Should ground fault clearing time set arc flash incident energy

Electrical safety and codes Published 6 min read

Short answer

No. IEEE 1584-2018 bases the incident energy on the three-phase arcing fault, and the clearing time comes from the phase overcurrent device at the arcing current, so the ground fault element never sets the label value. It still earns its place in the protection study, and outdoor open-air equipment under the NESC keeps its line-to-ground basis.

On this page
  1. The three-phase basis behind the label
  2. Where the clearing time actually comes from
  3. Why the ground fault element cannot set the time
  4. The exception: outdoor open-air equipment
  5. Worked example: a 480 V MCC bus at 11.9 kA arcing current
  6. Correcting a study that already took the credit
  7. Questions asked

No. For enclosed equipment - switchgear, MCCs, panelboards, most industrial enclosures - the incident energy on the label comes from a three-phase arcing fault, and the clearing time inside that calculation is the phase overcurrent device's time at the arcing current. IEEE Std 1584-2018, the IEEE Guide for Performing Arc-Flash Hazard Calculations, builds its models on that basis, so a faster ground fault curve is not an input to the calculation, however real its speed is. Ground fault protection still earns its place: it clears many line-to-ground arcs before they escalate and limits damage. The one setting where a line-to-ground basis is the intended method is outdoor open-air utility equipment under the National Electrical Safety Code.

The three-phase basis behind the label #

IEEE 1584-2018 provides the mathematical models for arcing current, incident energy and the arc-flash boundary, developed from laboratory arc testing; the 2002 edition it replaced was the first arc-flash standard built on that testing. The models apply across the guide's stated voltage range, 208 V through 15,000 V. Equipment below 240 V need not be considered unless its immediate supply includes at least one 125 kVA or larger low-impedance transformer - evaluating arc flash risk in 240 V and lower panels walks through that end of the scale.

Inside an enclosure, the physics drive the answer. Most faults begin line-to-ground, but the ionized gas the arc produces bridges the phase conductors, and the fault escalates to three-phase almost instantly. Three-phase faults also produce the highest arc-flash levels. IEEE 1584 accordingly recommends that arc-flash calculations for enclosed equipment be based on three-phase faults, and every incident energy that comes out of the guide assumes one.

Where the clearing time actually comes from #

The time in the incident-energy calculation belongs to the device that clears that three-phase arc:

  • Calculate the three-phase arcing current at the bus with the IEEE 1584-2018 equations. Arc impedance means it is lower than the bolted fault current, often far lower.
  • Plot that current on the time-current curve of the upstream phase overcurrent device - trip unit, fuse or phase relay.
  • Read the total clearing time, including any short-time delay and the breaker's opening time, and use that value in the incident-energy calculation.

The trap is the pickup. A device whose instantaneous pickup sits above the arcing current will not trip instantaneously; it rides its short-time band, and the time there is what goes in. Check the instantaneous pickup against the arcing current, never the bolted value. Which device in a line-up does the clearing is its own question, covered in which breaker sets the MCC arc flash duration. Where the source decays, as on a generator bus, the arcing current can fall through the pickup band mid-event; handling generator fault-current decay in arc flash studies covers that case.

If reading the trip unit or relay means opening a door, the job starts with de-energizing, lockout and testing for absence of voltage; NFPA 70E, 2024 edition, covers those work practices.

Why the ground fault element cannot set the time #

A ground fault element - a relay or a trip-unit function - measures residual current, the phasor sum of the three phase currents. Run the sequence in an enclosure:

  1. The fault starts line-to-ground; the element picks up and starts its delay.
  2. The arc escalates to three-phase; the phase currents approach balance and the residual sum falls toward zero.
  3. The element resets or never completes its delay, while the three-phase arc keeps burning until the phase device clears it.

Crediting the ground fault element's time therefore assumes a protective action that stops during precisely the fault the label must cover. That is the engineering reason, not just conservatism.

What ground fault protection does deliver: it clears line-to-ground arcs before escalation in some cases and limits ground-fault damage, and impedance grounding reduces ground fault energy further. None of that changes the three-phase worst case. Devices that genuinely cut incident energy do it by clearing the arcing current faster - fuses operating in their current-limiting band are the classic case, and when a Class L fuse actually cuts arc flash energy covers the conditions.

The exception: outdoor open-air equipment #

ANSI C2, the National Electrical Safety Code, added arc-flash requirements in its 2007 edition for utility supply-side and overhead equipment. With the wide phase spacing of open-air construction, three-phase arcs are uncommon, and those requirements are built on line-to-ground faults - so on that equipment the ground fault basis is the intended one, not a shortcut. Industrial in-plant equipment stays with IEEE 1584. Confirm which NESC edition your jurisdiction or utility has adopted, and the equipment documentation, before applying its tables.

Worked example: a 480 V MCC bus at 11.9 kA arcing current #

The question came without a specific bus, so this is a typical MCC case; every input is the kind of number a study file holds.

Inputs:

  • 480 V, three-phase, 60 Hz MCC bus in an enclosed lineup - equipment type from the one-line.
  • Bolted three-phase fault current at the bus: 22.0 kA - short-circuit study, utility contribution plus transformer impedance.
  • Three-phase arcing current at the bus: 11.9 kA - IEEE 1584-2018 calculation at this bus.
  • Upstream main breaker, 1200 A sensor, LSIG trip unit: instantaneous pickup 12.0 kA, short-time delay 0.20 s, breaker opening time 0.05 s - trip-unit settings and coordination file.
  • Ground fault element on that breaker: clears in 0.12 s above pickup - its time-current curve.
  • Incident energy at an 18 in working distance with 0.25 s clearing: 8.4 cal/cm² - the study's IEEE 1584 run.

