Current IntelPower LibraryShop main store

Checklist

Loads that need a phase converter on a single-phase machine

Motors and motor starters Published 6 min read

Short answer

Only loads whose nameplate or schematic proves three-phase go on the phase converter; every load proven single-phase stays on the two hots. Trace the isolation transformer secondaries before removing it — a single-phase spindle-drive rating says nothing about the servo supply, the coolant pump or the motor cooling fan — and size the converter for the largest motor's starting surge, not its running current.

On this page
  1. What proves a load is three-phase
  2. Trace the isolation transformer before removing it
  3. The load-by-load checklist
  4. Worked example: a small CNC mill converted to single phase
  5. Where each load lands
  6. Questions asked

When a machine leaves a three-phase shop, the first question is not which converter to buy — it is which loads actually need one. The decision: only loads whose nameplate or machine schematic proves three-phase go on the phase converter; every load you can prove is single-phase stays on the two hots. Proving one load does not prove the machine. A schematic may mark the spindle drive input as single-phase, and that line says nothing about the servo power supply, the coolant pump or the spindle cooling fan. Do the whole audit dead: de-energize the machine, lock it out, and verify absence of voltage before any cover comes off. Work the checks load by load, trace the isolation transformer before disconnecting it, and only then buy conversion capacity for the proven three-phase list.

What proves a load is three-phase #

Three sources, in descending order of authority: the load's own nameplate, the machine schematic, and the input rating printed on the equipment.

Motor nameplates state voltage, phase, frequency and full-load current. Read the pump and fan motors' own plates — a motor swapped decades ago can differ from the machine datasheet. Spindle motor plates carry extra traps; the fields that matter are covered in reading a dual-voltage, dual-frequency spindle motor nameplate.

Electronic loads — spindle drives, servo amplifiers, DC supplies — prove themselves from the input rating on the label or the manual's input specification. A drive whose input section lists single-phase at your supply voltage stays on the hots. A drive listed three-phase only is fed from the converter or replaced; many drives instead publish a derated single-phase input, which is still a documented rating you can use.

When a plate is missing or painted over, the schematic's wire list decides, and counting the conductors at the load's disconnect corroborates it: three phase conductors plus a ground is a three-phase feed, two hots is single-phase. An unverified load stays on the converter plan, because a three-phase motor run from two hots single-phases, loses torque and overheats.

Trace the isolation transformer before removing it #

The common mistake on older machines is pulling the rear-cabinet isolation transformer because the spindle drive turned out single-phase. The transformer exists to give some subsystem a voltage or phase the incoming line does not provide, and on many machines that subsystem is the servo power supply.

With the machine locked out and proven dead, follow each secondary on the schematic and at the terminal strips to the loads it feeds, and write the list down: servo supply, control transformer, spindle drive, cooling fan. Keep the transformer in the circuit if any required load hangs on a secondary. Feed its primary from the two hots when every load on it is proven single-phase; feed it from the converter output only when its primary is rated three-phase and one of its loads needs the manufactured leg. Remove it only when the trace proves nothing required is left on it.

The load-by-load checklist #

Work down the list and record a proof for every line before anything is rewired:

  • Spindle drive input — read the input rating on the drive or schematic. Marked single-phase at the supply voltage: two hots. Three-phase only: converter output or drive replacement; some drives have no single-phase input path at all, which is the situation in why a DC spindle drive cannot run on single-phase power.
  • Spindle motor — record nameplate phase and full-load current even though the drive usually converts for it; the record is what overload settings and any future drive swap get checked against.
  • Servo power supply — trace its feed back to the source. Until the trace lands it on a proven single-phase secondary, plan on the converter.
  • Coolant pump — read the pump motor's own nameplate. Two machines of the same model family can differ after decades of motor swaps, so the proof is per machine and per motor.
  • Motor cooling fan — the load everyone misses. The spindle runs fine without it, so a wrong feed hides until the drive trips on spindle overtemperature; verify the fan's nameplate before calling the machine converted.
  • Control power — the control transformer and any 24 V DC supply normally take two hots. Keep them on the incoming single phase so the controls stay alive when the converter is off or tripped.
  • Hydraulic, lube and tool-changer motors — same rule as every motor: the nameplate decides.
  • Heaters, work lights, solenoids — single-phase loads by construction: two hots.

Worked example: a small CNC mill converted to single phase #

The inputs, each with its source: incoming supply 230 V, 1 PH, 60 Hz, two hots (the new shop); spindle drive input marked single-phase at the supply voltage (machine schematic); coolant pump proven single-phase (pump plate); servo supply traced to the rear-cabinet isolation transformer, whose primary is rated single-phase (transformer nameplate and trace), so the transformer stays on the hots; motor cooling fan nameplate 230 V, 3 PH, 0.9 A full-load current (fan plate) — the machine's only proven three-phase load. Baldor's guide to reading a NEMA motor nameplate puts across-the-line starting current at 300 to 600 percent of full-load running current.

