Reducing arc flash on a transformer secondary with no main breaker

Electrical safety and codes Published 9 min read By Current Intel engineering team

Short answer

With no secondary main, incident energy at the secondary bus is set by the primary fuse's clearing time at the reflected arcing current. The fix: a vacuum breaker in the fuse compartment, tripped by a relay, cuts arc duration from 1.0 seconds to about 70 milliseconds and divides incident energy by about 14 in the worked example.

On this page
  1. Why is arc flash so high on a transformer secondary with no main breaker?
  2. How much does clearing time change incident energy?
  3. What current does the primary fuse see for a secondary arc?
  4. Can a vacuum breaker replace the primary fuses?
  5. What clearing time should the retrofit actually deliver?
  6. Where does the relay pickup go between inrush and arcing current?
  7. What else changes when you take the fuses out?
  8. Which option fits when a breaker swap is not possible?
  9. Questions asked

On a unit substation with no main breaker on the transformer secondary, incident energy at the 480 V bus is set by one quantity: how long the primary-side device takes to clear the reflected arcing current. The practical fix is to replace fuse melt time with relay-plus-breaker operate time — a vacuum breaker in the primary fuse compartment, tripped by an instantaneous overcurrent element. In the worked example below, that moves arc duration from 1.0 s to 70 ms, and because incident energy scales linearly with arc duration, the label drops by a factor of about 14. The arithmetic is simple; the real work is in the constraints: compartment fit, interrupting rating, switchgear OEM acceptance, and a relay pickup window between transformer inrush and the arcing current.

Why is arc flash so high on a transformer secondary with no main breaker? #

Because every secondary device sits downstream of the bus, only the primary protection clears a fault on the secondary bus — the arc lasts until the primary device opens, and with a primary fuse that means melt time on its time-current curve at the reflected arcing current.

Every feeder breaker on that bus sees the fault as upstream of itself, so nothing on the secondary side opens; the arc burns until the primary device clears it. That is why labels at these buses come out enormous even when fault current is modest — duration, not current, drives the number. It is the secondary blind spot, and why the transformer secondary blind spot exceeds Category 4 covers what it does to PPE categories. The clearing time that belongs in the calculation is the primary device's at the reflected arcing current — the same question as what clearing time applies to a transformer secondary arc — and with no secondary main, that device is the primary fuse.

How much does clearing time change incident energy? #

Incident energy scales linearly with arc duration at a fixed arcing current, the relation that IEEE 1584-2018, the IEEE guide for arc-flash hazard calculations, builds into its model — so 70 ms of arc instead of 1 second divides the incident energy by about 14.

Nothing about the arc changes when you change the clearing device: same arcing current, same working distance, less time, so E2 ÷ E1 = t2 ÷ t1. Worked example, every input illustrative: 1500 kVA delta-wye transformer, 13.8 kV to 480 V, three-phase, 60 Hz, nameplate impedance 5.75 percent, infinite primary source, 455 mm working distance, arcing currents from an illustrative study. The study gives 40 cal/cm² at the secondary bus with the primary fuse clearing in 1.0 s. With the retrofit clearing in 70 ms: E2 = 40 cal/cm² × 0.07 = 2.8 cal/cm². That result is a model estimate, not a measurement — run your own numbers on one IEEE 1584 edition, keep its publish date with the study, and check the result against the governing requirements and the equipment documentation. If a post-retrofit timing test measures longer than the modeled figure, incident energy rises by the same ratio, so re-run with the measured number.

What current does the primary fuse see for a secondary arc? #

For a three-phase arc on the example transformer, the 480 V arcing current reflects to the 13.8 kV primary divided by the 28.75 voltage ratio: 22 kA becomes 765 A, and the reduced 18.7 kA case becomes 650 A.

The arithmetic, with the same illustrative inputs as above:

  • Secondary full-load current: 1,500,000 VA ÷ (1.732 × 480 V) = 1,804 A
  • Bolted three-phase fault at the secondary bus, infinite primary assumed: 1,804 A ÷ 0.0575 = 31,374 A
  • Voltage ratio: 13,800 V ÷ 480 V = 28.75
  • Reflected nominal arcing current: 22,000 A ÷ 28.75 = 765 A
  • Reflected reduced arcing current, the 85 percent case: 18,700 A ÷ 28.75 = 650 A

Arcing current sits well below bolted current, and the reduced case is where the fuse hurts you. At 650 A the example's 100E primary fuse runs at 6.5 times its rating — a point on the published curve that reads 1.0 s of total clearing. The melt region of an E-rated curve is steep at low multiples, so a modest drop in current moves clearing from cycles into seconds, the same melt behavior that lies behind troubleshooting primary cutouts that melt under load. A hand ratio also misleads on a delta-wye unit: for a single line-to-ground secondary fault, the delta primary redistributes the per-phase currents differently than the three-phase case, so take reflected values from your short-circuit study rather than dividing by the ratio.

