IEC contactor sizing: motor kW and duty class decide

Motors and motor starters Published 8 min read By Current Intel engineering team

Short answer

Size an IEC contactor from motor kW at your supply voltage and the utilization category: AC-3 for start, run and stop, AC-4 for jogging or plugging. Then check the manufacturer's electrical-life chart at your starts per hour. Comparing full-load current with the frame's maximum-ampere figure tests only heat carrying, not switching duty, and is the wrong basis for a motor load.

On this page
  1. Why the ampere comparison misleads on a motor load
  2. What IEC 60947-4-1 utilization categories ask of the contacts
  3. Where each of your three currents belongs
  4. Selecting the frame, step by step
  5. Sizing the contactor for a 37 kW motor at 400 V on jogging duty
  6. IEC frames and NEMA sizes
  7. Before you inspect the contacts
  8. Selection mistakes that shorten contact life
  9. Questions asked

Select an IEC contactor by motor kW at your supply voltage, together with the utilization category the contacts will work: AC-3 for ordinary start, run and stop, AC-4 for jogging, plugging or reversing under speed. Then verify electrical life on the manufacturer's duty chart at your starts per hour. Comparing full-load current with the frame's maximum-ampere figure looks like the obvious check, but that figure is a thermal, continuous-carry number and says nothing about making and breaking inductive motor current. Locked-rotor current is already built into the kW rating, and no-load current plays no part in the choice at all. Below are the roles of each current you measured, the category definitions, the selection procedure and a worked jogging example.

Why the ampere comparison misleads on a motor load #

The maximum-ampere figure on an IEC contactor is a heat number: what the contacts can carry continuously without overheating. For a resistive load that is nearly the whole story. A motor load works the contacts in two extra ways. On the make, the tips close onto locked-rotor current, several times the running current. On the break, an AC-3 contactor interrupts only the running current, because the start current flows while the tips are already closed, while AC-4 duty interrupts near locked-rotor current at every operation. Arc energy at those makes and breaks, not running heat, is what erodes the contacts. A frame can therefore carry full-load current indefinitely and still reach end of contact life in weeks at a high start rate. The ampere comparison passes on paper while the switching duty destroys the contacts, and that is the deception to design around.

What IEC 60947-4-1 utilization categories ask of the contacts #

IEC 60947-4-1, the product standard for low-voltage contactors and motor starters, sorts switching duties into utilization categories, and every IEC frame carries a rating per category at a stated voltage.

  • AC-1: non-inductive or lightly inductive loads such as resistive heating. The ampere rating is the selection figure here; the article on what a contactor's AC-1 rating means for a single-phase load takes that case on its own.
  • AC-2: slip-ring motor starting.
  • AC-3: squirrel-cage motors, started and switched off during running. The contacts carry the start current but interrupt only the running current.
  • AC-4: squirrel-cage motors, started, plugged or jogged. Every operation makes and breaks close to locked-rotor current, so wear per operation is far higher.

Some manufacturers publish an extended AC-3 variant for frequent-start duty. Read it as that maker's own rating with its own conditions; it does not replace AC-4 when jogging is involved. Reversing under speed is the classic AC-4 case, and the guide to resolving AC-3 versus AC-4 selection for reversing motors works through that choice. The same standard also rates motor-protection circuit breakers against these categories, so a breaker with a motor characteristic follows the same AC-3 and AC-4 logic. For the full category list with its test conditions, the reference page on IEC utilization categories AC-1 through AC-4 sets out each one. A frame's ratings are the manufacturer's declaration against the standard, so the rating table for the named frame and revision governs.

Where each of your three currents belongs #

Quantity Role in contactor selection Where it comes from
Motor kW (or HP) The primary selection input: find the frame whose kW rating at your supply voltage and category meets or exceeds it Motor nameplate
Full-load current Not the frame choice. It sets the overload relay and sizes conductors and branch protection Nameplate, or the datasheet's rated current
Locked-rotor current Already inside the kW rating. Use it only for coordination and protection checks, never to size the frame again Motor datasheet or locked-rotor code
No-load current No role at any step of contactor selection Motor datasheet
Starts per hour and starting conditions Set the utilization category and the wear rate the life chart must absorb Process requirement
Required electrical life Picks the frame on the life curve for the chosen category Maintenance plan

Full-load current does own one job: the overload relay. The article on setting overload relays from nameplate full-load current shows that procedure.