The rule in words: the converter feed for the fan must carry its running current and its starting surge, and the surge is the nameplate full-load current times that starting factor.

The arithmetic: running apparent power is 1.732 × 230 V × 0.9 A = 358 VA, about 0.36 kVA. Starting current runs from 0.9 A × 3 = 2.7 A up to 0.9 A × 6 = 5.4 A, so the surge apparent power runs from 1.732 × 230 V × 2.7 A = 1076 VA up to 1.732 × 230 V × 5.4 A = 2151 VA — about 1.1 to 2.2 kVA. These are estimates; confirm them against the converter's own documentation.

The decision: the fan is the machine's only converter load. Select the converter so its continuous three-phase output covers the 0.36 kVA running load and its momentary output covers the 5.4 A end of the surge — a converter rated below that stalls on every fan start. Everything else lands on the two hots.

Where each load lands #

Proven single-phase loads go on the two hots, always. Converter output voltage sags and unbalances as the three-phase load on it changes, so a pump or heater fed from the manufactured leg sees voltage that moves with the spindle — and the idler draws current the whole time the converter spins, as laid out in why a rotary phase converter's idle current runs high. Hots-fed loads also keep working when the converter is switched off.

Proven three-phase loads go on the converter output, protected by the circuit's overcurrent devices and sized on the surge arithmetic above. If the audit proves exactly one three-phase motor, weigh a drive rated for single-phase input instead of a rotating converter: it ramps the start, so the feed never sees the full surge. That sizing is worked through in sizing a VFD for a three-phase motor on single-phase input.

For the installation itself, NFPA 70, the National Electrical Code, 2023 edition, dedicates Article 455 to phase converters: it covers converter rating, conductor sizing, overcurrent protection and the disconnecting means. Confirm the details with your local authority having jurisdiction and the machine's documentation. The final decision per load: converter output only for loads proven three-phase; two hots for loads proven single-phase; anything unproven waits for its nameplate or schematic line.

Questions asked

Does the 24 V control circuit need the phase converter?

Almost never. Control transformers and 24 V DC power supplies take two hots at their rated primary voltage, so they run straight from the incoming single phase. Verify the control transformer's primary taps match the single-phase voltage before energizing, because a transformer tapped for a higher three-phase line-to-line voltage runs the controls low. Keeping control power off the converter also means relay coils and the machine computer never see the converter's voltage unbalance.

Can a VFD replace the phase converter for a small machine?

When the audit proves exactly one three-phase load, yes. A VFD rated for single-phase input runs one three-phase motor at its own rated voltage and ramps the start, so the feed never carries the full across-the-line surge. The drive must be derated for single-phase input as its manual specifies, because a rectifier designed for three phases sees higher ripple current on one. One drive runs one motor; it cannot feed the rest of the machine.

How do you prove phase when the nameplate is gone?

Count the energized conductors at the load's disconnect and read the schematic's wire list. Three phase conductors plus a ground at the load mean a three-phase feed; two hots mean single-phase. Conductor counting is evidence, not proof: jumpers inside a terminal box or a potted motor can hide the real winding. Where the two disagree, the schematic wins, and the load stays on the converter plan until a nameplate or manual line settles it.

Can the isolation transformer primary be fed from the converter output?

Only when the nameplate shows a three-phase primary rating at the converter's output voltage. Set the connection diagram for that voltage first: a dual-voltage primary arrives jumpered for whichever combination the last installer chose, and a single-phase primary never goes on converter legs. Check the secondary voltage after reconnection, before any drive or amplifier is energized, because a rotary converter's manufactured leg sits below the line legs and the transformer passes that along.

Keep reading

  • Troubleshooting

    Why neutral-side switching trips a smart DOL starter

    Move the direction changeover contactor to the line side so the starter feeds the selected winding directly, and leave the run capacitor between the CW and CCW terminals: in the tested 110 V, 2.6 A circuit that raised successful starts from about 1 in 20 to 19 in 20. Return-side switching lets capacitor charging current through the unselected winding distort the current the starter measures at closure, so its residual-current diagnostic reports a missing path.

    Motors and motor starters

  • Troubleshooting

    Fixing a machine shutdown on a rotary phase converter third leg

    Move the machine's single-phase control supplies and interlock boards off the manufactured leg: they belong across the two utility legs, and only three-phase motor loads should see the generated leg. In one reported case a larger converter and a rewired 100 A service did not stop the trips until the legs were re-landed; balance the legs to the builder's tolerance, typically 5%, after that.

    Motors and motor starters

  • Explainer

    What a phase rotation tester tells you about motor direction

    A phase rotation tester fixes the order of the three supply phases at the points you connect, not the way a motor will turn. To predict direction before the first start, match that supply reading with a motor-rotation reading taken while the isolated shaft is turned in the required direction from a recorded viewing end, then land the leads in exactly that pairing. Any two conductors crossed anywhere downstream of the test point reverse the result.

    Motors and motor starters