Estimating voltage sag from motor inrush current
Short answer
Do not divide the motor's asymmetrical first-cycle peak by √2; screen the dip with RMS locked-rotor current as dip % = transformer Z% × I_start ÷ I_rated. On a 750 kVA, 480 V, 6% transformer, a 50 HP motor at 395 A locked-rotor dips the bus about 2.6%, to roughly 467 V — start it across the line.
On this page
Screen the dip with RMS locked-rotor current, never with a first-cycle peak. The screening formula is dip % = transformer Z% × I_start ÷ I_rated, and on a bus whose impedance is dominated by one transformer it lands within a few tenths of a percent of a full phasor calculation. For a 750 kVA, 480 V secondary with 6% impedance feeding a 50 HP motor at 395 A locked-rotor, the dip is 2.6% and the bus sits near 467 V: start it across the line. The tempting shortcut of dividing a 600 A asymmetrical peak by √2 to get RMS is not a valid conversion, and you do not need it — the nameplate carries the right current.
Why the first-cycle peak cannot be divided by √2 #
Peak equals √2 × RMS only for a pure sine wave. The first half-cycle of an across-the-line start, like the first cycle of a short circuit, carries DC offset set by the instant the contactor closes, so the wave is not sinusoidal. Dividing its peak by √2 returns neither the AC component nor the total RMS; it is the same distinction that separates asymmetrical versus symmetrical RMS fault current in switchgear ratings.
You can bound the peak, though. In a linear circuit the DC offset cannot exceed the AC peak, so the AC RMS that actually pulls the bus down is at most 600 ÷ 1.414 = 424 A, and less while offset is present. The DC component itself develops almost no voltage across a reactance-dominated transformer impedance. A dip computed from 424 A is therefore a mild overstatement — usable as a ceiling, wrong as a method.
The screening formula and what it assumes #
Dip % = Z% × I_start ÷ I_rated, where I_rated = (kVA × 1000) ÷ (√3 × V_secondary), the transformer's own full-load current at its secondary line-to-line voltage.
The reason magnitudes subtract directly: at the 0.1 to 0.3 power factor typical of a locked rotor, current lags the bus voltage by roughly 72° to 84°, so the drop across the transformer's reactance lands nearly in phase with that voltage. A phasor solution built on the same typical data moves the answer by a few tenths of a point. The formula assumes:
- The transformer is the whole source: no utility impedance and no cable between the secondary bus and the motor.
- The nameplate percent impedance, a magnitude from the short-circuit test, can stand in for the reactance.
- I_start is the symmetrical RMS locked-rotor current at full voltage, for the starting method actually used.
One ceiling is built in: the dip cannot reach the transformer's Z% unless the starting current exceeds the transformer's rated secondary current.
The screening procedure, step by step #
- Transformer data. From the nameplate or test report, record kVA, secondary line-to-line voltage and percent impedance. Note whether the figure is impedance magnitude (the usual nameplate value) or reactance; the test report gives R and X separately.
- Rated secondary current. I_rated = (kVA × 1000) ÷ (√3 × V_LL).
- Starting current. Take the nameplate LRA or the manufacturer's data sheet first. Otherwise use the locked-rotor code letter, required on nameplates by NFPA 70, the National Electrical Code, 2023 edition, at 430.7(B): locked-rotor kVA = band value in kVA/HP × HP, then LRA = (locked-rotor kVA × 1000) ÷ (√3 × nameplate volts). Confirm nameplate data with the motor documentation and your authority having jurisdiction. Reduced-voltage starting lowers the locked current roughly in proportion to the voltage applied.
- Dip. Dip % = Z% × I_start ÷ I_rated.
- Volts. V_start = V_secondary × (1 − dip ÷ 100). This is the secondary bus, not the motor terminals.
- Judge. Hold motor-terminal voltage above roughly 80% of nameplate through the acceleration — the usual acceptance line for a starting study; NEMA MG-1 design B machines are built to accelerate their load at 90% of rated voltage, so 80% leaves room for feeder drop and hard-starting loads. Contactor coils and control power supplies ride through far deeper dips than a 2–3% transformer sag.
- Escalate when close. Near the limit, add the cable and utility impedances — the full source-impedance method is walked through in motor starting voltage dip calculation on an 11 kV bus — or cut the starting current, or buy more kVA.
- Verify. Confirm with a first-cycle measurement at startup (last section).
Worked example: 50 HP motor on a 750 kVA transformer #
A hypothetical screening with every input stated: three-phase, 60 Hz, transformer 750 kVA, 480Y/277 V secondary, 6% nameplate impedance; motor 50 HP, 460 V, 60 A full-load current, assumed nameplate code letter G (5.6 to 6.29 kVA per HP); across-the-line start; an assumed 600 A first-half-cycle asymmetrical peak in the field notes.
- Rated secondary current: 750,000 ÷ (1.732 × 480) = 750,000 ÷ 831.4 = 902 A.