Can a vacuum breaker replace the primary fuses? #

Yes — 15 kV-class vacuum breakers in metal-clad construction are standard equipment from multiple manufacturers, and one installed in the fuse compartment with CTs and a protective relay is the retrofit that covers the whole secondary bus, transformer terminals included.

Three checks decide it. Voltage class: the breaker must suit the 13.8 kV system, which puts it in 15 kV-class metal-clad switchgear built to IEEE C37.20.2, with two-high breaker arrangements standard up to 15 kV in manufacturer application guides. Interrupting rating: the reflected bolted current from the study, 31,374 A ÷ 28.75 = 1,091 A here, must sit below the breaker's nameplate rating. Fit: whether a given breaker's dimensions work in your fuse compartment is a model-by-model question, so get dimensional confirmation from the breaker manufacturer and written acceptance of the modification from the switchgear OEM, keeping the assembly's listing valid.

The breaker opens nothing on its own: add CTs, a relay with an instantaneous element, and dependable control power for the trip circuit, because the breaker must open even when the voltage it feeds has collapsed. All of this is de-energized work: lock out, and test for absence of voltage before opening the fuse compartment or any primary connection.

What clearing time should the retrofit actually deliver? #

Add the relay's operate time to the breaker's opening time: about 20 ms for a modern instantaneous element plus three cycles, 50 ms at 60 Hz, for a standard vacuum breaker — roughly 70 ms of total arc duration, read from both datasheets rather than assumed.

Total arc duration is t_clear = t_relay + t_breaker, plus any auxiliary-relay or trip-circuit delay in the path. The 50 ms term is a mechanical rating: standard medium-voltage vacuum breakers interrupt within about three cycles, some modern mechanisms are faster, and the datasheet figure governs, confirmed with a timing test. The relay term comes from the manufacturer's published operate-time data for your relay at the multiple of pickup your fault current produces. Both arcing-current cases clear in that total, which is the second gain over the fuse: once the pickup sits below both cases, the slow reduced-current clearing disappears. Breaker opening time alone is not clearing time — a slow relay or a tired trip circuit turns a three-cycle breaker into a much longer event, which is why the timing test in the work list below matters.

Where does the relay pickup go between inrush and arcing current? #

Set the instantaneous pickup between the transformer's magnetizing inrush and the smallest reflected arcing current: with about 500 A of inrush below and the reduced arcing case above, the example pickup lands at 600 A.

The example transformer's primary full-load current is 1,500,000 VA ÷ (1.732 × 13,800 V) = 62.8 A. Magnetizing inrush on energization runs several times full load and decays within a fraction of a second — about 8 times here, roughly 500 A. The pickup must sit above that, so no energization trips it, and below the reduced arcing current reflected to the primary, so the arc picks up the instantaneous element. The 600 A figure does both, with margins thin enough that you verify them on the relay's actual curve for your transformer rather than on these example numbers. If no pickup satisfies both limits, the primary breaker cannot see the arc, and the design moves to secondary-side detection: an arc-flash relay using light plus current, tripping a device that can actually open, because the fuse itself has no trip coil. Some relays offer inrush restraint or blocking that widens the window; read the relay manual for what your model provides before counting on it.

What else changes when you take the fuses out? #

You lose the fuse's current limiting, so the breaker passes the full prospective peak in the first half-cycle, and the bus bracing and the breaker's close-and-latch duty must be checked against the study's available fault current.

The other duties move with it:

  • Transformer protection: the fuse also covered internal faults and severe through-faults. The relay's time-overcurrent element takes the overload and backup duty, and where the study or the switchgear OEM calls for it, add transformer differential, still coordinated with the upstream device so a primary internal fault clears at the primary breaker.
  • Study refresh: re-run the arc flash calculation with the new clearing-time budget at both arcing-current cases and compare the result with the PPE level you intend to work to.
  • Verification: inject the relay at and above the pickup and record its operate time; time the breaker from trip command to main-contact parting with a breaker timing analyzer. If the measured total exceeds the modeled figure, incident energy rises by the same ratio — put the measured number back into the study.
  • Commissioning: energize the transformer several times and confirm no inrush trip before sign-off.
  • Labels: NFPA 70E, 2024 edition, requires the arc flash risk assessment to be updated when the electrical system changes and reviewed at intervals not exceeding five years, with labels carrying the incident energy and arc flash boundary from that assessment. Apply new labels with the post-retrofit values, and confirm the requirement with the authority having jurisdiction and the equipment documentation. What belongs where on these substations, including the line-side sections, is worked through in transformer secondary and switchboard line-side arc flash labels.

