Short answer

No edition of CSA Z462 or NFPA 70E in force today exempts 240 V-and-below panels from arc-flash risk assessment: the 125 kVA single-transformer note was tied to IEEE 1584-2002 and is gone. At 208 V three-phase, compare available fault current with the guide's 2,000 A likelihood boundary and run the 2018 analysis above it. At 240 V single-phase, the model does not apply, so document the scope limit and work the panel de-energized.

On this page
  1. Where the 125 kVA exemption came from
  2. What the standards require today
  3. Why 208 V three-phase is in the analysis now
  4. Checking a 208 V panel fed by a 125 kVA transformer against 2,000 A
  5. Single-phase 240 V panels sit outside the model
  6. The decision by case
  7. Questions asked

No edition of CSA Z462 or NFPA 70E in force today exempts a panel from arc-flash risk assessment because it operates at 240 V or less. The clause behind the folklore — that voltage or less, supplied by one transformer rated under 125 kVA, no incident-energy analysis needed — appeared in the 2008-era editions and rested on IEEE 1584-2002; it is gone from CSA Z462 (2021 and 2024 editions) and from NFPA 70E (2024 edition). The answer now splits by construction: 208 V three-phase panels are inside the IEEE 1584-2018 models and usually sit well above the guide's likelihood boundary, so you run the analysis; single-phase panels at the same nominal voltage are outside the model's scope, so you document that limitation and work them de-energized. Nothing here is permission to work a panel live — de-energize, lock out and test for absence of voltage before any cover comes off, at that voltage exactly as at 480 V.

Where the 125 kVA exemption came from #

The 2008 edition of CSA Z462, and NFPA 70E of the same era, carried a note that an incident-energy analysis was not required for systems at or below the panel voltage in question when supplied by a single transformer rated less than that cutoff. The cutoff came from IEEE 1584-2002: the test data and model behind that edition were what the note was built on. IEEE 1584 was rewritten for 2018 — new arc tests, new equations, electrode configuration as an input — and the note lost its basis; later editions of both safety standards dropped it. Citing it today is citing a 2008 text. The 2021 edition of CSA Z462, and the 2024 edition that supersedes it, contain no clause that treats such low-voltage systems as a special case for incident-energy analysis; the requirements are general and reach low voltage like everything else.

What the standards require today #

NFPA 70E, the Standard for Electrical Safety in the Workplace, 2024 edition, requires an arc-flash risk assessment for work on or near energized conductors or circuit parts, met either by an incident-energy analysis or, within its stated conditions, by the arc-flash PPE category tables. CSA Z462, Workplace Electrical Safety, carries the equivalent Canadian requirements; in the 2021 edition the arc-flash protection and risk-assessment provisions sit in Clause 8, and a 2024 edition is current. Neither standard contains a voltage-based exemption, and both expect the assessment to be documented. Confirm the requirement that applies to your site with the authority having jurisdiction and the equipment documentation, since editions and local amendments differ.

Why 208 V three-phase is in the analysis now #

IEEE 1584-2018, the IEEE Guide for Performing Arc-Flash Hazard Calculations, models three-phase arcs in equipment at 208 V line-to-line and above, and the guide states plainly that sustainable arcs in three-phase systems at 240 V nominal or less are possible but less likely when the available short-circuit current is below 2,000 A. The working variable is therefore available fault current — set by transformer kVA and impedance, pulled down by conductor impedance — not voltage, which is a weak predictor of incident energy on its own; why voltage barely changes NFPA 70E incident energy walks through that arithmetic. The 2018 models also take the electrode configuration, the enclosure geometry and the working distance, so two panels fed from identical transformers can calculate differently when one clears through a slow upstream device and the other does not.

Checking a 208 V panel fed by a 125 kVA transformer against 2,000 A #

Inputs, each with its source:

  • Panel: 208Y/120 V, three-phase — the construction the question turns on.
  • Source: one dry-type transformer of the size the old exemption covered.
  • Nameplate impedance: 5.0% for this example; your transformer's nameplate governs.
  • Likelihood boundary: the available short-circuit current figure quoted from the guide above.

Rule in words: with an infinite primary source and the bolted fault at the secondary terminals, available three-phase fault current is approximately full-load secondary current divided by per-unit impedance.

Full-load current = 125,000 VA ÷ (√3 × 208 V) = 125,000 VA ÷ 360.3 V = 347 A.

Per-unit impedance = 5.0 ÷ 100 = 0.050.

Available fault current = 347 A ÷ 0.050 = 6,940 A at the transformer terminals.

Boundary check: holding 347 A × (100 ÷ %Z) below the boundary needs %Z above (347 ÷ 2,000) × 100 = 17.4%.

