On a three-phase submersible pump, seven conductors are three phase leads of an internally wye-connected winding, one protective earth, a two-wire thermal-sensor pair and one moisture-seal or ground-monitor lead. Identify them with a full resistance map against the pump's connection diagram, then connect each group to its own circuit — never from a single reading.

On this page
Seven unmarked conductors on a borrowed 400 V, three-phase, 5 hp submersible pump split into three phase leads of an internally wye-connected winding, one protective earth, a two-wire thermal-sensor pair and one moisture-seal or ground-monitor lead — unless the pump brings out six winding ends for delta starting plus earth, which the resistance map exposes immediately. Your readings already lean to the first case: three leads bunched at about 0.4 Ω behave like a wye winding group, not a delta set. A sub-ohm number and a yellow conductor with frame continuity still identify nothing on their own, so map every conductor pair and check the finished map against the pump's connection diagram before anything is energized. Below are the test setup, the reading patterns, the arithmetic for this pump and the decision for each case.
What the seven conductors are #
Submersible pump motors carry the same function groups in nearly every three-phase cable, though the conductor count varies by model. The service manual for one line of these motors documents a cable assembly with three marked power leads, two ground leads, two thermal leads and moisture-sensor leads. On a seven-wire three-phase pump, the groups split like this:
- Three phase leads: the only conductors that carry motor current.
- One protective earth, almost always green/yellow, bonded to the pump frame.
- Two thermal leads: a winding-temperature sensor pair — a PTC thermistor or a bimetal contact — that must reach a trip unit in the starter.
- One moisture or monitor lead: a seal-chamber probe, or the frame-bonded pilot for a ground-monitor relay in installations that use them.
The documented assemblies often carry two frame connections rather than one: protective earth plus the return that a monitor or sensor circuit uses. That is why you see continuity between the green/yellow conductor and the solid yellow one before you know which is which. The thermal pair is not optional equipment either: submersible motor installation guides expect the winding sensor wired through its trip unit and tell you to verify the three-phase overload is a NEMA Class 10 device — a motor sitting at the bottom of a well has no other winding-temperature protection.
Set up the test #
De-energize the pump feeder, lock the disconnect open and verify absence of voltage at the control-box terminals before you separate a single conductor; then measure at the free cable end with every conductor stripped back, separated and tagged. Identification never requires opening the sealed motor cavity, so leave it closed.
Set the meter for the readings you expect. For values under 10 Ω, a multimeter on its 20 Ω range or an ohmmeter on R × 1 is the right scale; step up one range for higher readings. Null the test leads first: lead and clip resistance of a few tenths of an ohm is the same size as the winding-group reading, so an unnulled meter measures the clips as much as the motor.
Map all twenty-one pairs #
Seven conductors give 7 × 6 ÷ 2 = 21 pairs. Measure and record every one.
- Tag each conductor at the cable end (1 through 7) and note which tag carries which color.
- Measure each conductor to the pump frame or housing first. Expect the green/yellow conductor near 0 Ω, possibly a second bonded conductor, and every other lead open to the frame.
- Measure conductor to conductor for all remaining pairs, on the lowest range that resolves each reading.
- Repeat any pair that reads to the frame or to another lead after the cable has dried at both ends — a damp cable face imitates a tripped sensor.
- Lay the finished map beside the pump's connection diagram or lead-identification sheet before anything is connected.
What each reading pattern means #
| Map pattern | Function | What confirms it |
|---|---|---|
| Three leads mutually continuous with near-equal sub-ohm readings | Internally wye-connected winding; the pair reading equals two per-phase resistances in series | All three pair readings equal within the meter's resolution |
| Green/yellow conductor near 0 Ω to the frame | Protective earth | A visible bond at the frame termination |
| Second conductor with frame continuity that survives drying | Ground-monitor pilot, bonded at a separate frame point | The pump's documentation, never the map alone |
| Pair reading on the order of 150–160 Ω | Cold PTC thermistor sensor pair | Value stable, with no continuity to the frame |
| Pair reading around 0.1 Ω and open to the frame | Bimetal thermal-contact pair | Near-short that stays stable |
| One lead open to everything on a dry cable | Moisture-seal probe | Steady frame continuity on a wet cable means a tripped or damp probe |
| Three isolated pairs, each near-equal, with open circuit between pairs | Six winding ends for delta starting, plus earth | The delta case below |
The sensor values are expected orders of magnitude for these pumps, not acceptance limits; the pump's own documentation lists what its sensors should read.