- Locked-rotor kVA from the code band: 50 × 5.6 = 280 kVA at the bottom, 50 × 6.29 = 314.5 kVA at the top.
- Locked-rotor current: 280,000 ÷ (1.732 × 460) = 352 A to 314,500 ÷ 796.7 = 395 A. Screen with the top, 395 A.
- Dip: 6 × 395 ÷ 902 = 2.63%.
- Bus voltage during the start: 480 × (1 − 0.0263) = 467 V.
| Quantity | Screening result |
|---|---|
| Rated secondary current | 902 A |
| Locked-rotor current, code G band | 352 A to 395 A |
| Dip at the 480 V bus | 2.6% (2.8% from the 424 A peak ceiling) |
| Bus voltage during the start | ≈467 V |
| Running-current dip, for contrast | 0.40% |
The peak route gives 6 × 424 ÷ 902 = 2.8% and 466 V: the same verdict reached the wrong way. This is a screening estimate — check it against the actual nameplates, the governing code and a measurement.
The decision for this case #
Start it across the line: no soft starter, no transformer change. The bus sits at 467 V, above the motor's 460 V nameplate, and locked torque varies with voltage squared, so the motor enters acceleration at about (467 ÷ 460)² = 1.03 times its nameplate locked torque before the feeder takes its small share. Coils, DC supplies and neighboring motors do not register a 2.6% step that lasts the seconds of a start.
What moves the number: dip scales linearly with impedance percent and starting current, and inversely with transformer kVA. Halve the source to 375 kVA at 6% and the same motor dips it 5.3%; a 300 kVA unit takes 6.6% and still accelerates the machine. The screen starts to matter near 10% at a shared bus — there, reduce the starting current with a soft starter or a drive (where a utility kVA limit governs the start, converting a 350 kVA soft start limit to starting current shows that arithmetic) or feed the motor from more transformer. Choosing kVA for a known motor is the reverse problem, covered in sizing a transformer for a 200 HP across-the-line motor start.
What the screening leaves out #
Cable impedance from the secondary to the motor terminals: add it for a long run, because the terminals sit a few percent below the bus. Utility source impedance upstream of the transformer: usually small next to a 6% unit, but it belongs in the complete model. Timing: the calculated value is the worst instant, the first moments of the start — current falls toward running current as the motor accelerates, and the dip lasts the acceleration time. Simultaneous starts: two motors started together sum their locked-rotor currents in the same formula. And when a dip grows deep enough to matter, it shows up as AC contactor chatter on motor start or a control-power reset before anything else complains.
Verifying the dip on startup #
NFPA 70E, 2024 edition, which sets electrical safety-related work practices, treats work on energized 480 V terminals as live work: de-energize, lock out and test for absence of voltage before connecting anything, and confirm the procedure with your site safety program and the instrument manual. With a power-quality recorder or a relay that captures the first cycle connected under lockout, re-energize, then log secondary bus voltage and motor current through a real start. Agreement within a percent or two of the 467 V estimate validates the screen; a larger gap points at the impedance model or the assumed starting current, and that is what to fix before spending on mitigation.
Questions asked
Why is dividing the asymmetrical peak by √2 wrong?
Peak is √2 times RMS only for a pure sine wave. A first-half-cycle inrush includes DC offset from the closing instant, so the wave is not sinusoidal and the division returns neither the AC nor the total RMS value. The sag is driven by the AC component into a reactance-dominated impedance, so the 424 A figure is a loose ceiling only. Use the locked-rotor RMS current from the nameplate or its code letter.
What dip size should I call a problem?
Hold motor-terminal voltage above roughly 80% of nameplate through acceleration; NEMA MG-1 design B machines are built to accelerate at 90%, so 80% leaves margin for feeder drop and heavy loads. Contactor coils and control power supplies ride through much deeper dips for the few seconds a start takes, so a 2–3% dip never reaches them. Treat anything approaching 10% at a shared bus as the trigger to reduce starting current or add kVA.
Does the 60 A running current tell me anything about starting?
Not the starting current. Locked-rotor amps come from motor design and appear on the nameplate as an LRA figure or a NEMA code letter in kVA per horsepower; the 50 HP example spans 352 to 395 A, which is 5.9 to 6.6 times its 60 A full-load current. Running current only sets the transformer's steady loading and the running dip, 0.4% in that case.
Should the 6% be used as impedance or reactance?
A nameplate percent impedance is a magnitude from the short-circuit test; reactance alone is slightly smaller. In the screening formula the difference shifts the answer a fraction of a point, so use the nameplate value as it stands. A phasor study, or a check against a specified reactance, needs R and X split out of the transformer test report.
How do I verify the calculated dip at startup?
Log the secondary bus voltage and the motor current together with a power-quality recorder or relay that captures the first cycle; meters updating a few times per second will miss the event. Connect the instrument with the circuit de-energized, locked out and verified dead, then re-energize and start. Agreement within a percent or two of the screen confirms it.