Result: 6,940 A at the terminals, more than three times the boundary, and any nameplate impedance below 17.4% leaves this panel above it. Decision: the "less likely" note does not apply, so this panel gets an incident-energy analysis run with IEEE 1584-2018 — this construction is in scope — and its results applied as arc-flash labelling under CSA Z462 or NFPA 70E. The 6,940 A is an upper-bound estimate (infinite source, no cable impedance, fault at the terminals); check it against the utility's short-circuit data, the governing code and the equipment documentation, and if the terminal value lands close to the boundary, redo the arithmetic at the panel with conductor impedance included. The transformer-side method is the infinite-bus one in calculating transformer interrupting current from impedance.

Single-phase 240 V panels sit outside the model #

The 2018 guide's equations come from three-phase tests; they do not apply to single-phase equipment, and the guide offers no method that produces an incident energy for such a panelboard. Annex Table V.1 of CSA Z462-21 lists it, but an entry in an annex table is a scope note, not test substantiation that a single-phase arcing fault at that voltage sustains. The defensible call for a 120/240 V panelboard: do not post an incident-energy or boundary label you cannot calculate; record in the risk assessment that the equipment is outside the calculation method's scope and why; apply the standard's shock requirements — voltage-rated gloves, insulated tools, barriers — at both line voltages; and open the panel only after the circuit is de-energized and verified absent of voltage. A site-wide minimum of arc-rated clothing in your program is a program rule you follow, not a calculated requirement for this panel.

The decision by case #

  • Three-phase panels at this voltage with available fault current at or above the guide's boundary: run the incident-energy analysis with IEEE 1584-2018 and label per CSA Z462 or NFPA 70E. The worked case above — the example transformer at 5.0% — gives 6,940 A and lands here.
  • Three-phase panels verified below that boundary at the equipment: sustained arcs are possible but less likely. Record the fault-current basis and the guide's note in the documented risk assessment; running the calculation anyway costs little and is the default when the panel sits on a system you already study.
  • Single-phase panels, including 120/240 V panelboards: outside the calculation method's scope. Document the limitation, apply the shock rules, work it de-energized, and leave the incident-energy field empty rather than invented.
  • Any panel still leaning on the old note: the note is not in the current editions. Redo the assessment.

Where the assessment has to cover a whole plant rather than one panel, start from scoping an outsourced arc flash study you can maintain in ETAP so the fault-current and electrode-configuration inputs stay maintainable as the study ages.

Questions asked

Is the 125 kVA transformer exemption still in NFPA 70E or CSA Z462?

No. The clause appeared in the 2008-era editions and rested on IEEE 1584-2002; it does not appear in NFPA 70E 2024 or in CSA Z462 2021 or 2024. Low-voltage panels go through the same documented arc-flash risk assessment as everything else, with the single-phase scope limitation recorded where it applies.

Can a 240 V single-phase panel sustain an arcing fault?

No calculation method answers that: IEEE 1584-2018 is built from three-phase tests and does not model single-phase equipment at that voltage, and the CSA Z462-21 annex listing for it is a scope note, not substantiation. Treat it as a limitation of the method, not proof the hazard is absent, which is why the practice is de-energize and verify.

Where does the available fault current for the 2,000 A check come from?

Divide the transformer's full-load secondary current by its per-unit nameplate impedance, assuming an infinite source with the fault at the terminals, or take the utility's short-circuit contribution at the service. The worked example turns that transformer size and impedance into 6,940 A at the secondary. Include conductor impedance when the margin to the boundary is close.

What PPE applies at a 120/240 V panelboard?

The shock rules do: voltage-rated gloves, insulated tools and barriers per the standard's shock-protection requirements at those voltages. Arc-rated clothing there is a program minimum, not a calculated value, because no method produces an incident energy for the panel. Keep the cover on until the circuit is verified de-energized.

Keep reading

  • Explainer

    Arc flash PPE for control circuit work in MV switchgear

    Classify by the equipment you open, not the voltage you touch: NFPA 70E's metal-clad switchgear rows put exposed control-circuit work at or below 120 V in HRC 2 and above it in HRC 4, and the panelboard rows do not transfer into MV gear. A 120 V ±5% PT secondary spans 114–126 V, so treat it as above the line until you measure otherwise.

    Electrical safety and codes

  • Explainer

    Why voltage barely changes NFPA 70E incident energy

    Incident energy is set by arcing current and clearing time, not the nominal voltage: an arc drops roughly 80–200 V of its own, so at 480 V it draws well under bolted-fault current and the clearing device sits in a slower part of its curve. The simplified equations in earlier NFPA 70E editions were stated valid 16–50 kA; below 16 kA use IEEE 1584-2018, stated for 500 A to 106 kA at 208–600 V.

    Electrical safety and codes

  • Explainer

    Handling generator fault-current decay in arc flash studies

    IEEE 1584-2018 calculates incident energy from a bolted RMS symmetrical current and models no decrement, so a decaying generator contribution cannot be entered directly. Split the event into intervals, recalculate the arcing current in each, and verify breaker pickup at the steady-state arcing current before using any result below the fixed-current value.

    Electrical safety and codes