Explainer
Why motor models mislead transformer inrush on islanded generators
Short answer
A motor model set to twelve times rated current is a screening flag, not an energization prediction. Transformer inrush is set by core saturation, residual flux and closing instant against the generators' subtransient reactance, so the minimum generator count on an islanded bus must come from a transient study built on the manufacturer's energization data, never from the load-flow substitution.

On this page
Twelve times rated current in a motor model is a screening flag, not an energization prediction. If your load-flow package has no transformer model, substituting a same-rating motor that draws 12,600 A on the 11 kV side will produce a dip — the 33% with three 8 MVA generators online in this lineup — but that figure is an artifact of a motor model's voltage-dependent current draw, not transformer physics. Inrush is set by core saturation, residual flux and the closing instant, working against the generators' subtransient reactance and excitation response. Use the substitution result only to justify commissioning a transient study on manufacturer data; it must never approve a generator count or a protection setting.
What the motor model is actually computing #
A dynamic motor model draws a balanced, three-phase current that follows the applied voltage: as the bus sags, the model draws less, the way a real motor does. That behavior produces a bounded dip such as the 33% the substitution reports, and it looks plausible in a load-flow tool.
A saturating transformer does none of this. The magnetizing current is unipolar, rich in harmonics, strongly dependent on the closing angle and residual flux, and it persists for many cycles while the core flux decays. The two events share only a large current magnitude. Everything that decides the real current — flux, saturation, residual magnetism, source impedance, excitation response — is absent from the motor surrogate, so its dip number carries no predictive weight. At best it says the assumed demand is large compared with the source, which is a reason to study the event properly, not a result to quote.
The impedance check you can run by hand #
Take the lineup as stated: a 20 MVA, 33/11 kV transformer energized from its medium-voltage winding, and 8 MVA generators on the same bus. The only input the lineup does not give you is the generator subtransient reactance, so the 20% used below is an example — take the real value from each machine's datasheet.
- Transformer rated current on the 11 kV side: I = 20,000,000 VA ÷ (√3 × 11,000 V) = 20,000,000 ÷ 19,053 ≈ 1,050 A.
- The substitution's demand at twelve times rated current: 12 × 1,050 ≈ 12,600 A.
- Generator base impedance on the machine's own 8 MVA base: Z = 11,000 V × 11,000 V ÷ 8,000,000 VA = 15.125 Ω. At the example 20% subtransient reactance, X = 0.20 × 15.125 = 3.03 Ω per machine.
- Three machines in parallel: 3.03 Ω ÷ 3 = 1.01 Ω.
- Current the source can drive at rated bus voltage: I = 11,000 V ÷ (√3 × 1.01 Ω) ≈ 6,300 A.
That is only 6.0 times the transformer's rated current — half the demand the substitution assumes. The assumed current cannot exist behind this source at any bus voltage, so the reported dip cannot be reproduced from the actual physics; the tool lands on it only because its motor model throttles its own current as the voltage collapses. The sensitivity also cuts the other way: at a 10% machine, three units can just deliver the full 12,600 A. The datasheet reactance, not the tool's default behavior, decides which world you are in — and the substitution gives you neither.
What actually sets transformer inrush #
The core flux must follow the integral of the applied voltage from the instant the breaker closes. Closing near a voltage peak, with residual flux from the previous de-energization still in the core, pushes total flux past the saturation knee; the winding then draws a large asymmetric current pulse for tens of cycles until the DC flux component decays. That is why inrush multiples and duration vary from one switching event to the next on the same transformer.
Relay-manufacturer technical literature documents the consequence for protection: SEL Inc's paper on low second-harmonic content shows that deep saturation, sometimes called ultrasaturation, can suppress the second harmonic that many transformer differential relays use to distinguish inrush from a fault, so a severe energization can present itself to the differential element as something closer to an internal fault. A motor-start surrogate reproduces none of this waveform behavior, which is why the companion article on estimating transformer inrush current for protection coordination sizes the event from inrush multiples and source strength on a defined source rather than from a substituted model.
Controlled point-on-wave closing reduces the magnitude when the transformer maker's residual-flux data supports the chosen closing target; the article on point-on-wave closing for transformer inrush reduction covers how the closing instant does that. It mitigates one event; it does not tell you how many generators must be online.
Why an islanded generator bus changes the answer #
On a utility-strength source the bus holds nearly rated voltage through the inrush, and the current is close to what the transformer data predicts. Behind three or four 8 MVA diesel sets, the subtransient reactance dominates the first cycles and sets the dip depth; after that, the excitation system and voltage regulator decide how fast the bus recovers. Published studies of 1.5 MVA and 3.75 MVA transformers energized from diesel-engine generator sets show both the magnitude and the duration of the sag depend on the source impedance and the machine's control response, not on the transformer rating alone.