Rule in words: in the IEEE 1584 equations, incident energy is directly proportional to arcing duration. At one bus, with one arcing current, one enclosure and one working distance, the energy scales with clearing time: E2 = E1 × t2 / t1.

Arithmetic:

  • Phase device at the arcing current: 11.9 kA is below the 12.0 kA instantaneous pickup, so there is no instantaneous trip. Short-time band: 0.20 s delay + 0.05 s opening = 0.25 s clearing.
  • Ground fault credit: 8.4 cal/cm² × 0.12 s / 0.25 s = 4.0 cal/cm².
  • Reading the curve at the bolted current instead: the instantaneous band clears in about 0.03 s, giving 8.4 × 0.03 / 0.25 = 1.0 cal/cm².

Result: the calculation basis gives 8.4 cal/cm² at 0.25 s; the ground fault credit claims 4.0 cal/cm²; the bolted-current shortcut claims 1.0 cal/cm².

Decision: the label carries 8.4 cal/cm² with the 0.25 s phase-device clearing time, and PPE selected by the incident-energy method needs an arc rating of at least 8.4 cal/cm². Both shortcuts are rejected because each substitutes a time the actual fault cannot deliver. The rule for any study: an enclosed bus whose clearing time traces to anything but the phase overcurrent device at the arcing current gets rerun before its label is trusted.

Correcting a study that already took the credit #

Change the clearing-time source on every enclosed bus to the phase device that clears the three-phase arcing current, rerun those buses, and reprint the labels where the energy rose - replacing a shorter ground fault time can only raise the value or leave it equal. Update the PPE tables with the new numbers.

Leave the ground fault element alone in the protection and coordination study; it is often required, not optional: NFPA 70, the National Electrical Code (2023 edition), Article 230.95 mandates ground-fault protection of equipment on solidly grounded wye services above 150 V to ground and up to 1000 V phase-to-phase where the disconnect is rated 1000 A or more, with a maximum setting of 1200 A and a maximum delay of 1 s at 3000 A. Confirm the adopted editions and the equipment documentation with the authority having jurisdiction, since requirements differ by edition and local amendment.

Questions asked

Our ground fault relay is much faster than the phase device - can its time ever go into the label?

Only where the fault basis itself is line-to-ground: outdoor open-air equipment calculated under the National Electrical Safety Code. Inside enclosures the escalated three-phase arc leaves almost no residual current to measure, so the element may never finish its delay and the arc burns until the phase device clears. A commissioning test proves clearing of a sustained ground fault, which is not the fault the label prices. Keep the element's speed in the coordination study.

Does high-resistance grounding reduce the incident energy on the label?

Not the number. High-resistance grounding limits line-to-ground fault current to a few amperes and stops most ground faults from escalating, which is a genuine risk reduction. The IEEE 1584 three-phase calculation never uses the ground path, so the label value for enclosed equipment is unchanged and PPE selection follows that value. Record the grounding method in the study so the assumption stays visible to whoever updates it.

How do I spot ground fault credit in a finished arc flash report?

Compare each bus's reported clearing time against two curves read at the calculated arcing current: the ground fault element's and the phase overcurrent device's. A time that matches the ground fault curve while the phase device would take longer at the same current is the flag. Ask the study author to show the time-current curve point behind every clearing time before you accept the label and its PPE level.

The phase device has both instantaneous and short-time bands - which time goes into the calculation?

Whichever band the three-phase arcing current actually lands on, plus the breaker's opening time. Arcing current runs well below bolted current, so a device that trips instantaneously at the bolted value can sit on its short-time delay at the arcing value. IEEE 1584-2018 also applies an arcing-current variation, so evaluate the lower arcing current too: it can push the device further into its delay and raise the incident energy.

Keep reading

  • Explainer

    Evaluating arc flash risk in 240 V and lower panels

    No edition of CSA Z462 or NFPA 70E in force today exempts 240 V-and-below panels from arc-flash risk assessment: the 125 kVA single-transformer note was tied to IEEE 1584-2002 and is gone. At 208 V three-phase, compare available fault current with the guide's 2,000 A likelihood boundary and run the 2018 analysis above it. At 240 V single-phase, the model does not apply, so document the scope limit and work the panel de-energized.

    Electrical safety and codes

  • How-to

    Which breaker sets MCC arc flash duration

    Use the MCC main breaker's clearing time only for faults on its load side. In an MCC with no documented arc-resistant rating — including early-1980s lineups — treat arc propagation ahead of the main as credible and take duration from the upstream 480 V switchgear breaker: at 20 cycles instead of 6, incident energy multiplies by 3.33. Where construction leaves the path uncertain, calculate both cases and label the higher result.

    Electrical safety and codes

  • Explainer

    Why voltage barely changes NFPA 70E incident energy

    Incident energy is set by arcing current and clearing time, not the nominal voltage: an arc drops roughly 80–200 V of its own, so at 480 V it draws well under bolted-fault current and the clearing device sits in a slower part of its curve. The simplified equations in earlier NFPA 70E editions were stated valid 16–50 kA; below 16 kA use IEEE 1584-2018, stated for 500 A to 106 kA at 208–600 V.

    Electrical safety and codes