance separately for PVC, aluminum and steel raceways, with the steel columns carrying the higher reactance.

The raceway class therefore changes the answer only through reactance and only in proportion to length: at the transformer terminals, L = 0 ft, it has no effect at all, and on a long feeder it can move the result enough to matter. Each run then steps the current down as:

I at fault = I × 1 / (1 + f)

which is exactly why segmented modeling works when a tool offers it.

The conduit entry decision, case by case #

Field condition Single-entry choice If your tool takes segments
Mostly PVC with steel elbows PVC (nonmagnetic) PVC for the straights, steel for the elbow sections
Mostly steel (EMT, GRC, RMC) with PVC sleeves Steel Steel for the metal length, PVC for the sleeves
Aluminum conduit anywhere in the run Nonmagnetic, the same column as PVC As installed
Unknown mix, one entry only Predominant material, then run the other entry to bound the answer Not available

For the run in question, mostly PVC with steel at the elbows, enter PVC. If the software accepts conduit by section, model the elbows as steel segments at their actual length; the extra effort is minutes. Never reclassify the whole run as steel because steel appears at fittings: that understates the available fault current at every downstream bus, and equipment applied against an understated current is under-rated for the fault it must clear. With one entry only, PVC is also the conservative direction for interrupting-rating and SCCR comparisons, because the nonmagnetic class calculates the higher current.

Worked example: the service-main number you start from #

The transformer-side arithmetic is the one walked through in calculating transformer interrupting current from impedance. Example inputs, all from a hypothetical nameplate on a 12.47 kV to 480 V pad-mount: 1000 kVA, three-phase, 480 V secondary, 5.75 percent impedance, source impedance neglected.

  • Full-load current: I = 1,000,000 VA / (1.732 × 480 V) = 1203 A
  • Bolted three-phase current at the secondary terminals: I = 1203 A / 0.0575 = 20,922 A, about 20.9 kA

That 20.9 kA is the ceiling at the transformer terminals with an infinite source behind it; the study's utility source data pulls it down slightly, and every foot of conductor pulls it down more. Voltage moves it linearly: the same method treats a bus running 10 percent high as 10 percent more fault current, so 20,922 A × 1.10 = 23,014 A, about 23.0 kA, on a system at 528 V. Each feeder then steps the number down by its own 1 / (1 + f), using the C factor for that conductor size and raceway class, run by run, out to the last disconnect.

Carrying the study past the service main #

The engineering outfit's model ends at each facility's service main; yours begins there. Ask for the available fault current at each service main, the calculation date, and the assumptions behind it, and treat that value as the source for your downstream model rather than assuming one. Scoping an arc flash study you can maintain in ETAP covers keeping that handoff maintainable when the study changes hands.

Then add each downstream run's impedance segment by segment. The fault current at a service main is not the fault current at every MCC, because the conductors between them add impedance at every step. The comparison the code drives at is local: the interrupting rating and SCCR of each breaker, panel and disconnect must handle the calculated available fault current at its own line terminals, not at the service.

Procedure: conduit entry and the downstream model #

  1. Mark the handoff boundary, each service main, on the single-line diagram and obtain the study's available fault current, its date and its assumptions there.
  2. Walk each feeder and record conduit material by section, the steel elbows in the mostly PVC run included, with lengths.
  3. Check what your tool accepts: one conduit class per run, or segments. Use the PVC entry for a mostly PVC run either way, steel segments when supported.
  4. Enter conductor size, material, length and count per phase, and read C, or R and X, for that conductor and raceway class.
  5. Calculate the bolted three-phase fault at each bus, stepping from the service-main value through each run's 1 / (1 + f).
  6. Compare locally: interrupting rating and SCCR at or above the available fault current at each equipment's line terminals. When a mixed run allows only one entry, run both classes and hold the higher result for those comparisons.
  7. Record the single-material approximation with the calculation, and recalculate and re-mark the service equipment if upstream modifications increase the available fault current.

For the case that prompted this: PVC entry, steel segments if the tool allows them, and the study's service-main value as your source, with the bolted assumption stated in the calc notes so the next engineer knows exactly what the number represents.

Questions asked

Is the PVC entry the conservative choice?

For interrupting ratings and SCCR, yes: the nonmagnetic entry carries the higher C factor, so it calculates the higher fault current, and equipment rated above that number is covered either way. Arc flash is the exception. A lower fault current can stretch clearing time and raise incident energy, so evaluate the arc flash using the reduced current from the steel segments too, not only the maximum.

Which runs does the raceway class matter most on?

Long runs and large conductors. Reactance is where steel versus nonmagnetic shows up, and on a big conductor reactance dominates resistance, so the raceway class moves the result more. On a short run of small conductors the difference is usually buried by everything else. Run the feeder both ways in your tool and record the delta rather than trusting a rule of thumb.

What should we ask the engineering outfit to hand over at the service main?

The available fault current at each service main with its calculation date, plus the inputs behind it: utility source strength or fault duty and X/R ratio, transformer kVA and percent impedance, conductor sizes and lengths, and the fault type calculated. That is what your downstream model needs as its source, and it lines up with the service-equipment marking NFPA 70 requires.

Does bolted mean the phases are physically connected together?

Only as a modelling convention, not a field condition. The bolted three-phase fault assumes zero impedance at the study point so the result is the maximum the source and path can deliver. Real faults include arcing and contact impedance and deliver less current; IEEE Std 1584-2018 estimates arcing current from the bolted value when calculating incident energy.

Keep reading

  • How-to

    Closed delta transformer fault current calculation

    Compute each delta branch from its own kVA and impedance, then take phasor differences at the line terminals: for a 150 kVA leg with two 100 kVA legs at 240 V and 3.3% Z each, the bolted three-phase terminal fault is highest at each end of the 150 kVA winding and lower at the junction of the two 100 kVA windings. Size secondary equipment on the higher terminal value.

    Protection: breakers, fuses and SCCR

  • How-to

    Calculating Transformer Interrupting Current From Impedance

    Use the impedance's own base: 10.2% is stated on the 8,333 kVA self-cooled (OA) rating, so rated current at 5.04 kV is 1,653 A and the transformer-limited secondary fault current is 1,653 ÷ 0.102 ≈ 16.2 kA. That figure sizes a breaker on the secondary bus; a primary breaker's interrupting rating is set by the upstream available fault current, not by the transformer.

    Protection: breakers, fuses and SCCR

  • Troubleshooting

    Why a feeder breaker trips before the branch breaker

    A feeder breaker opens before a branch breaker because the ampere rating sets continuous current, not speed: on a solid short both devices sit in their instantaneous region and the faster curve wins regardless of size. Compare both time-current curves at the calculated available fault current; if the feeder's instantaneous band sits below that current, replace the upstream device with one that waits — short-time delay or a fuse from selectivity tables.

    Protection: breakers, fuses and SCCR