Explainer
What clearing time applies to a transformer secondary arc
Short answer
An arc ahead of a transformer secondary main breaker is cleared upstream, so the label's clearing time comes from the primary device's total-clearing curve read at the arcing current reflected to the primary (I_pri = I_arc × V_sec / V_pri), capped at 2 s where the curve is slow or unverified. The quoted 32,000 A assumes an infinite utility source; get the real fault duty, because lower current means longer clearing time.
On this page
An arc on the secondary side of a transformer, ahead of the secondary main breaker's contacts, is cleared by the device upstream of the transformer — never by that main. The clearing time for the label therefore comes from the primary fuse's or breaker's time-current curve, read at the arcing current reflected to the primary (I_pri = I_arc × V_sec / V_pri), and capped at 2 s where the curve runs long or the data is soft — the longest duration IEEE 1584-2018 applies where a person can reasonably be expected to move away. Before reading any curve, replace the 32,000 A quoted for the 150 kVA, 208 V secondary in this case: it assumes an infinite utility source, and the real current is lower, which makes the clearing time longer.
Why the secondary main never clears this arc #
A main breaker protects only what sits downstream of its contacts and its current path. The line lugs sit ahead of both, so a fault there is invisible to the main: its trip unit never sees it. Inside the panel that houses the main, those lugs are exposed conductors sharing one enclosure with the bus. In an unsegregated panelboard, a flash on the load-side bus can carry over to the line lugs, and the fault lands ahead of the main — the next device upstream, normally a fuse or breaker on the transformer's primary, does the clearing.
Geometry decides the labeling. Switchgear with a segregated main compartment gets two labels: one on the main, using the upstream device's time, and one on the load bus, using the main's. Panelboards and similar unsegregated equipment get one label, calculated ahead of the main. The dedicated guide to labeling transformer secondaries and switchboard line sides walks those compartment cases.
What the quoted bolted current assumes #
Back-check the number first. Full-load current for a three-phase 150 kVA transformer at 208 V is 150,000 VA ÷ (1.732 × 208 V) ≈ 416 A. A bolted fault current of 32,000 A at the secondary terminals implies a total impedance of 416 A ÷ 32,000 A = 0.013, or 1.3%, with every ohm of it in the transformer and zero utility impedance behind it. That is not a real service: the nameplate impedance and the utility's source impedance both add in series with it, and both cut the current at the secondary terminals. Ask the utility for the actual fault duty with its MVA base and sequence impedances, and convert it for the model — the reference on calculating source impedance from a prospective short-circuit figure shows that conversion.
Lower current buys no margin. Protection is inverse-time: less current moves the operating point to the right on the upstream curve, where clearing time climbs. On the steep part of a fuse curve, the added seconds outweigh the smaller current, and incident energy rises. An optimistic current assumption is pessimistic for time.
Get the curves too: minimum-melt and total-clearing curves for the 100 K fuses, and the time-delay breaker's settings with the unit of its 2.5 delay confirmed — 2.5 s and 2.5 cycles differ by a factor of 60 at 60 Hz.
Reading the upstream curve at the reflected current #
With a corrected bolted current and real curves, assign the time in five steps. The worked reference on calculating a line-side arc flash with upstream protection follows the same sequence.
-
Compute the arcing current at the secondary bus with the IEEE 1584-2018 model in the arc flash software, and run the reduced-arcing-current variation as well: the software computes incident energy at each case and the study keeps the worst, because the low-current case is the slow case on the upstream curve. Dedicated software carries the reflection through the transformer automatically — how arc flash software assigns upstream clearing for line-side faults shows the assignment — while spreadsheet-level tools make it awkward.
-
Reflect the current to the primary with the nameplate voltages: I_pri = I_arc × V_sec / V_pri, where I_arc is the arcing current at the secondary bus, V_sec is the secondary voltage and V_pri is the primary voltage from the nameplate. The winding connection changes how an unbalanced case distributes per phase; let the software model it.
-
Read total clearing time — never minimum melt — from the 100 K fuse curve at the reflected current. Fuse voltage class shapes those curves, and the reference on fuse voltage class and time-current characteristic curves explains the effect.
-
Read the same currents on the upstream breaker curve, with the delay unit confirmed. Take the faster device only where its operation is certain; otherwise take the slower.
-
Cap the result: IEEE 1584-2018 treats 2 s as the maximum arc duration where a person can reasonably be expected to move away. Where either curve reads longer, or the operating point sits where a small current error moves the reading by orders of magnitude, use the cap and record that the cap was applied.
Example: clearing time for a 150 kVA, 208 V secondary quoted at 32,000 A #
Inputs, with their sources:
- Transformer: 150 kVA, three-phase, 208 V secondary — the study data. Primary voltage assumed 480 V for the example; read the real value from the nameplate.
- Quoted bolted fault current at the secondary terminals: 32,000 A, supplied without source impedance.
