Selection guide
How to read an arc-resistant rating on a low voltage MCC
Short answer
Type-tested arc-resistant low-voltage MCCs exist in the US market, rated to IEEE C37.20.7 with accessibility types such as Type 2; no MCC product standard requires the test, so every rating is bounded by the tested arc current, duration and configuration. Containment never lowers calculated incident energy — cut clearing time, add distance, and dress to the label.
On this page
An arc-resistant claim on a low-voltage MCC can be a real type-test result: manufacturers run low-voltage lineups through the internal-arc test of IEEE C37.20.7 and publish an accessibility type and an arc current from it. What no North American MCC product standard does is require that test, so the rating exists only where the maker tested it — at the tested current, for the tested duration, in the tested configuration. Reading those conditions against your own lineup and your own clearing time is the whole job when the datasheet lands on the bench. And containment never enters the incident-energy number that sets PPE: clearing time and distance do, and both are yours to cut.
What IEEE C37.20.7 covers and what the rating means #
IEEE C37.20.7, cited in current low-voltage MCC literature as the 2007 edition, is a guide for testing metal-enclosed switchgear rated up to 38 kV (a voltage scope, not an arc current) for internal arcing faults. It defines how to strike and sustain an arc inside an assembly and how to classify the result by accessibility: Type 1 means the boundaries held where a person stands in front; Type 2 means they held at the front, the sides and the rear. Suffix letters narrow the claim further — which compartments were verified and how access is restricted — so read them from the test report rather than the datasheet blurb. Indicator panels mounted outside the accessible boundary record whether hot gas, fragments or pressure crossed it.
A published rating reads like this: technical data for one arc-resistant low-voltage MCC line lists 65 kA with Type 2 accessibility, tested per IEEE C37.20.7-2007. Decoded, that says an internal arc at up to 65 kA, for the published duration, in the tested arrangement, stayed inside the boundary a person may stand at, front, sides and rear. It does not say your modified lineup contains anything, and it does not promise containment past the tested duration: if your upstream device clears an MCC bus fault slower than the tested duration, the test is silent on everything after that point.
In IEC practice, IEC TR 61641 provides the internal-arc test procedure for low-voltage assemblies; it is a technical report, applied by declaration the same way the IEEE guide is. Until a lineup has been evaluated to one of these documents, the specifying guidance is blunt: assume nothing about its performance during an internal arcing fault.
Reading the wording on the datasheet #
Sort every claim into one of two families before bids get compared. Arc-resistant is a tested containment claim; arc-mitigating is a design claim that lowers the chance an arc starts or the time and distance you spend near one. Only the first can be checked against a recognized test document; the second you verify as a list of features.
| Wording on the datasheet | What it can mean | What to demand |
|---|---|---|
| Arc resistant, 65 kA, Type 2 front, sides, rear, IEEE C37.20.7-2007 | Type test to a recognized guide; performance bounded by the tested current, duration and configuration | The test report summary: arc current, duration, accessibility type and suffixes, indicator results, and whether your structure types, cut-outs and entry directions were covered |
| Arc resistant, with no standard named | The maker's own testing under its own conditions | The conditions in writing before you specify around it; treat it as unverified until they arrive |
| Arc-flash mitigating design | Features that cut initiation probability or exposure: remote racking, insulated bus, finger-safe terminals | The feature list for each structure and bucket size, and whether it covers the whole lineup or selected structures |
| Arc-flash rated or arc-flash proof | Not a defined rating in any guide | What, if anything, was tested; with nothing behind it, read the words as marketing |
The mitigating row is where most modern MCC marketing lives, and it is honest engineering when the features are real — it just answers a different question than containment does.
What containment changes and what it does not #
An internal arc threatens two ways at once: pressure, gas and fragments driven toward wherever a person stands, and radiant heat delivered as incident energy in cal/cm² at the working distance. Containment addresses the first and leaves the second untouched. Incident energy is calculated from arcing current, arc duration, working distance and electrode and enclosure geometry under the models of IEEE 1584-2018; containment appears nowhere in that input set. NFPA 70E, 2024 edition, requires an incident-energy risk assessment before energized work and protective clothing with an arc rating at least equal to the calculated incident energy — confirm the edition your authority having jurisdiction enforces, along with the equipment documentation for the installation. For the everyday switching task at a 480 V lineup, what PPE operators need to switch 480 V MCC disconnects covers the clothing question in detail.
Keep containment separate from fault ratings too. A 65 kA containment result is not a short-circuit current rating and not a bus bracing figure; the MCC short-circuit rating versus bucket breaker ratings question has its own arithmetic.
Each mitigation feature attacks one term of the energy or one initiation path. Insulated bus and finger-safe terminals lower the odds that a dropped tool or a loose strand starts a phase-to-phase fault — probability, not consequence. Remote racking and remote operation move the person back during the task with the highest exposure, and incident energy falls with distance faster than with anything else you control. Duration belongs to the upstream device: maintenance-mode settings, light-and-current arc-flash relaying, and current-limiting fuses where coordination allows — read when a Class L fuse actually cuts arc flash energy before trading selectivity for speed.
