How-to
Which breaker sets MCC arc flash duration
Short answer
Use the MCC main breaker's clearing time only for faults on its load side. In an MCC with no documented arc-resistant rating — including early-1980s lineups — treat arc propagation ahead of the main as credible and take duration from the upstream 480 V switchgear breaker: at 20 cycles instead of 6, incident energy multiplies by 3.33. Where construction leaves the path uncertain, calculate both cases and label the higher result.
On this page
- Which breaker sets the arc flash duration at an MCC?
- Was the existing study wrong to use the main breaker?
- Can an arc inside an older MCC get ahead of the main breaker?
- What clearing time do you use for each device?
- How do you redo the calculation with the upstream breaker?
- How much does the incident energy rise with the slower device?
- What number goes on the label when the two devices disagree?
- Questions asked
Use the MCC main breaker's clearing time only for a fault that stays on its load side. In an MCC with no manufacturer-documented arc-resistant rating — every early-1980s lineup qualifies — treat an arc that can reach the main compartment and establish a fault ahead of the main as credible, and take the duration from the upstream 480 V switchgear feeder breaker. Where construction leaves the propagation path uncertain, run both devices and keep the higher incident energy: going from 6 cycles to 20 cycles more than triples the number. The sections below settle the device, the clearing time and the label.
Which breaker sets the arc flash duration at an MCC? #
The duration comes from the first device upstream of the arcing fault that can actually interrupt it — the MCC main breaker for a fault on its load side, and the upstream 480 V switchgear feeder breaker once the arc establishes itself ahead of that main.
A breaker downstream of the arcing fault sees no current and contributes nothing, so the study reads duration off the time-current curve of whichever device sits between the fault and the source. Those two devices live in different enclosures, a distinction worth keeping straight (see Switchgear vs MCC: what each term actually means). Common study practice already leans toward the upstream answer: for panels, switchboards and MCCs, the clearing device is usually taken as the next device upstream in a separate enclosure, because an arc that involves the incoming compartment sits ahead of the equipment's own main.
Was the existing study wrong to use the main breaker? #
Not automatically — a study that used the MCC main is right for fault locations on the main's load side and understates the energy wherever the arc can propagate ahead of the main; that device choice, not the 2012-vintage table, is the thing to fix.
Table D.7.7 of NFPA 70E (2012 edition) is a simplified low-voltage-breaker method, and its results stand or fall on two inputs: a validated available fault current and a resolved breaker-rating definition, the subject of validated inputs for NFPA 70E 2012 Table D.7.7. Neither input rescues a wrong device: a table run on the MCC main cannot return the right number for a fault the main cannot interrupt. New work calculates to IEEE 1584-2018, which removed the old 125 kVA transformer cutoff and added electrode configuration to the model, feeding the arc-flash risk assessment that NFPA 70E (2024 edition) requires. Confirm the edition and local amendments adopted in your jurisdiction with the authority having jurisdiction and the equipment documentation.
Can an arc inside an older MCC get ahead of the main breaker? #
Yes — unless the MCC carries a manufacturer-documented arc-resistant rating, treat plasma travel from a vertical section into the main compartment as a credible path, and an early-1980s MCC has no such rating on paper.
Arc resistance is a type-tested rating the manufacturer documents, test conditions attached; equipment without that documentation does not have the rating, whatever its age. Age cuts the other way too: a 1980s birthdate does not by itself prove a plasma path exists — the physical question is what the barriers, compartment separation and venting between the vertical sections and the main compartment will do. On a long lineup some engineers credit that distance, arguing a fault in the far section cannot drive plasma back to the main; others refuse the credit. With nothing documented, take the branch that survives the argument: the upstream breaker sets the duration. Where an arc-resistant rating is documented, keep the clearing arrangement consistent with the conditions it was tested under before leaning on the main-breaker case.
What clearing time do you use for each device? #
Read the device's time-current curve at the calculated arcing current; for planning numbers, NFPA 70E documentation uses 6 cycles (0.100 s at 60 Hz) for a breaker clearing without intentional delay and 20 cycles (0.333 s) for low-voltage power and insulated-case breakers held on short-time delay for selective coordination.
The upstream number is bigger because coordination demands it: to stay selective, the upstream breaker waits through the downstream clearing window, and NFPA 70E's PPE-category development material cites 20 cycles as typical for exactly that situation. The same physics is why control panel incident energy is set by upstream clearing time. On the main, 6 cycles holds only if the calculated arcing current — the value the arc actually draws, below the bolted current — reaches the instantaneous band of that trip unit; a pickup set above it drops even a load-side fault into the short-time band, and the duration grows with it. Read the curve; do not assume the fast number.
