NEC available fault current labeling requirements

Electrical safety and codes Published 8 min read By Current Intel engineering team

Short answer

NFPA 70 sections 110.24, 110.16(B), 430.99 and 670.5 decide it by equipment: service equipment at other than dwelling units carries the maximum available fault current and its calculation date, services rated 1200 A and more add nominal voltage and clearing time, motor control centers document the value, and industrial machinery label it. The number is bolted current, not arcing current.

On this page
  1. Which NEC section requires an available fault current label?
  2. What must the 110.24 field marking include?
  3. What does 110.16(B) add for services rated 1200 A and more?
  4. What does 430.99 require at a motor control center?
  5. What does 670.5 add for industrial machinery?
  6. Which current goes on the label: bolted or arcing?
  7. How do you fill in the label on a 2000 A service?
  8. Can the short-circuit value share the arc-flash label?
  9. Questions asked

Four sections of NFPA 70, the National Electrical Code, which governs the electrical installation itself, decide whether a piece of equipment carries an available-fault-current label, and the equipment type picks the section. Service equipment at other than dwelling units gets the maximum available fault current and the calculation date under 110.24; services rated 1200 A and more add nominal system voltage and clearing time under 110.16(B); motor control centers document the value under 430.99; industrial machinery label it under 670.5. Every one of those numbers is bolted current, never arcing current. The sections arrived in different editions: 110.24 with 2011, the 670.5 change with 2017, 110.16(B) with 2020, all present in the 2023 edition, so confirm the edition your authority having jurisdiction has adopted before you apply a section number.

Which NEC section requires an available fault current label? #

It depends on what you are labeling: 110.24 covers service equipment at other than dwelling units, 110.16(B) adds a bigger marking on services rated 1200 A and more, 430.99 covers motor control centers, and 670.5 covers industrial machinery.

Equipment NEC section What you produce
Service equipment at other than dwelling units 110.24 (in the Code since 2011) Legible field marking with the maximum available fault current and the calculation date
Services rated 1200 A and more, other than dwelling units 110.16(B) (added in 2020) Field marking with nominal system voltage, available fault current, clearing time and application date, unless an arc-flash label covers it
Motor control centers 430.99 The available fault current and calculation date, documented and available to authorized people
Industrial machinery 670.5 (changed in 2017) The available short-circuit current on the label, beside the machinery's short-circuit current rating

All four serve one comparison: the marked number is what you check against the equipment's short-circuit current rating and against the interrupting rating of its overcurrent devices, the adequacy requirement 110.9 has carried since long before any of these labeling rules existed. A label states the size of the hazard; it never changes it.

What must the 110.24 field marking include? #

Two items on a marking durable enough for its environment: the maximum available fault current at that service equipment, and the date the fault-current calculation was performed.

The 2011 NEC introduced 110.24 together with an exception: the field marking is not required for industrial installations where conditions of maintenance and supervision ensure that only qualified persons service the equipment. Commercial, institutional and multiunit residential services never meet that exception, so they get the label. An industrial plant claiming it should be ready to show the AHJ the maintenance and supervision conditions behind the claim, and even then the calculation stays on file, because 110.24 also requires the available fault current to be documented for the people who design, install, inspect and maintain the system.

"Maximum" means the worst case the system can deliver at that point with every source that can be online at once, utility and plant generation together where they parallel. The relationship between the available fault current at the equipment and the transformer's secondary short-circuit current is laid out in available fault current vs secondary short circuit current.

Mark the value in kA at the line side of the service equipment, with the same precision the study prints, and use a marking that survives the environment the section names; outdoors that means an engraved or UV-resistant label, not a paper slip under tape.

What does 110.16(B) add for services rated 1200 A and more? #

Four fields, added by the 2020 NEC: nominal system voltage, the available fault current at the service overcurrent protective devices, the clearing time of those devices at that current, and the date the label was applied.

The clearing time has to be the installed service device's time at the marked current: read it off that breaker's or fuse's published curve at that current, not a frame default and not a time copied from another study case. At the kind of current a large service sees, the service breaker is in its instantaneous range and the curve typically shows a few cycles, but the curve decides, not the habit.

The exception does the combining for you: where an arc-flash hazard warning label is applied in accordance with acceptable industry practice, the 110.16(B) field marking is not required. The reason it works is that NFPA 70E, 2024 edition, uses the same two parameters, maximum available fault current and clearing time, as entries in its PPE category tables, so the data behind an arc-flash label already serves the lookup this section supports.

What does 430.99 require at a motor control center? #

A record, not a sticker: the available fault current at the MCC and the date the calculation was performed, documented and made available to those authorized to design, install, inspect or maintain the system.

The MCC's own short-circuit current rating is the separate marking required by 430.98, with the UL 845 assembly rating behind it; the relationship between that assembly rating and the bucket breakers is covered in MCC short-circuit rating vs bucket breaker ratings.

For 430.99, decide between two records: print the value and date on the door, or file the study page with the MCC documentation. Both satisfy the wording where the AHJ accepts them; the printed label is the one an inspector checks without asking anyone for a binder, and it survives staff turnover.

What does 670.5 add for industrial machinery? #

Since the 2017 NEC, the available short-circuit current goes on the machinery's label beside the short-circuit current rating, so the installed value and the built rating sit where anyone can compare them.

The machine builder supplies the rating; the installer's short-circuit study supplies the available current, so the field value is applied once the machine's supply is known. A machine shipped before the study is approved travels without that number and gets it at commissioning. If the machine later moves to a stiffer supply, the field number changes; the rating does not. Mark it as bolted kA with the date, exactly like a service label.

