Explainer
Calculating source impedance from prospective short-circuit current
Short answer
For a bolted three-phase fault, divide the line-to-line voltage by √3 and by the quoted symmetrical RMS fault current: |Zsource| = VLL ÷ (√3 × Isc). At 380 V with 42 kA available, that is 0.00522 ohm per phase, or 27.6 MVA of short-circuit duty behind the bus. Split it into R and X only with the utility's X/R ratio, and confirm the quote is symmetrical RMS, not peak.
On this page
A fault level quoted in kiloamps is an impedance in disguise. For a bolted three-phase fault at the bus, the per-phase source impedance is the line-to-line voltage divided by √3 and by the quoted symmetrical RMS fault current: |Zsource| = VLL ÷ (√3 × Isc). At the bus voltage of the worked example below with 42 kA available, that works out to 0.00522 ohm per phase, about 27.6 MVA of short-circuit duty behind the bus. That one number is what an equivalent source in a fault study or a time-domain model needs. Three checks keep it honest: confirm the quote is a symmetrical RMS figure at the point of calculation, confirm which voltage in the supply designation is actually line-to-line, and get the utility's X/R ratio before splitting the ohms into R and X.
What the quoted fault level actually describes #
A prospective short-circuit current, printed as Icc on many supply specifications, is the current that would flow at the stated point if a bolted, zero-impedance fault struck all three phases there. The figure compresses everything behind that point — the utility network, transformers, conductors — into one number, so it is a property of the source and the path to the bus, not of the equipment you are about to connect.
Pin down two conventions before the number becomes ohms. The first is symmetrical RMS versus peak: the symmetrical RMS value sets conductor heating and most equipment ratings, while the first-cycle peak rides higher on a decaying DC offset whose size depends on the source X/R ratio. If a letter quotes a peak figure and you feed it into an RMS formula, the impedance comes out too small and every downstream fault current comes out too high — the gap between difference between symmetrical and asymmetrical RMS fault current is exactly this trap. The second is location and fault type: a three-phase bolted figure at the main bus says nothing about faults at a remote panel and nothing about line-to-ground faults.
The conversion formula and its assumptions #
A balanced three-phase bolted fault treats all three phases identically, so the circuit collapses to a single phase. The phase conductor sees the per-phase source impedance down to the source's internal neutral, and the driving voltage is the phase-to-neutral voltage, VLL ÷ √3. Fault current is that voltage over that impedance, so rearranged:
|Zsource| = VLL ÷ (√3 × Isc)
Every term is an RMS quantity and the result is ohms per phase. The equation carries four assumptions: the fault is bolted and three-phase, the quoted current is the initial symmetrical RMS value at that point, the fault path itself has zero impedance, and any impedance between the quote's reference point and your calculation point is negligible or added separately.
The companion figure many utilities quote is short-circuit duty, Ssc = √3 × VLL × Isc in volt-amperes. The conversion also runs in reverse: when the data you hold is a transformer's nameplate impedance rather than a quoted level, the same physics predicts the current, as in calculating transformer interrupting current from impedance.
Worked example: a 42 kA, 380 V, 60 Hz source at the main bus #
Inputs, as a motor-feeder supply specification states them:
- VLL = 380 V, line-to-line RMS, three-phase — the main-bus voltage that accompanies the fault quote
- Isc = 42 kA, prospective short-circuit current quoted at the main bus
- f = 60 Hz, needed only if the impedance is later split into R and L
- X/R ratio: not stated anywhere in the specification, so the split stays symbolic
The rule in words: each phase sees the phase-to-neutral voltage across the per-phase source impedance, so the impedance magnitude equals the phase-to-neutral voltage divided by the bolted three-phase fault current.
The arithmetic:
√3 × 42,000 A ≈ 72,746 A
|Zsource| = 380 V ÷ 72,746 A = 0.00522 ohm per phase
Ssc = √3 × VLL × 42,000 A ≈ 27.6 MVA
Carrying extra decimals for √3 changes nothing that matters here: 1.732 and 1.73205 both give 0.00522 ohm.
Result: the equivalent source behind the bus is 0.00522 ohm per phase, magnitude, delivering 42 kA symmetrical RMS or 27.6 MVA of duty at the stated line-to-line voltage.
Decision: enter 0.00522 ohm per phase as the source impedance magnitude and make the model prove it — a bolted three-phase fault at the bus must print 42 kA. If it prints anything else, the voltage basis or the RMS-versus-peak convention is wrong, because the ohms are only as good as those two inputs. Until the utility supplies an X/R ratio, run the source on the magnitude alone: a guessed split changes the DC offset and the first-cycle peak without changing the 42 kA you are matching.