Cutting clearing time on a 480 V, 25 kA MCC bus #
This worked example shows how large the duration term is. The inputs are illustrative study values for a 480 V, three-phase MCC bus — declared example figures, not site data: available bolted fault current 25 kA rms; arcing current from the study 20 kA rms; working distance 455 mm; calculated incident energy 12 cal/cm²; upstream feeder breaker clearing time 0.50 s, read from its time-current curve. A maintenance switch on that breaker drops its clearing time to 0.10 s.
The rule, in words: with arcing current and working distance unchanged, incident energy scales with arc duration, E2 = E1 × t2 / t1.
The arithmetic: 12 cal/cm² × 0.10 s ÷ 0.50 s = 2.4 cal/cm².
The decision: at 12 cal/cm² the racking task needs clothing rated at least 12 cal/cm², so an 8 cal/cm² ensemble fails the NFPA 70E arc-rating rule; at 2.4 cal/cm² a 4 cal/cm² arc-rated coverall satisfies it. That holds only while the maintenance setting actually delivers its trip time, so read why an upstream instantaneous setting may not cut arc flash before trusting the new number. Treat the scaled result as an estimate: the incident-energy study per IEEE 1584-2018 produces the value that belongs on the label.
Writing the specification #
- Pull the study for the MCC bus: available fault current, the device that clears a bus fault, its clearing time from the time-current curve, and the incident energy at each working position.
- List the energized tasks actually performed — racking, switching, door-open troubleshooting, thermographic scans, bucket changes — and rank them by the incident energy at each position.
- Write mitigation into the request for quotation as line items: remote-racking provisions, insulated and barriered bus, finger-safe terminals, named for each structure and bucket size, with the covered extent stated.
- Make any containment claim a documentation deliverable: guide and edition, accessibility type and suffixes, arc current, tested duration, tested configurations, indicator results. Reject wording without numbers.
- Evaluate duration upstream: maintenance-mode settings, light-and-current arc-flash relaying, and current-limiting fuses where the coordination study allows; recheck selectivity after every change.
- Move operation off the face of the lineup: remote start and stop stations, door-closed status indication, remote racking fixtures.
Verifying the delivered lineup #
Walk the lineup against the submittal, structure by structure: insulated bus present and barriered, finger-safe blocks actually installed, racking provisions on every bucket quoted with them. Field changes are the quiet eraser — a new cable cut-out, an uninsulated replacement bar, a swapped terminal block take that structure outside the tested configuration. Compare field trip settings with the study's settings, rerun the incident-energy calculation with as-built data, and update the equipment labels to match. Function-test any maintenance setting or arc-flash relay and record the clearing time it delivers, then check that time against the tested duration behind any containment claim.
One safety rule for all of it: de-energize and verify absence of voltage before opening a structure or racking with doors open wherever the task allows, and where energized work is unavoidable, NFPA 70E, 2024 edition, sets the assessment, the boundaries and the PPE — confirm the details with your authority having jurisdiction and the manufacturer's documentation.
The decision for each case #
Buying a new lineup where operators stand at the face: buy Type 2 containment whose tested arc current meets or exceeds the fault current your study shows at the bus, whose tested duration meets or exceeds your clearing time, take the mitigation features for every structure, and do the upstream duration work. The three measures do different jobs; none substitutes for the others.
Evaluating a datasheet whose claim carries no standard: treat it as an internal test until the conditions arrive in writing, and in the meantime run the study, dress to the label, and spend on mitigation and clearing time — those reduce real exposure regardless of the wording.
Stuck with an aging lineup and no replacement budget: cut duration with settings and relaying, cut distance with remote racking and remote indication, and re-label. Duration and distance are the two terms you own; containment is a property of hardware you do not yet have.
Whatever the lineup says on its nameplate, the calculated incident energy at the working distance still rules PPE — that is the number that goes on the label and into the task plan.
Questions asked
Does an arc-resistant rating lower the PPE I have to wear at the lineup?
No. The rating says an internal arc at the tested current and duration stayed inside the accessibility boundary; it does not enter the incident-energy calculation. NFPA 70E, 2024 edition, still requires clothing whose arc rating is at least equal to the calculated incident energy at the working distance. Cut the incident energy with clearing time and distance, then dress to the label.
What should I demand in writing before accepting an arc-resistant claim?
The test guide and edition, the accessibility type and its suffixes, the arc current and duration tested, and the configurations covered: which structures, which bucket sizes, cable entry directions and any floor openings. A claim without those figures is the maker's own test under its own conditions, so treat it as unverified until the report summary arrives.
Is remote racking still worth specifying when the MCC is already arc resistant?
Yes, because the two measures protect differently. Containment limits what an arc does at the boundary once it starts; remote racking removes you from the highest-exposure task entirely, and incident energy falls as distance grows. Set the study's working distance to the distance the task really has, and the remote fixture pays off on the label.
Does the tested arc duration have to match my breaker's clearing time?
Containment is demonstrated only up to the tested duration. If your upstream device clears an MCC bus fault slower than that, the rating says nothing about the arc after it. Compare the published duration with the clearing time in your incident-energy study and close any shortfall with faster protection, then re-label.