Diagnosing dissolved gas in wind turbine step-up transformers

Power quality and harmonics Published 10 min read

Short answer

Rising hydrogen, methane, ethane and acetylene at all five 2.5 MVA turbine transformers — with the 11 MVA main clean and a higher-V/Hz replacement gassing identically — rules out core overexcitation and points at a condition shared by the converter-fed units. The next step is correlating gas-generation rates with terminal waveforms, oil temperature and apparent power; hydrogen alone is not proof of partial discharge.

On this page
  1. What does the dissolved gas pattern in these transformers mean?
  2. Why do the turbine transformers gas while the main transformer stays clean?
  3. How do you compare gas levels between the five units?
  4. Is 2-3% total harmonic distortion enough to gas a transformer?
  5. Could the 150% capacitor-switching overvoltage be the cause?
  6. Did the higher V/Hz replacement transformer rule anything out?
  7. Can low power factor overload a 2.5 MVA transformer at low output?
  8. How do you measure the terminal waveform safely at 34.5 kV?
  9. What should this wind farm do next?
  10. Questions asked

All five 2.5 MVA turbine transformers are gassing while the 11 MVA main stays clean, and a 2.6 MVA replacement built for a higher V/Hz gassed the same way within months — that combination points at an operating condition shared by the converter-fed units, not at a bad batch of cores. Hydrogen, methane, ethane and acetylene rising together on every unit justify a formal diagnosis, but the gas list alone does not prove partial discharge. The program that answers this plant is a time-correlated one: dissolved-gas generation rates from fixed-interval samples, set against terminal waveforms, oil temperature and apparent power at each unit. Run it once, properly, and it separates converter switching stress, the utility's capacitor-switching overvoltage and reactive-power duty — and it names the unit, if any, that comes off line.

What does the dissolved gas pattern in these transformers mean? #

Hydrogen, methane and ethane rising with acetylene on all five units is a mixed discharge-plus-thermal signature that justifies a formal diagnostic program, but the gas list by itself is not proof of partial discharge inside these transformers.

Each gas carries its own message. Hydrogen and methane accompany partial discharge and low-temperature decomposition of oil; ethane goes with oil breaking down below heavy-overheat temperatures; acetylene accompanies high-energy arcing and is the gas that changes the urgency. A published 2024 analysis of wind-turbine transformer DGA found this split across the population: turbine-side units dominated by discharge-type gases, grid-side transformers trending thermal. This plant fits the population; it is not an outlier, and it still has a specific cause to find.

Order the complete laboratory panel, not four gases: carbon monoxide and carbon dioxide read the solid insulation, and moisture moves the hydrogen number on its own. Interpret the results by the procedures in IEEE C57.104-2019, the IEEE Guide for the Interpretation of Gases Generated in Oil-Immersed Transformers, which covers concentration limits and — more useful here — generation rates; confirm the applicable limits against the transformer manufacturer's documentation. Before accepting partial discharge as the verdict, rule out stray gassing in power transformers: some refined oils release hydrogen and ethane at normal operating temperature with no internal fault, and the oil supplier's data says whether these units' fill is one of them. Acetylene standing essentially alone would point elsewhere again — troubleshooting high acetylene with negligible hydrogen in transformer DGA covers that different signature — but this plant has acetylene with the other gases present.

Why do the turbine transformers gas while the main transformer stays clean? #

Because only the five 2.5 MVA units sit behind full-power AC-DC-AC converters on a capacitance-heavy underground collector, under a controller that can concentrate reactive power on them — conditions the 11 MVA grid-side transformer never sees.

The gassing boundary follows the converter interface, not geography. Two units stand near the substation and one carries twice the gas of the other; two more stand over 10 km out with the same spread between them, so location explains nothing here. What the five share is the converter on the 690 V side, roughly 20 km of underground 34.5 kV collector cable, and a plant controller in fixed power-factor mode that orders reactive power onto whichever units happen to be running.

The main transformer's clean record is itself a datum. The capacitor-switching overvoltage reaches the turbine units through that 11 MVA transformer without gassing it, so if that transient is the mechanism, something between the 44 kV entrance and the turbine terminals — the collector's capacitance ringing against transformer inductance, or the converter's contribution — is amplifying it or adding to it. That is a measurable question, not a guess.

How do you compare gas levels between the five units? #

Judge each unit by its gas-generation rate in ppm between samples, not by its concentration: the neighbor showing twice the level may simply hold less oil, sit on a different sampling baseline or run hotter, and the rate ranks severity honestly.

A concentration is a history; a rate is a condition. Take each unit's consecutive results, subtract the earlier from the later, divide by the months between them, and rank the units on that number. Normalize before comparing anything else: oil volume differs between designs, sampling dates drift, and a unit that runs hot loads its own baseline.

