Comparison
Fuse or relay for thyristor protection: comparing I²t let-through
Short answer
Accept a relay-and-breaker alternative to the specified bridge-input fuse only when a documented calculation shows the total fault energy let through before interruption stays below the thyristor's I²t surge withstand. Pickup current alone proves nothing; the fast fuse clears in under a quarter cycle and usually wins.
On this page
No, do not accept the overcurrent relay as an equivalent to the specified bridge-input fuse unless the proponent demonstrates, with a documented calculation, that the relay's complete trip path lets through less fault energy than the thyristors can survive. The comparison quantity is I²t: the integral of current squared over time from fault inception to final interruption. A very fast semiconductor fuse at the bridge AC input current-limits and clears in well under a quarter cycle; a relay must detect, trip and then wait for a separate breaker to clear, so the thyristors sit at near-full prospective fault current for the whole path. Whoever proposes the relay owes you that calculation — if they have not done it, they do not know whether their solution protects the device.
Why I²t decides it #
A thyristor datasheet gives two surge quantities, and they are not the same number. The surge current rating is stated as a peak current for a stated duration and number of cycles; the I²t rating states the allowable energy integral, and there the current is the RMS value of the surge. Both come from the manufacturer's surge and I²t curves for the installed device part number, with the junction temperature conditions the datasheet attaches to them. For coordination you compare one integral with another: energy reaching the device against energy the device tolerates.
The fuse side of that comparison is easy to read, because high-speed fuses publish exactly the quantity you need: total clearing I²t and peak let-through current as functions of prospective fault current. Current limitation is the whole reason the fuse wins — it drives the current to a low peak in a few milliseconds, so the let-through integral is a small number printed on a curve rather than something you must assemble from four devices' response times.
The relay side has no such printed curve, so you must build it from the clearing chain:
- CT response and ratio at the fault current
- relay element pickup and operating time at that current
- relay output and trip-circuit time
- breaker operating time plus contact parting and total clearing time
A non-current-limiting interruption lets through approximately the prospective current squared times the total clearing time. Compare that against the thyristor's I²t withstand at the same basis, and remember that a relay placed on the excitation transformer secondary bushings also has to be checked for which bridge fault cases it actually detects — a CT placement that misses a fault geometry protects nothing, however fast its settings are.
IEC 62477-1, the safety standard for power electronic converter systems, treats protection against overcurrent and the energy hazards of a converter as part of the equipment's safety requirements, which is why the coordination calculation belongs in the design submittal rather than in an email thread. Confirm the applicable edition and any local requirement with the authority having jurisdiction and the drive documentation.
The alternatives side by side #
| Approach | How it limits fault energy | What evidence it needs |
|---|---|---|
| High-speed fuse at bridge AC input | Current-limits within a few milliseconds; publishes total clearing I²t and peak let-through for each prospective current | Fuse let-through curve at the installation's fault current, compared with the thyristor's I²t withstand |
| Overcurrent relay plus breaker | Relies on the breaker to interrupt after the full detection-and-trip chain | CT response, relay operating time at the fault current, trip-path time, breaker total clearing time, and the completed I²t calculation |
| Breaker with magnetic instantaneous trip | Interrupts through its own trip mechanism, still not current-limiting | Manufacturer total clearing data at the fault current and the same completed I²t calculation |
The decision rule: the fast fuse stays unless the alternative's calculated let-through is below the thyristor withstand with margin at every fault case the bridge can see. A pickup setting above normal load current is not proof, and neither is the label "overcurrent relay".
Worked example #
All values below are illustrative example inputs, chosen to show the arithmetic; take the real numbers from the installed device's datasheet and the site fault study.
