Short answer
A 600 V cable's insulation resistance acceptance limit comes from the governing ICEA document, ANSI/NEMA WC 70/ICEA S-95-658, with its stated test voltage and duration, not from the cable rating or the tester setting. Choose the tester voltage from the approved procedure, read at the stated elapsed time, and record voltage, time, temperature, length and isolation boundary.

On this page
- What is the minimum insulation resistance for a 600 V cable?
- Which ICEA standard governs low-voltage power cable insulation resistance?
- Why doesn't the voltage-class rating on the cable set the megohm limit?
- Should you test the cable at 500 V or 1000 V?
- How does cable length change the measured insulation resistance?
- How do temperature and test time move the reading?
- What does an accepted cable test record carry?
- Questions asked
A 600 V power cable does not get its insulation resistance pass/fail value from the cable rating or from the tester dial. The acceptance limit comes from the governing cable standard — for the thermoplastic and thermoset constructions common on 480 V services, ANSI/NEMA WC 70/ICEA S-95-658 — along with the test voltage, the reading time and the correction rules that document states. This article explains where the number comes from, why choosing 500 V or 1000 V is a procedure question rather than a resistance question, and what a test record must carry before anyone else can accept the result. Every figure in the worked example below is illustrative arithmetic, not a published limit.
What is the minimum insulation resistance for a 600 V cable? #
There is no single megohm number you can derive from that voltage-class rating and a 500 V or 1000 V tester setting; the acceptance limit comes from the governing cable standard, ANSI/NEMA WC 70/ICEA S-95-658, and from the test conditions it states.
Insulation resistance is the resistance calculated from the DC voltage an insulation tester applies and the current that flows through and across the insulation. It is reported in megohms. The measurement evaluates leakage. It does not by itself prove dielectric withstand, and it does not locate a defect — which matters when a reading looks acceptable yet the cable still causes trouble later; that failure mode is a separate investigation.
The decision before the first reading: name the document and edition that sets the criterion. A test plan that says only "megger per ICEA" has no acceptance basis yet.
Which ICEA standard governs low-voltage power cable insulation resistance? #
For cables rated 2000 V and less, the governing document is ANSI/NEMA WC 70/ICEA S-95-658, Power Cables Rated 2000 Volts or Less for the Distribution of Electrical Energy; the current edition is 2021, and the edition your specification names is the one that governs.
The standard covers thermoplastic and thermoset insulated wires and cables rated 2000 V and less, which includes RHW-2 and similar constructions routed through tray, conduit, open trenches and duct banks on a typical plant distribution. It states its own insulation resistance requirements, test methods and conditions, so cite the edition explicitly. Older editions still circulate in legacy specifications, so confirm which one your contract references rather than reading a criterion from whichever copy is at hand.
Manufacturer documentation supplements this. A cable maker's installation guide reproduces values taken from ICEA S-95-658/NEMA WC 70 and states cable-specific limits, but it does not replace the contractual standard as the acceptance authority.
Where the test is taken from matters as much as the limit, because it decides which leakage paths the instrument sees; the comparison of insulation resistance testing from switchgear versus motor terminals covers that split.
Why doesn't the voltage-class rating on the cable set the megohm limit? #
The voltage-class marking identifies the cable's service rating, not an insulation resistance value; it neither sets a megohm limit nor instructs you which tester voltage to select, and the same is true of a tray-rating marking.
The voltage rating tells you the continuous operating stress the insulation system is built for. Insulation resistance acceptance is a separate requirement with its own basis: it depends on the insulation material, the conductor and shield geometry, the temperature, the moisture condition and the length under test. Two cables with the same voltage-class marking can carry different insulation systems and therefore different expected readings, which is why a number attached to the voltage class cannot serve as a universal limit.
Arithmetic that derives a limit from the rating — for example scaling a value between the rated class and the 480 V service — produces nothing defensible. The rating and the acceptance criterion come from different documents and answer different questions.
Should you test the cable at 500 V or 1000 V? #
The 500 V and 1000 V figures are tester output voltages, not resistance limits, and neither becomes correct just because of the cable's service rating; the governing procedure and the limits of every component left connected decide it.
Three facts drive the choice:
- The approved method names the voltage. A criterion defined at one test voltage is not interchangeable with a reading taken at another, because contaminated or deteriorated insulation can leak differently as the applied stress rises.
- Every component inside the test boundary must tolerate the selected voltage. Surge-protective devices, electronic equipment and connected loads can be damaged by a higher test voltage or can clamp the reading, so disconnect or isolate anything outside the defined boundary.