Selecting the frame, step by step #

  1. Read the motor kW (or HP) and the supply voltage from the nameplate.
  2. Classify the duty: start, run and stop only is AC-3; jogging, plugging or reversing under speed is AC-4.
  3. Shortlist the frames whose kW rating at your voltage and category meets or exceeds the motor.
  4. Open the electrical-life chart for the candidate frame and category, enter it at the current the contacts must break, and read the operations to end of life.
  5. Multiply starts per hour by operating hours over your planned inspection interval. If the chart stops short of that count, take the next frame up and read again.
  6. Size the overload relay from full-load current, and pick the coil voltage and auxiliary contacts to match the control circuit.
  7. Confirm short-circuit coordination for the contactor, overload and branch protection combination in the manufacturer's coordination tables before releasing the design.

Sizing the contactor for a 37 kW motor at 400 V on jogging duty #

The inputs are illustrative; substitute your own nameplate and duty.

  • Motor: 37 kW three-phase squirrel-cage induction motor, nameplate 400 V, 50 Hz.
  • Duty: jogging with plugging, 30 operations per hour, 8-hour shifts, 250 working days a year, contacts inspected every 12 months.
  • Estimate inputs: power factor 0.85 and efficiency 0.92 for the current estimate; locked-rotor current taken as 6.5 times full-load current, a typical squirrel-cage figure. Read both from your motor's datasheet, or take the rated current straight off the nameplate and drop the first estimate.

The rule: jogging places the duty in AC-4, so the frame must come from its AC-4 rating at the supply voltage and must survive every operation between inspections.

The arithmetic, using the standard three-phase power relation I = P divided by (the square root of 3 times U times power factor times efficiency):

  • Full-load current: I = 37,000 W ÷ (1.732 × 400 V × 0.85 × 0.92) = 37,000 W ÷ 541.8 V ≈ 68 A.
  • Locked-rotor current: 6.5 × 68.3 A ≈ 444 A. That is the level the contacts interrupt on every jog; an AC-3 duty would break only the running current.
  • Operations between inspections: 30 per hour × 8 hours × 250 days = 60,000 operations.

The decision: select from the AC-4 column at 400 V for a 37 kW motor, then confirm the frame's AC-4 life curve shows at least 60,000 operations at the jogging current; if it stops short, take the next frame up and read again. A frame whose maximum-ampere figure sits above the 68 A running estimate passes the ampere comparison and can still fail this one, which is why the ampere figure never enters the decision. The result is an estimate resting on the assumed power factor, efficiency and locked-rotor multiple; check it against the governing code, the nameplate rated current and the manufacturer's rating tables.

IEC frames and NEMA sizes #

A NEMA-rated starter is sized by horsepower tables that assume severe duty, commonly compared to AC-4 in the IEC charts. That is its appeal: no duty-chart work, at the cost of a larger, less finely graded frame. The IEC route yields a smaller frame where the duty is genuinely AC-3 and life has been verified on the chart, but it demands the classification and the life check. Two practical rules follow. Where jogging or plugging is frequent or undefined, the NEMA size is the safe default. And whatever the frame, the motor has its own start-rate limit, set by NEMA MG-1 start clauses; the article on what NEMA MG-1 start clauses mean for motor start inhibits explains that motor side. Contact wear and motor thermal limits are separate budgets, and a selection that respects one can exceed the other.

Before you inspect the contacts #

De-energize the starter, lock it out and verify absence of voltage at the load terminals before any inspection that opens the panel. NFPA 70E, 2024 edition, covers this as part of establishing an electrically safe work condition; editions and local amendments differ, so confirm the requirements with your authority having jurisdiction and the equipment documentation. With the panel safe to open, the failure signatures tell you how the frame is actually being worked:

  • Welded or heavily pitted tips: the duty exceeds the rating the frame was chosen for, usually AC-4 severity on an AC-3 selection.
  • One terminal discolored or hot at running current while its neighbors stay cool: a loose lug or a marginal frame. Re-torque to the manufacturer's value and re-check.
  • Chatter, buzz or drop-out during the start with clean contact faces: a control-side problem, not the frame. The article on fixing AC contactor chatter on a loaded motor start walks that diagnosis.

