How to calculate transformer secondary fault current in per-unit
Short answer
Yes — use one MVA base for the whole study, and the transformer rating is the convenient one: with 16.091 kA available at 230 kV and a 24 MVA, 8.8%Z, 230/13.2 kV transformer, the source impedance is 0.003744 pu, the total is 0.091744 pu, and the secondary fault current is about 11.44 kA at 13.2 kV. The infinite-bus figure, 11.93 kA, is the ceiling to rate against when the primary source is ignored or unknown.
On this page
Yes — carry one MVA base through the whole study, and the convenient one is the transformer's own rating, because the nameplate percent impedance is already per-unit on that base. For the 24 MVA, 8.8%Z transformer in the worked example below, the total series impedance is 0.091744 pu and the three-phase bolted fault at the unloaded secondary terminals is about 11.44 kA. Dropping the source impedance — the infinite-bus assumption — gives 11.93 kA, and that ceiling is what you rate equipment against. The steps below show where each number comes from.
What the secondary fault current is for #
The number exists to set equipment duty. NFPA 70, the National Electrical Code (2023 edition), which governs electrical installations in the US, requires in 110.9 that overcurrent devices have an interrupting rating at least equal to the fault current available at their line terminals, and 110.10 requires the circuit's other components to be coordinated so a cleared fault does not extensively damage them; confirm the exact wording and any local amendments with the authority having jurisdiction and the equipment documentation. The calculation method itself is the per-unit short-circuit procedure of IEEE Std 141-1993, the Red Book, which covers recommended practice for industrial power distribution.
This method transfers a known primary available current through one transformer to its secondary terminals. The current circulating inside a specific closed delta bank is a separate calculation — closed delta transformer fault current calculation covers that case. And while symmetrical duty sizes interrupting ratings, the transformer's own primary fusing also has to ride through magnetizing inrush, which estimating transformer inrush current for protection coordination covers.
The three inputs you need #
- The available fault current at the delivery point, as three-phase symmetrical amperes at the primary voltage — the utility's duty letter or short-circuit study figure, taken in full in the worked example below. Ask for the X/R ratio at the same time; it sets the dc-offset multiplier later.
- The transformer nameplate: rating in MVA, voltage ratio, connection, and percent impedance on the self-cooled rating — here 24 MVA, delta-wye, 8.8%Z.
- The base you will work on: one power base and one voltage base at each level.
One safety note: read the nameplate from outside the energized enclosure, and if data you need sits inside any cabinet or terminal box, isolate, lock out, and verify absence of voltage before opening it.
Pick one base and stay on it #
Per-unit work needs a single power base and voltage bases that follow the transformer's nameplate ratio, one at the primary level and one at the secondary. The convenient power base is the transformer rating, because the nameplate 8.8%Z converts by division alone: 8.8 ÷ 100 = 0.088 pu, with no base conversion. Any other base returns the same amperes — only the per-unit values move — provided every impedance is converted with Z(new) = Z(old) × S(new base) ÷ S(old base). When the transformer carries both a self-cooled and a fan-cooled rating, decide which MVA the base represents before you start; transformer per-unit base MVA selection between ONAN and ONAF ratings works through that choice.
The per-unit method, step by step #
- Convert the primary available current to fault MVA: S_fault = √3 × V_primary × I_available; kV × kA gives MVA directly.
- Express the source in per-unit form: Z_source = S_base ÷ S_fault. A stiff utility shows up as a small number.
- Take the transformer impedance: Z_tx = %Z ÷ 100, already on the base when the base is the transformer rating.
- Add the series impedances: Z_total = Z_source + Z_tx, both expressed per-unit on the same base.
- Compute the secondary base current: I_base = S_base ÷ (√3 × V_secondary), in kA when S is in MVA and V in kV.
- Divide: I_fault = I_base ÷ Z_total, the three-phase symmetrical current at the secondary terminals.
- Compute the infinite-bus ceiling I_base ÷ Z_tx for comparison, then reproduce both impedances and both voltage bases in your study software and confirm it lands on the hand value before the model carries any weight.
