Current IntelPower LibraryShop main store

Selection guide

Sizing a transformer for a 200 HP across-the-line motor start

Power distribution and transformers Published 8 min read

Short answer

Select a 1000 kVA transformer with nameplate impedance of 6.5% or less. The 3 kVA-per-HP rule gives 600 kVA for the 200 HP pump alone; adding 390.9 kVA of always-on load gives 990.9 kVA, so that is the screening size. The dip screen confirms it: 8.8% sag at 5.75% impedance, inside the 10% target, while 750 kVA would need 4.9% impedance to pass.

On this page
  1. Convert every load to kVA before comparing anything
  2. Check the 1380 A against the motor nameplate
  3. Screening rules, and what each one assumes
  4. The voltage-dip screen that settles the size
  5. What an 8.8% dip does to the loads that stay on
  6. Two inrush events, not one
  7. Confirm the selection on the running plant
  8. The decision
  9. Questions asked

Select 1000 kVA, with the nameplate impedance held to 6.5% or less. The start sizes this transformer, not the running load: a 200 HP pump throws 1380 A of locked-rotor current onto a bus already carrying 390.9 kVA of always-on load, six times a day, with no reduced-voltage option. The 3 kVA-per-HP rule for full-voltage starting gives 600 kVA for the pump alone; add the standing load for 990.9 kVA and the next standard rating is the answer. The dip screen confirms the choice — an 8.8% sag at 5.75% impedance, inside the 10% screening target — while a 750 kVA unit would need 4.9% impedance to pass.

Convert every load to kVA before comparing anything #

Use S = √3 × V × I / 1000, with V the line-to-line voltage in volts and I the line current in amps, and state the voltage basis beside every result. The 470.18 A standing load was calculated at 480 V system voltage; the 1380 A inrush belongs to a 460 V motor nameplate, so both bases are carried here.

Quantity Calculation Result
Standing load, 480 V basis √3 × 480 × 470.18 / 1000 390.9 kVA
Standing load, 460 V basis √3 × 460 × 470.18 / 1000 374.6 kVA
Pump locked-rotor kVA, 460 V basis √3 × 460 × 1380 / 1000 1099.5 kVA
Pump locked-rotor kVA, 480 V basis √3 × 480 × 1380 / 1000 1147.3 kVA
Pump running kVA at nameplate FLA √3 × 460 × 240 / 1000 191.2 kVA
Steady total with pump running 390.9 + 191.2 582.1 kVA
Through-kVA during a start, screening sum 1147.3 + 390.9 1538.2 kVA

The 240 A running current is the Table 430.250 value for a 200 HP three-phase motor at 460 V, from NFPA 70, the National Electrical Code, 2023 edition; substitute the nameplate FLA if it differs. Behind the standing figure sit four single-phase 59.8 kVA rectifiers, 72 kW of heaters and 40 HP of motors, whose raw nameplate sum is about 341 kVA — the 390.9 kVA worst-phase number already carries margin for imbalance and power factor.

Two conclusions come off that table. With the pump running, the plant draws 582 kVA, 58% of the selected rating, so steady-state heating is not the constraint. And the 1538.2 kVA through-figure is an arithmetic sum of two loads at different power-factor angles: a deliberately conservative screening number, not a thermal duty, and six short starts a day add little winding heating on top of it.

Check the 1380 A against the motor nameplate #

1380 A is 5.75 times the 240 A full-load current. In locked-rotor terms, 1099.5 kVA spread over 200 HP is 5.5 kVA per HP — inside code letter G, which spans 5.0–5.6 kVA/HP in Table 430.7(B) of the same edition. The inrush figure is therefore consistent with an ordinary code-G machine at 460 V. Read the code letter off the pump nameplate before you order the transformer, because it moves the answer directly: a code-L motor, 9.0–10.0 kVA/HP, draws 2259–2510 A at 460 V, 64% to 82% more starting kVA, and the dip deepens in the same proportion at every transformer size.

