Handling generator fault-current decay in arc flash studies

Electrical safety and codes Published 7 min read

Short answer

IEEE 1584-2018 calculates incident energy from a bolted RMS symmetrical current and models no decrement, so a decaying generator contribution cannot be entered directly. Split the event into intervals, recalculate the arcing current in each, and verify breaker pickup at the steady-state arcing current before using any result below the fixed-current value.

On this page
  1. What IEEE 1584-2018 accepts as input
  2. Confirm the basis before you enter the value
  3. When a fixed current is good enough
  4. The piecewise interval method
  5. Worked example: piecewise screen for a generator-fed 600 V bus
  6. Pickup at the minimum arcing current decides the answer
  7. Documenting the extension
  8. Questions asked

No edition of IEEE 1584 models a decaying fault current. The 2018 equations accept one bolted three-phase RMS symmetrical current and one clearing time, so the exponential decay on a generator-fed 600 V bus cannot be entered directly. The fixed 56 kA study is not automatically conservative either: decay can pull the arcing current below the breaker's pickup and stretch the arc past the 0.2 s trip, which raises energy instead of lowering it. The defensible route is a piecewise interval calculation plus a pickup check at the minimum arcing current, run and reported as your own extension of the standard. The numbers set labels and PPE; they never license live work — de-energize, lock out and verify absence of voltage before any cover comes off, which is the territory of NFPA 70E, 2024 edition, the standard for electrical safe work practices.

What IEEE 1584-2018 accepts as input #

IEEE 1584-2018 provides the empirical model for predicting arcing current, incident energy and the arc flash boundary. Its current input is the bolted three-phase fault current in symmetrical RMS amperes, valid at 0.5 to 106 kA between 208 V and 600 V and 0.2 to 65 kA above 600 V. A 600 V bus at the stated value sits comfortably inside the valid window. What the model never sees is time: it takes no decrement curve and no asymmetrical current, which is X/R dependent and also outside the model. Both gaps are real, and both are yours to close outside the published equations.

That bolted current comes from your short-circuit study — methods in the ANSI C37.010 family are typical — and the arcing current is then derived from it; see how arcing current is calculated from the maximum bolted fault for that step. Confirm the requirements you apply with the authority having jurisdiction and the equipment documentation, since editions and local amendments differ.

Quantity Role in the study Your decision
Bolted RMS symmetrical current The model input, from your short-circuit study One value per interval
Asymmetrical current X/R dependent, not a model input Never substitute it
Arcing current Sets the energy rate and the device response Recompute for each interval
Clearing time Sets the exposure duration Read from the time-current curve at that interval's arcing current

Confirm the basis before you enter the value #

Generator short-circuit studies normally quote the half-cycle subtransient value — the RMS current at 8.33 ms on a 60 Hz system — and that figure is an RMS symmetrical value you can enter directly. The case as stated, though, calls the number an "initial peak". If the source document really means a crest, the RMS symmetrical entry is 56 / √2 = 39.6 kA. Both values fall inside the model's valid range at 600 V, so the basis, not the range, decides the input.

Decision: use the stated value only after the study that produced it confirms RMS symmetrical. Never feed a crest or an X/R-dependent asymmetrical figure to the arcing-current equation; the one legitimate conversion is the division by √2 shown above.

When a fixed current is good enough #

A stiff utility transformer holds its contribution almost flat over a 0.2 s clearing time, and the fixed-current study stands as written. Generators — marine, islanded or standby plants — and large motor groups on the bus are the opposite: their contribution falls while the arc is still burning, so a single number misstates both the energy rate and the device response. Incident energy follows current and duration far more than voltage, which is why voltage barely changes NFPA 70E incident energy.

Decision rule: generators or a significant motor contribution on the bus means you run the intervals; a utility-only feed with no local generation does not.

The piecewise interval method #

No interval scheme exists in the 2018 edition, and decrement language has been discussed for a future revision without anything adopted. Until then, this is the method that represents decay honestly:

  1. Get the source decrement data through the whole prospective arc duration, down to and including the steady-state contribution.
  2. Set interval boundaries where something changes: a bus tie opening, a source disconnecting, or a clear step on the decrement curve.
  3. For each interval, solve the network for the bolted RMS symmetrical current from the sources still connected.
  4. Compute that interval's arcing current, then its incident energy, with the same electrode configuration, enclosure, box size, gap, working distance and units in every interval.
  5. Check, for each interval, that the device meant to clear is still picked up at that interval's arcing current.
  6. Sum the interval energies only once every interval is consistent.

Two shortcuts are not acceptable: a time-weighted average bolted current, and a synthetic RMS value built from the initial peak and the final current. Neither reproduces what the arcing-current equation or the time-current curve sees. Keep one short-circuit calculation method across all intervals too — different methods give different bolted values, and mixing them shifts the result for reasons that have nothing to do with decay.

Worked example: piecewise screen for a generator-fed 600 V bus #

Inputs, each with its source:

  • Bus: 600 V three-phase switchgear, the case in question, inside the 2018 model's 208 to 600 V window.
  • Bolted three-phase fault current: 56 kA subtransient, RMS basis to be confirmed as above.
  • Decay: exponential toward steady state across the arc duration; the curve comes from the generator data.
  • Primary clearing: 0.200 s at the feeding breaker.
  • Topology, from a reported marine arrangement of the same kind: four generators in parallel, two per bus, a bus tie that opens at 0.040 s, and generator breakers delayed to 0.500 s. Equal machines assumed, so the tie opening leaves two of four generators — half the contribution.