Which option fits when a breaker swap is not possible? #

A secondary main breaker, an arc-flash detection relay, or a maintenance-mode setting can cut arc duration instead, and each carries a constraint the primary-breaker retrofit does not.

Option What sets the arc duration Constraint that decides it
Vacuum breaker in the fuse compartment Relay operate time plus breaker opening time Compartment fit at the voltage class, interrupting rating, written OEM acceptance
Secondary main breaker The main's own clearing time Space and CTs; the section between transformer terminals and the main stays cleared only by primary protection
Arc-flash detection relay, light plus current Detection time plus the tripping device's opening time Needs a breaker or switch it can trip; a fuse has no trip coil
Maintenance-mode setting Lower pickup and shorter delay while personnel are exposed Exists only where the clearing device is already a relay-driven breaker

The decision: where the compartment takes a breaker and the OEM accepts the modification, the fuse-for-breaker swap is the fix — it is the only option that covers the entire secondary bus including the transformer terminals, adds no new dead zone, and produces a clearing time you can compute, measure and put on a label. Where it does not fit, a secondary main covers everything downstream of itself, and whether you can credit it for the bus nearest the transformer depends on barriers, laid out in when a barrier lets you credit a switchboard main breaker. A different fuse rating only slides the operating point along the same steep melt curve; do not spend the budget there.

Questions asked

Does the 2-second cap in arc flash software change the calculation?

Many studies cap modeled arc duration at 2 seconds when a device would take longer to clear. The cap limits the calculated exposure, not what a real arc would deliver, and the primary device still decides whether it applies. After the retrofit, clearing falls to tens of milliseconds, so the cap never comes into play.

Does the retrofit change the incident energy on the primary side too?

Faults on the line side of the new breaker still clear at the upstream device, so that label barely moves. Faults at the breaker's load side, transformer primary terminals included, previously waited on fuse melt time and now clear in relay-plus-breaker time. Re-run both cases in the study so the primary-side labels reflect the new clearing devices.

What takes over the fuse's protection of the transformer itself?

The relay's time-overcurrent element carries overload and through-fault backup duty, the instantaneous element carries the secondary bus fault, and larger units add transformer differential where the study or the switchgear OEM calls for it. Keep coordination with the upstream device so an internal primary fault still clears at the primary breaker rather than upstream.

Does the arc flash boundary shrink by the same factor?

No. Incident energy scales linearly with arc duration, but the boundary follows the model's distance exponent and moves less than linearly, so halving the arc duration does not halve the boundary. Re-run the study, read the new boundary from the model output, and label the equipment with that value.

Keep reading

  • Explainer

    What clearing time applies to a transformer secondary arc

    An arc ahead of a transformer secondary main breaker is cleared upstream, so the label's clearing time comes from the primary device's total-clearing curve read at the arcing current reflected to the primary (I_pri = I_arc × V_sec / V_pri), capped at 2 s where the curve is slow or unverified. The quoted 32,000 A assumes an infinite utility source; get the real fault duty, because lower current means longer clearing time.

    Electrical safety and codes

  • Selection guide

    When a Class L fuse actually cuts arc flash energy

    A current-limiting Class L fuse reduces arc flash incident energy only when the calculated arcing current at the fuse exceeds its current-limiting threshold, roughly 20 to 50 times its rating for large time-delay sizes. Below that threshold the fuse clears on its time-delay curve and can leave incident energy far above a static-trip breaker, so fuse size, arcing current and coordination get checked separately.

    Electrical safety and codes

  • Explainer

    Why main-breaker settings can't protect switchboard line-side buswork

    A main breaker's trip settings cut calculated incident energy only for faults that stay on its load side. Credit them only when the main compartment is verified separated from line-side buswork front and rear; otherwise the study keeps the upstream clearing time, and an added barrier earns credit only with a documented manufacturer or qualified-engineer basis.

    Electrical safety and codes