Which current goes on the label: bolted or arcing? #

Bolted current, in every case: the sections ask for the maximum available fault current, a bolted three-phase quantity, and arcing current is a smaller input to the incident-energy calculation.

If you copy a line from the arc-flash study output, copy the bolted-fault line at that bus, not the arcing-current line; which bolted fault current to use for breaker duty and arc flash sorts out the two. When the value shares a label with arc-flash data, the line must say maximum available fault current, so nobody reads the arcing-current figure as the available current.

How do you fill in the label on a 2000 A service? #

Take a 2000 A, 480 Y/277 V, three-phase service fed by a 1500 kVA transformer with 5.75 percent impedance: you compute the bolted current at the service, read the service breaker's clearing time at that current, and mark both with the voltage and two dates.

The full-load secondary current comes first, with the nameplate impedance as the only transformer data you need:

I(FL) = 1500 kVA / (1.732 × 0.48 kV) = 1804 A

The bolted three-phase secondary current is that full-load current divided by the impedance written as a decimal:

I(SC) = 1804 A / 0.0575 = 31,377 A, or about 31.4 kA

The estimate ignores the utility's source impedance, which pushes it slightly high, the safe direction for a rating check, and it ignores the conductor run to the gear and motor contribution at the bus, so the documented short-circuit study value is the number that goes on the label; this arithmetic tells you what to expect from it.

Clearing time comes from the installed service breaker's published curve at 31.4 kA. If the curve shows 3 cycles of total clearing there, then at 60 Hz: 3 × (1/60) s = 0.05 s, and 0.05 s is the number the label carries. The curve decides, not this example.

The finished label, one field per line:

  • Maximum available fault current: 31.4 kA
  • Fault-current calculation date: the date on the study
  • Nominal system voltage: 480 V
  • Clearing time at that current: 0.05 s
  • Label application date: the day it went on

One label like this satisfies 110.24 and 110.16(B) together on this service.

Then the decision the label exists for: the switchboard's marked short-circuit current rating and the service breaker's interrupting rating must both stand above the marked current. A nameplate rating of 65 kA clears it with margin; a 30 kA assembly fed from the same transformer does not, and the correction is different equipment or a protective scheme that limits the let-through current, because a label never fixes an underrated assembly.

Print and apply the label while the gear is still de-energized, locked out and verified dead; labeling is commissioning work finished before energization, not a live-work task.

Can the short-circuit value share the arc-flash label? #

Yes, as long as the combined label carries every field the governing sections ask for: many plants print the maximum available fault current and the calculation date on their arc-flash labels and drop the separate sticker.

110.16(B)'s exception already treats an arc-flash hazard warning label applied in accordance with acceptable industry practice as covering its marking, and 110.24 asks only for a legible field marking without saying which label carries the line. What NFPA 70E, 2024 edition, permits on a single label for shock and arc-flash data is covered in shock and arc flash data on one equipment label: what NFPA 70E allows; the NEC fields ride on the same label without conflict as long as each value is named.

So the decision for each case: one label per equipment item, every field the adopted sections require, the value in bolted kA, both dates present, and a reissued label whenever the study changes a number.

Questions asked

Does the equipment nameplate's SCCR count as the available fault current?

No. The nameplate states what the equipment withstands; the label states what the source can deliver at that point. Copying the main breaker's interrupting rating onto the label is not a calculation. The marked number has to come from a fault-current study at that bus, and the installation passes only when the rating stands above the marked current.

What changes trigger a new calculation and a new label?

Any change to the source or to the service overcurrent devices: a larger service transformer, a plant generator that parallels with the utility, or a replaced service breaker with a different trip unit. Recalculate at every affected bus, print the new calculation date on the new labels, and remove the old ones so nobody works from a stale number.

Which dates belong on the label?

110.24 wants the date the fault-current calculation was performed; 110.16(B) wants the date the label was applied. A combined label shows both. When a new study changes the value, both dates move: the new calculation date comes from the study, and the new application date from the day the replacement label goes on.

Do dwelling-unit services need the marking?

No. Both 110.24 and 110.16(B) apply to service equipment at other than dwelling units, so a single-family house or an individual apartment service falls outside the requirement. The label obligation begins with commercial, institutional and industrial services.

Keep reading

  • Explainer

    Available fault current vs secondary short-circuit current

    Available fault current and secondary short-circuit current name the same prospective current only when both refer to the same point, fault type and current basis. A supplied value equal to the transformer's full-load current divided by its percent impedance assumes an infinite source: for a 300 kVA, 480 V, 2.0% Z unit that is 361 A / 0.02 = 18,050 A. That number is conservative for equipment duty but not automatically the worst case for arc flash.

    Protection: breakers, fuses and SCCR

  • Troubleshooting

    Checking a delta high leg arc flash calculation's numbers

    The 9.127 kA at the panelboard checks out against the 11.33 kA infinite-source terminal limit once utility impedance is counted. The 73 cal/cm² hinges on clearing time: the referred bolted current clears the 600 A primary breaker in 0.033 s, but IEEE 1584 sets device time from the arcing current, which falls below the 3,600 A pickup into the thermal band — so the label is credible until the study file shows otherwise.

    Electrical safety and codes

  • Explainer

    NFPA 70E table limits for operating switchgear breakers

    NFPA 70E's table method is bounded by available fault current, clearing time and working distance, not by the main breaker's ampere rating. A large continuous rating alone does not put switchgear outside the tables; the real gate is the calculated fault duty and the clearing time of the device that clears. When either exceeds the table limits or cannot be determined for lack of data, the compliant routes are the normal-operation exception for door-closed switching and an incident energy analysis of that switchgear.

    Electrical safety and codes