Rule in words: incident energy scales with arcing time, and for this screen the energy rate is taken proportional to the current contribution. The full method recalculates the arcing current in each interval with the standard's equations; the proportionality only sizes the effect before that work.

Arithmetic, in units of full-contribution energy rate times seconds:

  • Fixed-current study: 1.00 × 0.200 s = 0.200.
  • Piecewise with the tie step alone: (1.00 × 0.040) + (0.50 × 0.160) = 0.040 + 0.080 = 0.120, which is 0.120 / 0.200 = 60% of the fixed-current result.
  • Generator decay inside each interval pushes it lower still; one exploratory marine calculation reported below 50% of a fixed study built on half-cycle subtransient values.
  • Pickup-failure branch: the decayed current never picks up the primary, and the generator breakers end it at 0.500 s: (1.00 × 0.040) + (0.50 × (0.500 − 0.040)) = 0.040 + 0.230 = 0.270, which is 0.270 / 0.200 = 135% of the fixed-current result.

Result: 60% of fixed from the topology step alone, under 50% with full decay in the one reported study, and 135% if pickup fails and the backup clears.

Decision: the piecewise number may go on the label only after the device's time-current curve demonstrates pickup at the steady-state arcing current. Until that is shown, the extended-duration case governs, and it exceeds the fixed-current study — so the fixed value is not the safe default it looks like.

Pickup at the minimum arcing current decides the answer #

The 2018 edition already computes a reduced arcing-current case for setting clearing time; on a decaying source, carry that check all the way down to the steady-state arcing current, because that is the floor the arc can reach while still burning. Read the actual clearing time off the device's time-current curve at that current — why clearing time is based on the arcing current, not the bolted current — and include the steady-state generator contribution whenever it can govern pickup.

Where decay is fast and steady-state fault current is small, protection built for that condition exists: why voltage-restrained 51V protection is used where fault current decays quickly covers the relay approach that holds sensitivity as the current falls.

Documenting the extension #

A piecewise study is your engineering extension, not an IEEE 1584 procedure, and the report has to read as one: record where every decrement curve came from, the RMS basis of every bolted value, each interval boundary and why it sits there, every topology state with its switching time, the pickup status at each interval's arcing current, and the accumulated energy with its configuration and units. State the short-circuit method used and keep it constant. Close with the sensitivity comparison against the fixed-current study, and name the case that governs the label.

Questions asked

Does any edition of IEEE 1584 account for fault-current decay?

No. The 2018 edition takes a single bolted three-phase RMS symmetrical current and models neither the time decrement nor the X/R-dependent asymmetrical current. Decaying sources have to be handled outside the published equations as a documented interval extension. Language covering decrement has been discussed for a future revision, but nothing is in the standard today.

Can I enter the generator's steady-state fault current instead of the subtransient value?

No. A steady-state-only input deletes the highest-energy early interval and mis-times the device response, and one number can never represent a changing current. Enter the subtransient value as the first interval, then follow the decrement curve interval by interval down to the steady-state contribution.

Can decaying fault current make an arc flash worse?

Yes. Decay that drops the arcing current below a breaker's pickup leaves the arc burning until a backup device clears it. In the worked screen in this article, the same event moved from 60% of the fixed-current energy with pickup verified to 135% when pickup failed and clearing stretched to 0.5 s.

What data does a piecewise generator study need?

Generator decrement curves or the reactances behind them, meaning subtransient, transient and synchronous values, the exciter response, the time-current curves of every device that could clear, and the switching times of ties and breakers. The decrement curves are usually the hardest item to obtain accurately from the manufacturer.

Is the marine study's under-50% figure a correction factor I can apply?

No. It came from one exploratory calculation on one generator set, with the method still under investigation. Treat it as evidence that decay matters and as a reason to run your own intervals, never as a multiplier on a fixed-current result.

Keep reading

  • Explainer

    Why voltage barely changes NFPA 70E incident energy

    Incident energy is set by arcing current and clearing time, not the nominal voltage: an arc drops roughly 80–200 V of its own, so at 480 V it draws well under bolted-fault current and the clearing device sits in a slower part of its curve. The simplified equations in earlier NFPA 70E editions were stated valid 16–50 kA; below 16 kA use IEEE 1584-2018, stated for 500 A to 106 kA at 208–600 V.

    Electrical safety and codes

  • How-to

    Which breaker sets MCC arc flash duration

    Use the MCC main breaker's clearing time only for faults on its load side. In an MCC with no documented arc-resistant rating — including early-1980s lineups — treat arc propagation ahead of the main as credible and take duration from the upstream 480 V switchgear breaker: at 20 cycles instead of 6, incident energy multiplies by 3.33. Where construction leaves the path uncertain, calculate both cases and label the higher result.

    Electrical safety and codes

  • Selection guide

    Using a motor circuit breaker on a servo infeed

    Yes — a GV2ME-class manual motor controller is acceptable on a servo drive infeed when the drive manual lists that device class for short-circuit protection, its short-circuit rating at the panel voltage exceeds the available fault current, and its thermal dial is set to the drive's rated input current. A UL 1077 supplementary protector alone is never the branch-circuit protective device under NFPA 79 or the NEC; replace each one with a UL 489 breaker, a listed fuse, or an approved motor circuit breaker.

    Electrical safety and codes