The decisive fact in this data set is that all five units rise at a similar rate. One unit gassing suggests a defect; five moving together suggests a duty — which is why the electrical measurements in the rest of this article matter more than another oil sample on its own.

Is 2-3% total harmonic distortion enough to gas a transformer? #

Not on the evidence presented: 2-3% aggregate THD at full load is modest, and the figure proves little until you know whether it describes voltage or current, at what analyzer bandwidth, and what the spectrum looked like at low load.

Two details decide what that number excludes. Aggregate THD squares components together, so a small current at a high harmonic order barely moves the total while winding eddy loss rises roughly with the square of frequency — the orders that stress the winding are exactly the ones a summary hides. Analyzer bandwidth caps what exists as far as the instrument is concerned: a 2-3% reading says nothing about content above the resolved band or about half-cycle impulses between samples.

The same trap as assessing VFD harmonics when one small drive runs a plant: a single total is not a spectrum. Repeat the measurement recording voltage and current per harmonic up to the instrument limit, at full load and at the low-load points where content measured higher, with the bandwidth written on every plot. Low load is also when the controller concentrates reactive duty on the few running units, so time-stamp every file.

Could the 150% capacitor-switching overvoltage be the cause? #

Treat it as a suspect to be confirmed or cleared in one capture, not as the cause: a half-cycle event near 150% reaching the turbines less than once a day can stress insulation, but infrequent arrival does not match steady, similar-rate gassing at all five units.

First pin down what 150% means. A peak referred to nominal peak and an RMS reading are different stresses; once restated, the number is compared against the transformer's insulation documentation and the arrester protective levels on that feeder — the equipment documentation, not a rule of thumb.

Second, capture the event twice on one clock: at the 44 kV entrance and at an affected turbine's terminals. The power-quality analyzers already in service caught this event and little else, which is expected — analyzers summarize, they do not preserve fast waveforms. Roughly 20 km of 34.5 kV cable is a large capacitor, and its capacitance against transformer and source inductance forms a resonant path that can ring the arriving wave well above what entered. How the utility's 30 MVA bank is configured and protected shapes what it launches in the first place; wye vs delta medium-voltage capacitor bank protection covers those differences.

If the terminal trace rings markedly harder than the entrance trace, the collector is amplifying and mitigation is local — arresters or reactors at a location chosen with the manufacturer. If the two traces match, clear the bank: under one event a day cannot drive a steady rise on five units, and the hunt moves back to the converter interface.

Did the higher V/Hz replacement transformer rule anything out? #

Yes: the 2.6 MVA unit built for a significantly higher V/Hz gassed identically within months of entering service, with its harmonic factor still 1, so core overexcitation and undersizing are eliminated and further replacement transformers would repeat the result.

That replacement was a clean experiment and the answer is in. A higher V/Hz rating removes core overexcitation from the suspect list, and a harmonic factor of 1 — as it was on the originals — means neither unit carried specified harmonic margin, so the trial changed V/Hz capability, not harmonic capability.

Decision: leave the replacement in service under the monitoring program and spend the next budget on measurement, not on a third design iteration. Re-specifying becomes right only if the correlated data later shows a specific stress that a different design would actually address.

Can low power factor overload a 2.5 MVA transformer at low output? #

Yes: at 0.50 MW and 2.40 MVAr the unit carries 2.45 MVA, which is 98% of its 2.5 MVA nameplate, while the turbine delivers 23% of rated power — and winding heating follows current, not kilowatts.

Run the arithmetic on the worst case the controller can create: one or two turbines online at low output, fixed power-factor mode, converter capability 2.7 MVA against the 2.5 MVA transformer.

S = √(P² + Q²) = √((0.50 MW)² + (2.40 MVAr)²) = √(0.25 + 5.76) MVA = 2.45 MVA

Rated current at 34.5 kV is 2,500 kVA ÷ (√3 × 34.5 kV) = 41.8 A, and at 2.45 MVA the winding carries 2,450 kVA ÷ 59.8 kV = 41.0 A — 98% of rated. Losses and heating follow that current, so a turbine idling at 0.50 MW, 23% of its 2.2 MW rating, can still hold its transformer essentially at full thermal duty before any harmonic content is added. Treat the arithmetic as an estimate to check against the nameplate and the transformer documentation.

Decision: constrain the controller so no single unit is dispatched above 2.4 MVA during low-turbine-count operation, and log apparent power and top-oil temperature continuously while the constraint is in.

How do you measure the terminal waveform safely at 34.5 kV? #

Through permanently installed, correctly rated voltage dividers — never by clipping bench instruments to live terminals — because a 100 MHz oscilloscope only shows what its probe chain passes, and switchgear voltage transformers roll off far below converter switching frequencies.