Inputs:
- Thyristor I²t withstand at 10 ms, with initial junction temperature per the datasheet condition: 120,000 A²s (example value)
- Prospective symmetrical fault current at the bridge AC input: 12,000 A (example fault study result)
- Relay operating time at that current: 40 ms; trip circuit and breaker total clearing time: 60 ms; total clearing path: 100 ms
- Proposed high-speed fuse total clearing I²t at 12,000 A prospective: 8,000 A²s; peak let-through 9,000 A (example datasheet curve readings)
Relay path let-through:
I²t = (12,000 A)² × 0.100 s = 144,000,000 × 0.100 = 14,400,000 A²s
14,400,000 A²s against 120,000 A²s withstand is a factor of 120 over — the relay alternative fails by two orders of magnitude, and the thyristors would almost certainly fail before the breaker contacts parted. Note that even cutting the clearing path to one cycle at 60 Hz (16.7 ms) gives 12,000² × 0.0167 = 2,404,800 A²s, still twenty times the withstand. That is the arithmetic reality of protecting a semiconductor with a mechanical interrupting device at full prospective current.
Fuse check:
Fuse let-through 8,000 A²s, which is 6.7 percent of the 120,000 A²s withstand — passes with margin. Also check the peak let-through against the surge current rating basis, since the peak value and the RMS-based I²t are different quantities on the datasheet, and repeat both checks for the largest fault case in the study, not just the one shown.
Decision for this example: keep the fuse. The relay path needs a clearing time under about 0.8 ms at that fault current to match the withstand, which no relay-breaker chain achieves.
What to demand from the proponent #
Before any substitution is approved, require these items in the submittal:
- The installed thyristor part number and its surge current and I²t withstand data, with rating conditions.
- The prospective fault current at the bridge AC input from a fault study, on the stated basis (symmetrical RMS, at the stated voltage).
- The complete clearing chain data: CT ratio and response, relay element, settings and operating time at the fault current, trip circuit, breaker total clearing time.
- The calculated let-through for each fault case the CT placement detects, against the withstand, with margin stated.
- The same comparison for the specified fuse using its published let-through curves at that fault current.
A related trap worth avoiding: fuse let-through curves are sometimes misused in fault studies as if they reduced the available fault current for downstream equipment ratings. That is a different question from device protection — see why fuse let-thru current does not belong in short circuit studies. The let-through number you want here is the total clearing I²t compared with device withstand, the same quantity used when sizing cable withstand with a fuse's total I²t let-through. For drive input circuits that do use semiconductor fuses, the practical selection questions differ; see finger-safe fuse options for a VFD input circuit.
Commissioning checks #
After any protection change, de-energize the excitation transformer and bridge, lock out and verify absence of voltage, then verify CT ratio and polarity against the design, relay settings against the approved calculation, trip continuity from relay output to the interrupting device, and the installed fuse or breaker type against the coordinated bill of materials. Confirm the device actually opens the bridge AC supply path — a relay target lamp is not proof that current stopped.
If the proponent cannot produce clearing-time or let-through data for the relay path, do not approve the alternative on promise of future data. The calculation is the deliverable; without it, the specified very fast fuse at the bridge AC input remains the correct protection, and the decision above stands.
Questions asked
Can an overcurrent relay replace the fast fuse on a six-pulse thyristor bridge?
Only after a documented coordination calculation shows the relay pickup, relay operating time, trip-circuit time and breaker total clearing time together deliver less I²t to the bridge than the thyristor's rated surge withstand at the actual prospective fault current. Pickup settings and CT ratios by themselves are not evidence of device protection, so the proponent must supply the calculation before the alternative is accepted.
Why is the relay's I²t so much larger than the fuse's?
The fuse is current-limiting: it forces the current to a low peak and clears in a few milliseconds, so its let-through I²t is a small datasheet number. The relay must detect the fault, close its output, trip the breaker and wait for the contacts to part, so the fault runs at or near full prospective current for the whole clearing path, and current squared times that longer time dominates the comparison.
What do I do if no I²t data exists for the relay-and-breaker combination?
The calculation can still be made from the breaker's total clearing time at the calculated fault current, since a non-current-limiting interruption lets through approximately the prospective current squared times the total clearing time in seconds. If the trip path time is unknown, measure or obtain it from the equipment documentation before approving the substitution; without that number the alternative cannot be demonstrated.
Does a magnetic instantaneous trip change the comparison?
It shortens the path but does not remove it. The breaker still needs its own magnetic pickup margin, its operating time and its contact parting and clearing time at the fault current. Total that time, apply the I²t calculation, and compare with the thyristor withstand the same way; the burden of proof stays with whoever proposes the alternative.