- Do not rescale the limit when the voltage changes. Doubling or halving a megohm value between 500 V and 1000 V has no basis in any governing method; use the higher setting only where the approved procedure and the connected equipment allow it.
Tracing what stays connected is its own task; the walkthrough of what an ohmmeter test finds on a three-phase cable shows how the conductor-to-conductor and conductor-to-ground paths divide a reading.
De-energize the section, verify absence of voltage with a proven instrument and apply the site's isolation procedure before connecting the tester, because the tester then puts hazardous DC on conductors that were dead a minute earlier.
How does cable length change the measured insulation resistance? #
Extra length lowers the reading, because every additional foot adds another parallel leakage path; a construction that would read 2000 MΩ over 250 ft reads about 500 MΩ over 1000 ft of the same cable, and the governing method decides whether readings are normalized.
Worked example (illustrative arithmetic, not a published limit). One conductor-to-ground path on a 250 ft length is measured at the specified elapsed time and reads 2000 MΩ. Resistance is proportional to length, so the same construction over 1000 ft reads:
R per 1000 ft = 2000 MΩ × (250 ft ÷ 1000 ft) = 500 MΩ
Now test two such 250 ft sections together with both far ends joined. Their leakage paths sit in parallel, so the conductances add and the displayed reading halves to 1000 MΩ. Nothing deteriorated; the boundary just grew. The same arithmetic explains why a long duct-bank run can read lower than a short conduit pull of the identical cable without either being worse. Some acceptance methods build length into the criterion; others specify a test-object limit. Apply a length conversion only where the governing method calls for one.
How do temperature and test time move the reading? #
The displayed resistance climbs during a test because charging and dielectric absorption currents decay, so an early reading can look worse than one taken at the prescribed elapsed time; temperature moves the number too, and only the correction the governing method specifies may be applied.
The current an insulation tester measures is the sum of three parts: the capacitive charging current, which falls quickly; the absorption current, which falls over minutes; and the true leakage current, which is the quantity the criterion addresses. Read at the elapsed time the procedure states, not whichever display value looks most favorable, and record the time with the reading.
Insulation resistance falls as temperature rises, and air temperature is not cable temperature where a route passes from a warm room into a trench. Record the cable temperature by the method the procedure requires and apply only the correction that procedure and insulation type specify; a generic factor applied to the wrong material produces a result no one can defend later.
What does an accepted cable test record carry? #
An accepted record carries the governing document and edition, the test voltage, the elapsed reading time, the cable temperature and length, the isolation boundary, and the conductor-to-conductor or conductor-to-ground path behind each reading; without those, a megohm figure cannot be checked by anyone else.
A site specification that only says the cables are ICEA compliant has not named an acceptance requirement, and that gap is the real reason teams end up asking whether they must buy the standard. Either obtain authorized access to the named edition or have the responsible engineering authority identify and document the criterion for your site. The discipline is the one behind the argument that voltmeter training claims need a governing document rather than general practice: a number quoted without its source cannot be verified, enforced or repeated.
Close out these items before the crew begins:
- Cable markings reconciled with schedules, so each section's insulation construction and length are known.
- A traceable document reference and an approved criterion, in place of an unsupported megohm threshold.
- An isolation plan that states what is disconnected, how both ends are controlled and who verifies absence of voltage.
The decision for each case: if the governing document names a test voltage, a reading time and a limit, test to those and accept on them; if it does not yet exist for your job, that document work comes first, and a reading taken before it exists cannot be accepted against anything.
Questions asked
Do we have to purchase the ICEA standard before we can megger our cables?
You need the criterion the standard contains, not necessarily the document on your desk. Obtain authorized access to the edition your specification names, or have the responsible engineering authority identify and document the test voltage, duration and acceptance value for your site. Until that reference exists, no reading can be judged against anything.
Is a good insulation resistance reading proof the cable will pass a withstand test?
No. Insulation resistance measures leakage under a DC test voltage; it does not establish dielectric withstand capability and it does not locate a defect. A high reading supports acceptance under the insulation resistance criterion only, and other tests cover the remaining failure modes.
Can I compare a 500 V reading with a 1000 V reading on the same cable?
Not directly. Leakage in contaminated or deteriorated insulation can depend on the applied voltage, so readings taken at different tester voltages are not interchangeable, and an apparent pass at one setting cannot substitute for the test the governing method specifies. Take the reading at the voltage the approved procedure states.
What does the cable manufacturer's documentation add to the acceptance decision?
It clarifies cable-specific limits, such as the maximum test voltage the construction tolerates and conditions on connected accessories, and it reproduces values taken from the ICEA document. Manufacturer guidance does not automatically replace a contractual standard as the acceptance authority, so keep the governing edition as the final reference.