Selection mistakes that shorten contact life #

  • Sizing full-load current against the maximum-ampere figure: it tests heat carrying only and reads as a pass while the switching duty erodes the contacts.
  • Entering no-load current anywhere in the selection: it has no bearing on the result.
  • Applying locked-rotor current a second time to upsize the frame: the kW rating already contains it, so the extra size buys nothing the duty chart would not show.
  • Choosing an AC-3 frame for jogging or plugging: that duty breaks near locked-rotor current, which is what the AC-4 rating exists for; the article on what plugging duty does to reversing contactor sizing covers that starter case.
  • Skipping the starts-per-hour entry: a frame correct at a few starts an hour can reach end of life in weeks at a high rate.
  • Reading the kW row at the wrong supply voltage: kW ratings are tabulated per voltage, and the same frame carries different kW values at different voltages.
  • Releasing the design without the coordination check for the contactor, overload and branch protection combination.

Questions asked

Does Type 1 or Type 2 coordination change which contactor I buy?

Under IEC 60947-4-1, Type 1 coordination requires only that a short circuit creates no danger; the contactor may need repair or replacement afterward. Type 2 requires the contactor to be serviceable again after the fault clears, even if the tips weld and can be separated without damage. Choose the coordination level the process tolerates and confirm the combination in the manufacturer's coordination tables.

What is the difference between mechanical and electrical life?

Mechanical life counts no-load operations and often runs to millions. Electrical life counts operations under load and is much lower, because arc energy erodes the contacts at every make and break. Select on electrical life from the maker's chart for your category and broken current; a mechanical figure says nothing about a contactor that switches a motor.

My duty falls outside the manufacturer's selection chart. What now?

Stop sizing from estimates. Send the motor kW, supply voltage, starts per hour, starting conditions and required life to the contactor manufacturer or its distributor and ask for a frame confirmation in writing. A duty you cannot place on the published chart, such as unusual starting conditions or very high operating rates, leaves contact life unknown until the maker confirms a frame.

Can an AC-3 frame ever cover light jogging duty?

Only where that maker's tables say so explicitly. Some manufacturers let a larger AC-3 frame cover a stated number of jogging operations per hour, defined in their own rating tables. Read the jogging rows for the frame you have in mind; if the table is silent about jogging, treat the duty as AC-4 and select from its ratings.

Keep reading

  • Selection guide

    What plugging duty does to reversing contactor sizing

    Plugging (reverse-current braking) is AC-4 duty: the reversing contactors make roughly locked-rotor current while the motor still spins forward, so you must select them from the manufacturer's AC-4 plugging ratings, not the horsepower label. Work through a 25 hp, 460 V mixer example, then set the manual motor starter overload from the motor nameplate current.

    Motors and motor starters

  • Selection guide

    Selecting a modern IEC contactor for a burned lathe starter

    Size the replacement from the motor nameplate, not the old catalog number: a 5 HP, 230 V three-phase lathe motor at 15.2 A FLA takes a 25 A AC-3 frame — ordered as 3RT1025-1AC20 for a 24 VAC coil or 3RT1025-1AP20 for 24 VDC — plus a snap-on NC auxiliary block to rebuild the original 1 NO + 1 NC set, and a new 14–20 A overload relay set to FLA because the old one will not mount.

    Motors and motor starters

  • Troubleshooting

    Why a 3.3 kV contactor flashes when closing onto a motor

    A brief arc when a medium voltage contactor closes onto a motor is normal contact making. A blast at closing, after the circuit ran fine unloaded, means fault current in the feeder cable or windings that only appears under load: keep the starter locked out, isolate the complete motor circuit, inspect it, insulation-test cable and winding separately, and repair the defective part before return to service.

    Motors and motor starters