The scope is the easy part. What decides whether the capture is worth anything is the sensor chain: a divider rated for 34.5 kV and for the frequencies of interest, probes with the isolation and common-mode performance those voltages demand, and leads dressed so the probe is not the resonant circuit being measured. Agree the instrumentation with the measurement-equipment and transformer manufacturers before energizing the campaign.

Safety boundary: NFPA 70E, 2024 edition, the Standard for Electrical Safety in the Workplace, requires an electrically safe work condition — lockout and verified absence of voltage — before any terminal compartment is opened, and live capture happens only through permanently installed instrument connections under the site's documented procedures; confirm those requirements with the authority having jurisdiction and the equipment documentation. No gas investigation justifies a probe on a live 34.5 kV bushing.

Trigger the recorder on the capacitor event and hold weeks of continuous data. One fanless mini PC logging the electrical, temperature and event channels beside the switchgear keeps a single time-stamped file for the whole program.

What should this wind farm do next? #

Stop ordering transformers and run one correlated program: gas-generation rates, terminal waveforms, oil temperature and apparent power on a common time base, then act on whichever mechanism lines up.

  1. Put all five units and the main on a fixed-interval sampling schedule at one laboratory; compute generation rates per IEEE C57.104-2019 and rank the units by rate.
  2. Ask the transformer manufacturer two questions in writing: whether this oil shows stray-gassing tendency, and whether the tanks contain internal fuse links — a documented wind-farm case traced discharge-type gases to frequent arcing of internal fuses under heavy load cycling.
  3. Constrain the controller to 2.4 MVA on each unit during low-turbine-count operation, and log apparent power and oil temperature continuously.
  4. Capture the next capacitor-switching event simultaneously at the 44 kV entrance and at a turbine terminal; restate the 150% figure as peak or RMS and compare it against the insulation documentation.
  5. Run the divider-based terminal recording; if content in the kHz range and above tracks converter switching, commission an online partial-discharge survey.
  6. Take a unit off line only on accelerating acetylene, an accelerating total generation rate, or a gas-accumulation relay operation — hydrogen alone does not justify it.

Questions asked

How often should oil be sampled during an active gassing investigation?

Sample every affected unit monthly at a constant interval, through one laboratory and one extraction method, recording oil temperature and tap position with each sample. A defensible generation rate needs that consistency; switching labs or methods mid-program shifts the numbers enough to fake a step change, and a single sample never shows a rate at all.

What transformer design change would help if converter stress is confirmed?

If the terminal recordings show sustained high-frequency content tracking converter switching, the fix is a winding and insulation design qualified for that duty: harmonic margin above the factor-1 baseline, reinforced insulation where fast fronts concentrate stress, and filtering at the converter output. Order it against the measured spectra, not against the gas result alone, because the same gas pattern can come from several stresses.

Could the underground collector cables be the source of the gas?

No. The gases are dissolved in transformer oil, and the cross-linked polyethylene collector has no oil to decompose, so a cable cannot be the source. The cables' role is electrical: their capacitance rings with transformer and source inductance when the utility switches its bank, shaping the transient that reaches each winding rather than generating gas themselves. A failing cable announces itself through relay operations, not slow oil gassing.

What test would actually confirm partial discharge?

An online partial-discharge survey at the transformer bushings, using coupling capacitors or ultra-high-frequency sensors, run while the converter operates at several load points. If discharge activity tracks converter switching or the capacitor-switching transient, the mechanism is named and the manufacturer can specify repair or redesign. The survey needs the manufacturer's guidance on sensor access points and on interpreting results in a converter-fed installation.

Keep reading

  • How-to

    Calculating voltage drop through step-up and step-down transformers

    Yes. A primary voltage drop passes through the turns ratio almost one-for-one in percent — 5% low at 12 kV is 5% low at 480 V — so the study must run every segment from the generator terminals to the farthest branch outlet, combining drops as percentages.

    Power distribution and transformers

  • Troubleshooting

    Diagnosing current imbalance across every motor on a service

    Compute unbalance per NEMA MG-1 as maximum deviation from the three-phase average, not the min-to-max spread: a 13% spread is 6.5% unbalance. Identical A-mid, B-low, C-high readings on ten different motors mean the asymmetry is upstream of the machines, so measure voltage unbalance and negative sequence at the motor terminals and current sharing in the parallel feeder sets, not ten motor circuits.

    Power quality and harmonics

  • How-to

    Estimating transformer energization voltage sag from source impedance

    Screen the dip in pu with |ΔV|pu = k × St ÷ Ssc, using k = 10–12 times transformer full-load current at about 0.1 power factor. A 50 MVA transformer on a 500 MVA short-circuit source screens at 1.0–1.2 pu, which invalidates the fixed-current method and calls for a transient study; a 5 MVA unit on the same bus screens at 0.10–0.12 pu, a usable bound.