- Arcing current at the secondary bus: 15,000 A base case, 9,000 A reduced case — illustrative software results standing in for the study's own.
- Upstream devices: 100 K fuses, read here as 100 A Class K; a time-delay breaker whose 2.5 delay unit is unconfirmed.
Rule: reflected primary current = secondary arcing current × secondary voltage ÷ primary voltage; the clearing time is the total clearing time read from the upstream curve at that current, capped at 2 s.
Arithmetic:
- Full-load check: 150,000 VA ÷ (1.732 × 208 V) ≈ 416 A.
- Implied impedance: 416 A ÷ 32,000 A = 0.013, or 1.3%. The quote is an infinite-source value, so it feeds the arcing-current calculation only until the utility letter arrives.
- Base case: I_pri = 15,000 A × (208 V ÷ 480 V) = 15,000 A × 0.433 ≈ 6,500 A.
- Reduced case: I_pri = 9,000 A × 0.433 ≈ 3,900 A.
- Curve readings: at 6,500 A the 100 A fuse carries 65 times its rating; at 3,900 A it carries 39 times, where a Class K curve starts to bend and the reading is sensitive to the current fed in. Read both points on the total-clearing curve; the slower governs. The same two currents go onto the breaker curve once its delay unit is confirmed.
Result: the label's clearing time is the slower of the two verified curve readings, capped. Every reading above is an estimate until it matches the manufacturer's curve sheet, and today — with the utility letter outstanding, the fuse curves unverified and the breaker's delay unit unknown — the defensible value on the label is the cap.
Decision: when the verified readings are in hand, label with the faster device's time at the reflected current if its operation is certain and under the cap; label at the cap until then; and treat hands-on work at the line lugs as an outage whenever the verified time is not well below the cap.
When the label comes out unworkable #
Reflected primary protection usually arrives too slow to rescue a line-side exposure: the primary fuse is sized for transformer protection and load, so at the reflected arcing current it often sits well down its curve. Sites that run this calculation tend to land on the same outcome — the number is computable, and the line lugs are still no place for energized work.
Three fixes bring the energy down, and each is a project: a smaller primary fuse where inrush and load coordination allow it; a maintenance-mode or instantaneous setting on an upstream relay or trip unit; a device installed between the transformer and the work location. Every one needs a coordination study, and anything on the utility's side of the point of ownership needs the utility's agreement. Before crediting a fuse as the fix, read the case on when a Class L fuse actually cuts arc flash energy.
One rule outranks every number above: establish an electrically safe work condition before the panel comes open — de-energize, lock and tag, and test for absence of voltage. NFPA 70E, 2024 edition, permits energized work only where de-energizing is infeasible, with the risk assessment and the PPE the incident energy selects; confirm the requirement with your authority having jurisdiction and the equipment documentation.
The decision, case by case #
- Work on the load bus behind a segregated main: the main's verified clearing time applies, and the label reads to the main.
- Work inside an unsegregated panel, or anywhere ahead of the main's contacts: the upstream device's time at the reflected arcing current, and the cap while the utility letter and curves are outstanding.
- Hands-on work at the line lugs: an outage — planned, locked, tagged and verified — regardless of what the label says.
Questions asked
Does the cap apply to every arc flash label?
No. IEEE 1584-2018 frames 2 s as the maximum arc duration used where a person can reasonably be expected to move away and escape. In a cramped enclosure or a spot with no retreat path, the calculation keeps the full device clearing time instead. Record on the study which basis was used, and confirm the edition your software follows.
Why can a lower fault current make the arc flash worse?
Protection is inverse-time: at lower current the upstream device clears more slowly. Replacing an infinite-source figure with the utility's real fault duty lowers the arcing current, moves the operating point to the right on the upstream curve, and raises the clearing time. On the steep part of a fuse curve, the added time can outweigh the smaller current and push incident energy up.
What exactly should I request from the utility?
The actual fault duty at the transformer's secondary terminals with the MVA base, the sequence impedances and the X/R ratio, plus time-current curves or settings for any utility-owned fuse, recloser or breaker upstream. Ask directly whether the supplied figure was computed with an infinite source. Without those items, the secondary-side study cannot get past a capped clearing time.
When can the secondary main breaker's clearing time be used?
Only for faults it can actually see and interrupt: load-side work in equipment where the main sits in its own segregated compartment, so a flash in the work area cannot reach the line lugs. Anywhere ahead of the main's contacts, and in any unsegregated panelboard where flashover can reach them, the upstream device sets the clearing time.
Is a 2.5-cycle delay the same as a 2.5-second delay?
No. At 60 Hz, 2.5 cycles is 2.5 ÷ 60 = 0.042 s, sixty times shorter. Relay and trip-unit delays are quoted in seconds, cycles or device-specific counts depending on the manufacturer, so the study must take the unit from that trip unit's settings sheet. Reading the wrong unit puts the clearing time off by orders of magnitude.