Screening rules, and what each one assumes #

Sizing approach Basis Result for this plant Where it stops
3 kVA per motor HP Field rule for full-voltage starting on a dedicated transformer 3 × 200 = 600 kVA; plus 390.9 standing = 990.9 kVA, next standard rating Ignores impedance, source stiffness and load ride-through
120–150% of motor kVA Motor alone on the transformer, 15–20% dip tolerable 229–287 kVA A dip that deep drops contactor coils and trips the rectifiers left on this bus
1 kVA per motor HP Running-duty screen 200 + 390.9 ≈ 591 kVA Says nothing about the start
Motor-starting study (SKM, ETAP) Nameplate %Z, source impedance, locked-rotor data, standing-load model Terminal voltage and torque margin through the start Needs every datasheet in hand

The first row is the screening answer. The second row is why the 750 kVA first estimate fails this job — rules that size to motor kVA alone assume nothing sensitive shares the bus during the start, and here the rectifiers, heaters and smaller motors ride through all six. The last row is what you commission if any number lands within a few percent of a limit.

The voltage-dip screen that settles the size #

Screen with ΔV% ≈ %Z × (S_through / S_tx), where S_through is the through-kVA during the start and S_tx the transformer rating, both in kVA. S_through is 1538.2 kVA from the load table. %Z is the nameplate impedance of the unit you are quoted — the one input not fixed until you pick it, and the one the dip scales with directly: every 1% of impedance adds 1.54 points of dip at this load on the selected base.

Worked example, every input stated: 1000 kVA transformer, 480 V secondary, 5.75% impedance (an example value; read your actual nameplate), through-kVA 1538.2.

ΔV% ≈ 5.75 × 1.538 = 8.8%

Transformer rating S_through / S_tx Dip at 5.75% impedance Impedance that meets a 10% dip
750 kVA 2.05 11.8% 4.9%
1000 kVA 1.54 8.8% 6.5%
1250 kVA 1.23 7.1% 8.1%

The 10% figure is a screening target common on industrial projects, not a code limit; the limits that bind are the ride-through specifications of what stays on — starter coil dropout voltage, rectifier undervoltage trips, and motor torque, which falls with the square of voltage. At 8.8% dip the pump sees 91.2% voltage and about 83% of locked-rotor torque, enough to accelerate a centrifugal pump.

The linear screen runs about a point above the exact divider form, ΔV% = 100 × S / (S + S_sc) with S_sc = 100 × S_tx / %Z the transformer short-circuit kVA: 17,391 kVA here, giving 8.1%. It also leaves out the upstream source impedance, which drops voltage of its own; the divider method with the source included is carried through for another bus in motor starting voltage dip calculation on an 11 kV bus. These screens are estimates — hold the final choice against the code as applied by the authority having jurisdiction and the equipment documentation, and commission a study whenever a number sits close to a limit.

What an 8.8% dip does to the loads that stay on #

  • Four single-phase rectifiers cannot balance across three phases; the best split is 2-1-1. Confirm the 470.18 A figure is the worst phase under that split, and check their harmonic current against the transformer's rating basis, such as a k-factor or derating note on the nameplate or quote.
  • The 72 kW of heater load follows the same square law as motor torque: 91.2% voltage is 83% heat for the seconds of the start. Six interruptions a day are harmless unless the process is temperature-critical.
  • Starter coils on the smaller motors must hold above their dropout voltage at 91.2% bus voltage; read the dropout range from the starter documentation rather than assuming it.
  • Set the secondary tap so the bus runs near nominal under the standing load, so each start dips from the correct voltage instead of from a chronic low condition.

Two inrush events, not one #

Energizing the transformer draws magnetizing inrush: a fraction of a second, rich in DC offset, and capable of peaking well above the 1380 A motor start. It is a coordination problem for the primary device, not a voltage-dip problem for the loads. Article 450 of NFPA 70, 2023 edition, governs transformer overcurrent protection, and the primary fuse or breaker has to ride over the magnetizing event while still clearing secondary faults; estimating transformer inrush current for protection coordination covers that arithmetic. Confirm the protection arrangement with the authority having jurisdiction and the transformer documentation.