That gives the second failure mode of the substitution: a motor model has no excitation dynamics, so the recovery it shows is fictitious. A steady-state load-flow run resolves neither the energization waveform nor the recovery. If you need the source impedance behind the bus as an input, the article on calculating source impedance from prospective short-circuit current shows the conversion from a fault-duty figure.
Data to collect before you commission the study #
- From the transformer maker: excitation and energization data valid for the winding you will switch, plus the connection, grounding and any residual-flux assumption the maker supports. Ask for it explicitly rather than substituting a generic multiple.
- From each generator datasheet: subtransient and transient reactances and time constants.
- From the generator maker: excitation-system and voltage-regulator models for the units that will be online.
- From the plant records: the exact lineup, cable and bus impedance from each machine to the main bus, the load that stays connected during the switch, and the acceptance criterion — the dip and duration the connected contactors, drives and instruments can ride through.
If the study package lacks transformer and machine dynamics, send this data set to a power-system study provider instead of promoting the screening result into an operating limit. A generator RMS dynamic model covers the slower voltage recovery and control response; an electromagnetic-transient model is what resolves the energization waveform itself, and it matters when the switching instant or residual flux is part of the decision.
Field-assisted energization as an engineered option #
Energizing the transformer while a generator's field is being built up is an established practice on unit transformers of large generating sets, and it can shrink the disturbance substantially. It also changes the voltage and sequence conditions during energization, so it must be evaluated case by case by the generator and transformer makers or the responsible power-system engineer, together with the protection behavior and the operating limits. If it is approved, write a controlled switching sequence that fixes the lineup, the breaker actions, the field and excitation steps and the abort criteria. It is a designed procedure, never an improvised way to trim the lineup on the day of the switch.
The decision #
Keep the twelve-times motor-model substitution as a screening flag only, with its assumptions written down, and reject it as the basis for approving a generator count or setting protection. For this lineup the hand check is decisive about the method: behind three 8 MVA machines at the example 20% subtransient reactance, the source can deliver about 6,300 A — half of what the substitution demands — so the 33% dip cannot be defended as a prediction of the real event in either direction. Commission a transient study on the manufacturer's energization data with the real generator reactances and regulator models; the study's voltage profile, judged against the ride-through limits of the loads that stay connected, sets the minimum number of machines online.
One safety boundary belongs here: any panel or breaker work before the switch follows the plant's de-energize-and-verify rules, and the first energization itself is run as an approved operating procedure with named observers, a bus-voltage trend record and an abort criterion — never as a trial to see what happens.
Questions asked
Can the twelve-times motor-model result be used for anything?
Yes, as a screening flag. It tells you the assumed demand is large compared with the source strength, which justifies commissioning a proper transient study before any switching attempt. Document the substitution and its assumptions, keep the result out of operating instructions and protection settings, and never present it as proof that a given generator lineup can or cannot energize the transformer.
Which generator data does the energization study need?
From each machine's datasheet: subtransient and transient reactances and time constants. From the generator maker: the excitation-system and voltage-regulator models and the governor behavior for the diesel sets. From the plant records: the exact lineup online, cable and bus impedance to the 11 kV bus, and the connected load. The transformer side needs the maker's energization data for the winding being switched and any supported residual-flux assumption.
Why does deep core saturation matter for transformer differential relays?
Many relays use second-harmonic content to distinguish inrush from a fault, and relay-maker technical literature shows that deep saturation, sometimes called ultrasaturation, can drive that harmonic very low. A severe energization can then look closer to an internal fault to a percentage-restraint differential element. Confirm how your relay's inrush restraint behaves under deep saturation before the switching attempt.
Is energizing the transformer as the generator field builds up a valid shortcut?
It is an established practice on unit transformers of large generating sets and can shrink the disturbance, but it changes the voltage and sequence conditions during energization. Have the generator and transformer makers or the responsible power-system engineer evaluate the procedure and protection behavior, then run it as a controlled switching sequence with defined breaker and field steps and abort criteria.
Does point-on-wave closing remove the need for the study?
No. Controlled closing reduces the inrush magnitude when the transformer maker's residual-flux data supports the chosen closing target, but the generator-count question still needs the study: the analysis has to show the voltage dip, the recovery under the excitation system, and the protection behavior for the chosen lineup. Use controlled closing as a mitigation inside an approved switching procedure.