Splitting the ohms into R and X #
A magnitude hides its split. Many resistance–reactance pairs add to the same |Z|, and the split is what sets how fast the fault's DC offset decays and how high the first asymmetrical peak reaches — quantities that decide breaker interrupting duty and arc-flash incident energy. The split does not change the symmetrical RMS bolted current: any pair with the right magnitude reproduces the same fault level.
The ratio comes from the source owner, not from a table. Ask the utility in writing for the positive-sequence ratio X1/R1 at your service point; a fault-study handoff normally lists the three-phase and single-line-to-ground currents together with the X1/R1 and X0/R0 ratios. With q = X/R in hand:
R = |Zsource| ÷ √(1 + q²)
X = q × R
L = X ÷ (2π × 60 Hz)
with L in henrys per phase at the 60 Hz bus of the worked example.
Decision: the magnitude alone is sufficient when the study's output is symmetrical three-phase current checked against equipment ratings. Get the real ratio before modeling asymmetrical peaks, protection that responds to the offset wave, or arc-flash energies.
Where the entered number usually goes wrong #
Wrong voltage basis. Designations such as 380/254 V can list two numbers that are not √3 partners: the first divided by √3 is 219, not 254. Plugging a line-to-neutral voltage into the line-to-line formula shrinks the impedance by √3 — 254 V ÷ 72,746 A = 0.00349 ohm — and the model then prints about 73 kA at a bus that really delivers 42 kA, a 73 percent overstatement. Confirm with the supply authority which figure is line-to-line before anything enters the model.
Counted twice or missing downstream. If an upstream transformer's impedance sits both inside the equivalent source and again as an explicit element, the study under-reports fault current. Downstream the picture inverts: behind a stiff source like this one, a few tens of metres of feeder cable add impedance comparable to the source itself, so the fault level at the load end falls well below the bus figure. Conductor size, length and conduit material all move the bolted value, as covered in conduit material and bolted faults in fault current calcs.
Motors behind the bus add current without changing the source impedance. Short-circuit hand methods commonly add about four times the connected motor full-load current, with values of 4 to 6 accepted, to the fault contribution on motor-heavy switchboards — so a source-only model under-reports the current there. And when a study prints zero at a bus instead of a large number, the source record is the first suspect: see why a fault study shows zero current on a 480 V bus.
The decisions, case by case #
- Quoted symmetrical RMS, three-phase, at your bus: compute |Zsource| = VLL ÷ (√3 × Isc) and enter the magnitude. No split, no guessed ratio.
- Quoted in MVA: convert with |Z| = VLL² ÷ Ssc and you land on the same ohms.
- Basis unknown or the figure reads as a peak: stop and get the utility to state the symmetrical RMS value at the stated point, because entering a peak as RMS understates the impedance and overstates every current downstream.
- Splitting R and X, asymmetrical peaks or arc flash: request X1/R1, and X0/R0 with the line-to-ground current, in writing before the study starts.
- Motor-heavy switchboard: add the motor contribution, about 4 × the connected motor full-load current, on top of the source figure.
When this number feeds a short-circuit rating check, work only from the utility's written figures rather than the rating you would prefer, and before any test that opens the switchboard, de-energize, lock out and verify absence of voltage first.
Questions asked
The utility quoted fault duty in MVA instead of amps — how do I get ohms?
Use |Z| = VLL² ÷ Ssc. For a 25 MVA duty at the example's voltage: VLL squared is 144,400, and 144,400 ÷ 25,000,000 = 0.00578 ohm per phase. The current behind that duty is 25,000,000 ÷ (1.732 × VLL) = about 38 kA symmetrical RMS. Duty in MVA and current in amps are the same source data in different units, so either input lands on the same impedance.
How do I enter the result as a per-unit impedance?
Pick a power base, then divide. On a 1 MVA base, the base impedance is VLL² ÷ 1,000,000 VA = 0.1444 ohm, and the worked example's 0.00522 ohm becomes 0.00522 ÷ 0.1444 = 0.036 per unit. Any base works as long as the whole study uses the same one; a per-unit figure without its stated base means nothing.
Does the three-phase figure tell me anything about ground-fault current?
No. The impedance from a three-phase bolted fault is the positive-sequence value only. Ground-fault magnitude runs through the zero-sequence network — the transformer connection, the neutral grounding, any grounding resistor — so ask the utility for the single-line-to-ground fault current and the X0/R0 ratio at your service point. If only the three-phase ratio is available, treating both ratios as equal is a common conservative stopgap, but the grounding arrangement usually moves the answer more.
Where does the 4000 A bus rating fit into the calculation?
Nowhere. A 4000 A nominal rating says how much continuous current the busway or switchboard is built to carry; it is not a source limit and not a fault current. The fault current is fixed by the source impedance, and the bus rating only has to exceed the running load current while its short-circuit rating covers the available duty.