Confirm the selection on the running plant #

  1. Collect the nameplate set first: transformer kVA and %Z, motor code letter and FLA, rectifier undervoltage trip points, starter coil dropout range.
  2. Before opening any cabinet or MCC bucket for metering, open the upstream disconnect, lock it out, and test for absence of voltage at the point of work; NFPA 70E, 2024 edition, covers the work practices and protective equipment for what follows.
  3. Fit a power-quality meter using IEC 61000-4-30 Class A methods at the transformer secondary, set for per-cycle RMS capture, and log the standing load: kVA near the table value, voltage near nominal on the chosen tap.
  4. Capture one pump start: minimum RMS secondary voltage and peak current. Gate: the peak matches the locked-rotor current for the nameplate code letter, and the minimum voltage clears every ride-through limit collected in step 1.
  5. Run the pump and read the steady secondary kVA. Gate: below the transformer rating, with stable winding-temperature indication.
  6. After a day of six starts, check the rectifier and starter event logs for undervoltage entries — there should be none.

The decision #

  • Select 1000 kVA with the nameplate impedance specified at 6.5% or less. It sags 8.8% through the start at 5.75% impedance and carries the 582 kVA steady total with margin.
  • Reject the 750 kVA estimate. At 5.75% impedance it drops the bus 11.8% — 88.2% voltage and 78% starting torque — and it meets the 10% screen only below 4.9% impedance.
  • Take 1250 kVA only if the quoted unit carries impedance above 6.5%, or a study shows the upstream source is too soft to hold the bus.
  • Commission the motor-starting study whenever a gate lands within a few percent of its limit. If a reduced-voltage start ever comes back into scope — converting a 350 kVA soft start limit to starting current shows how the start kVA falls — the through-kVA drops far enough to put 750 kVA back inside the dip screen.

Questions asked

Do the six starts a day force a larger transformer on thermal grounds?

No. Each start loads the unit to about 154% of rating for the few seconds the motor takes to accelerate, six times a day; winding heating over a day is set by the 582 kVA running load, which is 58% of the transformer's rating. The start sizes the transformer through voltage dip, not temperature, so the dip calculation is the number to defend.

What if the quoted transformer has impedance above 6.5%?

Move to 1250 kVA or order a lower-impedance design. At this through-load, each 1% of impedance adds 1.54 points of dip at the selected size but only 1.23 points on a 1250 kVA base. A 1250 kVA unit at 5.75% impedance sags 7.1% and meets the 10% screen up to 8.1% impedance. You are buying impedance as much as kVA.

Is the 3 kVA per HP rule a code requirement?

No, it is a field rule of thumb for full-voltage starting on a dedicated transformer. NFPA 70, the National Electrical Code, 2023 edition, sizes motor conductors and branch-circuit protection in Article 430 and transformer overcurrent protection in Article 450, but it does not fix a transformer kVA for starting duty. The defensible basis is the voltage-dip calculation against the ride-through limits of the connected equipment, confirmed with the authority having jurisdiction.

Does the transformer's own energizing inrush matter?

Yes, as a separate coordination check. Magnetizing inrush when the transformer is energized lasts a fraction of a second and can peak well above the 1380 A pump start, so the primary fuse or breaker curve must ride over it while still clearing secondary faults. It barely moves the secondary voltage, so the running loads do not ride through it the way they ride through the motor start.

Keep reading

  • How-to

    Powering a 600 V three-phase machine from 240 V single phase

    The nameplate works out to 20.8 kVA of apparent power. Fed from the single-phase shop service, that is about 87 A before converter and transformer losses, so the machine needs a rotary phase converter sized to its total demand plus a reverse-connected step-down transformer, unless tracing shows the internals run on 200 to 220 V. Verify loaded voltage balance before releasing the machine to production.

    Power distribution and transformers

  • Explainer

    Converting a 350 kVA soft start limit to starting current

    A 350 kVA soft start limit is about 421 A of line current at 480 V: divide 350,000 VA by √3 × 480 V. The figure is apparent power, so no power factor enters the conversion, and it carries no duration — that comes from the torque-speed margin. The 12.5 kV fuse is a coordination problem; motor protection belongs at 480 V.

    Motors and motor starters

  • Troubleshooting

    Fixing AC contactor chatter on a loaded 80 HP motor start

    Chatter with the motor connected but a clean pull-in with the motor disconnected is the supply sagging under locked-rotor current; the 750 VA and external-outlet tests already cleared the control transformer. At 6x the 81 A label the start draws about 486 A on a 271 A transformer, so limit the start to roughly 270 A with a soft starter and verify the coil holds above 102 V.

    Motors and motor starters