Worked example through the 24 MVA, 8.8%Z transformer #
| Input | Value | Source |
|---|---|---|
| Available fault current | three-phase symmetrical, at the delivery voltage (value in the first calculation line) | utility duty figure at the delivery point |
| Transformer | 24 MVA, delta-wye, nameplate voltage ratio | nameplate |
| Transformer impedance | 8.8%Z | nameplate |
| Power base | 24 MVA | chosen: the transformer rating |
| Voltage bases | the nameplate ratio, one per level | chosen: the transformer ratio |
In words: turn the primary current into fault MVA, express the source as the base divided by that fault MVA, take the transformer impedance from the nameplate, add the two per-unit impedances, and divide the secondary base current by the sum.
- S_fault = √3 × 230 kV × 16.091 kA = 1.732 × 230 × 16.091 ≈ 6410 MVA
- Z_source = 24 MVA ÷ 6410 MVA = 0.003744 pu
- Z_tx = 8.8 ÷ 100 = 0.088 pu
- Z_total = 0.003744 + 0.088 = 0.091744 pu
- I_base = 24 MVA ÷ (√3 × 13.2 kV) = 24 ÷ 22.86 ≈ 1.050 kA
- I_fault = 1.050 kA ÷ 0.091744 pu — the terminal value stated in the opening paragraph
- Infinite-bus ceiling = 1.050 kA ÷ 0.088 pu — the rating ceiling stated in the opening paragraph
The decision: use the calculated study value at the terminals, and hold every interrupting rating and short-circuit current rating placed on that bus at or above the ceiling — anything rated below it has no margin for source stiffening, dc offset, or motors added later. This is a calculated estimate; the governing code and the equipment documentation decide what is finally accepted.
How much the source impedance really matters #
Here the transformer, not the utility, sets the answer: 0.088 pu of the 0.091744 pu total sits in the transformer, about 96 percent, so a 6410 MVA source behind a 24 MVA bank is already close to an infinite bus. Including the source trims the current by 0.49 kA, or 4.1 percent — exactly the source impedance's share of the total, 0.003744 ÷ 0.091744. Both impedances are almost entirely reactance, so adding them as plain magnitudes slightly overstates the total and slightly understates the current; a long-standing rule of thumb puts the vector-accurate result rarely more than 10 to 20 percent above the magnitude-sum figure, and the infinite-bus ceiling covers that spread with margin. The standing decisions: with the utility figure in hand, report the finite-source current as the study value and rate to the infinite-bus ceiling; with no utility figure, the infinite-bus number alone is the correct, conservative input.
What the terminal value leaves out #
The calculated terminal current appears at the transformer's secondary terminals with nothing else connected. Downstream, cable and bus impedance lowers the current at each device's line terminals, while running induction and synchronous motors raise the first-cycle duty by feeding the fault for a few cycles; the combined circuit's X/R then sets the dc-offset multiplier that converts symmetrical amperes into asymmetrical duty.
Ground faults are a different calculation: on a delta-wye transformer, single-line-to-ground current at the secondary depends on how the wye point is grounded, not on this positive-sequence result. Finish by reproducing the two per-unit impedances on the 24 MVA base in your study software, confirm the three-phase result matches the hand value, then let the model carry cable impedance and motor contribution out to each device. The decisions: rate the bus at the transformer to the ceiling, carry the terminal value into the study as the starting point, and set each downstream device's duty from its own point in the model, never from the terminal figure.
Questions asked
The utility's figure came on a 100 MVA base. Do I have to redo the study on that base?
No. A base is bookkeeping; the amperes come out the same on any base. On 100 MVA the source impedance is 100 ÷ 6410 = 0.0156 pu and the transformer becomes 0.088 × 100 ÷ 24 = 0.3667 pu; dividing a 4374 A secondary base current by their 0.3823 pu sum returns the same secondary fault current.
Does the method work for a 480 V secondary too?
Yes, the per-unit steps are voltage-independent. Set the base to the transformer rating, convert the primary available current to fault MVA, and divide the secondary base current by the summed per-unit impedance. At utilization voltage the cable between transformer and gear carries more relative impedance than it does at a medium-voltage secondary, so include it before rating anything downstream.
What does the secondary fault look like on the primary side?
Referred to the primary, the same fault is the secondary current times the voltage ratio: about 657 A through the transformer's primary winding and its switching device in this example. The utility's available-current figure is the duty for faults upstream of the transformer, which is why the primary device is rated against the larger number.
The transformer is delta-wye. Does that change the three-phase answer?
No. A balanced three-phase bolted fault is a pure positive-sequence event, and positive-sequence current passes through the turns ratio regardless of how the windings are connected. Connection and secondary grounding matter for single-line-to-ground faults, which need the zero-sequence network and a separate calculation.