Worked example: the borrowed pump's map #
For the 5 hp, 400 V pump, a map that fits the pattern reads:
- Winding group: 0.4 Ω between each pair of the three phase leads after nulling. An internally wye-connected winding puts two per-phase resistances in each line-to-line path, so the per-phase value is 0.4 Ω ÷ 2 = 0.2 Ω. It is the equality across all three pairs that identifies the group; the absolute number only has to be small and repeatable.
- Plausibility check: 5 hp is 5 × 746 = 3730 W of shaft output. Expected line current I = P ÷ (√3 × U × cos φ × η) = 3730 W ÷ (1.732 × 400 V × 0.85 × 0.85) = 3730 W ÷ 500.5 ≈ 7.5 A, taking efficiency and power factor as example inputs of 0.85 each in the standard three-phase power relation. That result is an estimate for cross-checking; the nameplate's own full-load current governs the overload setting.
- Thermal pair: 152 Ω between two conductors, isolated from the frame — inside the thermistor band from the table. A near-short pair instead would mean bimetal contacts. Either way the pair terminates at its trip unit, never in the power circuit.
- Moisture lead: open to every conductor and to the frame on the dry cable. Any steady frame reading means the seal-chamber probe is wet or the cable face is damp; dry, re-test, and only then judge the seal.
- Earth and monitor: green/yellow near 0 Ω to the frame; solid yellow continuous to the frame through a separate bonding point, which is why it reads through to the earth conductor. That conductor stays on its own terminal until the pump's diagram says what it feeds.
When the map shows three separate pairs #
A seven-wire cable can also be six winding ends for star-delta duty plus protective earth. The map looks different: three isolated pairs, each pair reading the same resistance, with open circuit between pairs — you never find one mutually connected group of three. The borrowed pump's group of three rules that arrangement out here, but check for it on any pump whose map is less clear, because a delta-start submersible connected as a plain wye burns its winding. For a pump that does bring out six ends, identification works pair by pair, as the page on identifying submersible motor leads for a delta start walks through.
The decision for each case #
- Map matches the standard pattern: land the three phase leads on the contactor per the pump diagram, and check rotation before the first start, because what a phase rotation tester tells you about motor direction decides whether the pump spins the right way — reverse rotation can back off threaded shaft connections on many submersibles. Land the thermal pair through its trip unit, verify the three-phase overload is a NEMA Class 10 device, and set it from the nameplate's full-load current as setting overload relays from motor nameplate full-load current details. Terminate the moisture lead at its relay if a seal-failure unit is fitted; if none is, insulate and tag the lead clear of the frame. The monitor pilot, if documented, gets its own terminal — never paralleled into the earth conductor.
- Map shows three isolated pairs: it is a star-delta machine. Identify the pairs, follow the pump's diagram, and connect it to the star-delta starter it was built for.
- Map fits neither pattern: stop before energizing. An unmatchable map usually means an unidentified auxiliary, a still-damp sensor, an internal winding fault or protection wiring left open in a terminal box. Take the nameplate model to the pump manufacturer for connection data; trial-energizing an unidentified cable is how windings and trip units die.
If the moisture lead showed frame continuity or the pump last tripped on earth fault, test the phase leads to the frame with an insulation-resistance tester before reconnecting, and interpret the readings with our walkthrough on reading motor lead-to-ground ohms. Requirements differ by country and edition; confirm the installation details with the local authority having jurisdiction and the pump's documentation.
Questions asked
What should the moisture lead read on a healthy, dry pump?
Open circuit to every other conductor and to the frame. Most seal-chamber probes are single leads that return through the pump frame, which is exactly why the probe lead must never serve as a second earth. A steady reading to the frame on a dry cable means water has reached the probe in the seal chamber, and the pump comes out for seal work rather than a reset.
Can I run the pump before the thermal leads are connected to a trip unit?
Only for a short fault-finding run, and only with the sensor pair insulated and taped so the leads cannot touch each other or the frame. The pump will turn, but the winding sensor is the only device watching stator temperature on a motor nobody can reach, and installation guides treat the trip unit as part of the pump. Fit the trip unit before the pump returns to service.
How do I separate a ground-monitor conductor from a damp moisture sensor?
Dry both cable ends, separate every conductor from the frame and re-measure. A monitor pilot is bonded to the frame by design and keeps its continuity wet or dry; a moisture probe returns to open circuit once the cable and probe are dry. If the frame reading survives drying, take the nameplate model to the pump manufacturer for connection data before terminating anything.
Why not open the motor and look at the connections instead?
The windings sit in an oil or water fill behind sealed cable penetrations, and opening the housing can lose the fill and ruin the shaft seal for no gain, because everything the resistance map needs is at the cable end. Where the motor provides a terminal box, that is the only place to inspect terminations; the sealed cavity stays closed.