How do you redo the calculation with the upstream breaker? #
Keep every input except duration the same — voltage, available fault current, arcing current, working distance, enclosure geometry — swap in the upstream feeder's operating time at that arcing current, then post the larger of the two results.
- De-energize the MCC, lock it out and test for absence of voltage before opening any door or compartment; everything from step 3 on is done dead.
- List the fault locations the existing study modeled — starter bucket, horizontal bus, main lug compartment — and fix where each sits relative to the main breaker.
- Inspect the construction between those locations and the main compartment: barriers, compartment separation, venting, and any documented arc-resistant rating. Write down what you find; the device choice hangs on it.
- Assign each credible location its clearing device: the MCC main for faults confined to its load side, the upstream 480 V switchgear feeder breaker for anything that can land ahead of it.
- Read the upstream feeder's time-current curve at the calculated arcing current. With no curve or settings record in hand, use 20 cycles (0.333 s at 60 Hz) as the typical value for a low-voltage power or insulated-case breaker coordinated on short-time delay — then obtain the settings record.
- Recompute the incident energy and the arc-flash boundary with that duration, keep both cases in the study file, and carry the higher result to the label.
How much does the incident energy rise with the slower device? #
It rises in direct proportion to the duration: at fixed arcing current and working distance, the standard calculation methods scale incident energy linearly with clearing time, so 0.333 s instead of 0.100 s multiplies the number by 3.33.
Worked example, hypothetical inputs, shown so the arithmetic stays visible. Equipment: a 480 V, three-phase, 60 Hz MCC. Existing study: 4.0 cal/cm² at an 18 in working distance, built on the MCC main clearing in 0.100 s. Upstream device: the 480 V switchgear feeder, a low-voltage power breaker coordinated on short-time delay, typical clearing 20 cycles = 20 ÷ 60 Hz = 0.333 s. Same fault, same arcing current, same distance — only the duration changes:
E = 4.0 cal/cm² × (0.333 s ÷ 0.100 s) = 4.0 × 3.33 = 13.3 cal/cm²
The decision that follows: arc-rated PPE and equipment to at least 13.3 cal/cm² at that working distance, selected the way NFPA 70E PPE levels versus incident energy lays out, and a label that reads 13.3, not 4.0. The scaled value is an estimate — verify it against the governing edition of NFPA 70E and the equipment documentation before it goes on the label. Voltage did not move this number; duration did, which is why voltage barely changes NFPA 70E incident energy.
What number goes on the label when the two devices disagree? #
The higher of the two incident energies and the larger of the two arc-flash boundaries, at the stated working distance — the label states the worst credible exposure at that equipment, and the study file records which breaker produced it.
Never average the two cases, and do not label per section with the lower number unless the inspection documented construction that genuinely separates sections. For a 480 V MCC with no documented arc rating fed from switchgear, one number governs — the upstream-breaker case, 13.3 cal/cm² in the example above — together with its boundary. Record which breaker produced the number and what the inspection showed, because the choice has to be re-traced whenever a breaker is replaced, a relay is re-coordinated or a settings change moves either curve. The label carries the worst credible exposure; the file carries the reasoning.
Questions asked
Does a longer MCC lineup make the main breaker the right clearing device?
Not by itself. Lineup length and compartment separation make propagation less likely, and some studies credit that for faults far from the main section, but the credit rests on construction you can point to: barriers, compartmentation, a documented arc-resistant rating. An early-1980s lineup without documentation gets none of that credit, so the upstream switchgear breaker sets the duration regardless of how many sections stand between the fault and the main.
Is the NFPA 70E 2012 Table D.7.7 result still usable?
The table method is only as good as its inputs: a validated available fault current and a resolved breaker-rating definition. If those inputs hold and the device chosen actually clears the modeled fault, the result stands as an estimate. New studies calculate to IEEE 1584-2018, which removed the old 125 kVA transformer cutoff and added electrode configuration, so a redo under the current standard will not match the 2012 table exactly.
If the MCC main has an instantaneous trip, can I keep the 6-cycle duration?
Only for a fault that stays on the main's load side, and only if the calculated arcing current — not the bolted current — drives that trip unit into its instantaneous band at that speed; read the time-current curve at the arcing current. If the arc can establish a fault ahead of the main, the main's settings are irrelevant: the upstream breaker clears, and 20 cycles is the typical planning number for one held on short-time delay.
Does the arc flash label have to name the clearing device?
No. The label carries the incident energy, the arc-flash boundary and the working distance for the worst credible case at that equipment. Which breaker produced the number belongs in the study file, along with the construction observations behind the propagation judgment, so the next engineer can retrace the choice when a breaker is replaced or re-coordinated.