Short answer

On a NEMA Class E2 fused starter the current-limiting fuses are the short-circuit interrupter, so the phase 50 element defaults to alarm-only or disabled unless the coordination study and the contactor's interrupting rating support tripping. The 87 element follows the same test through its differential zone. Ground fault is separate: on an HRG 4.16 kV system with a core-balance CT and about 25 A or more of available ground-fault current, set 50G.

On this page
  1. What each device in a Class E2 starter is assigned to do
  2. The one rule that decides every element
  3. Element 50: alarm-only is the committed default
  4. Element 87: same test, different outcome
  5. Ground fault 50G on a high-resistance-grounded system
  6. Worked example: setting the 50 pickup against starting current on the 2000 hp, 4.16 kV motor
  7. Undervoltage and the elements you keep
  8. The coordination package to assemble before changing settings
  9. Questions asked

Yes to your instinct, with one condition per element. On a NEMA Class E2 combination controller the current-limiting fuses are the short-circuit interrupting device and the vacuum contactor is a starting and stopping device — a relay trip output commands the contactor, it does not re-rate it. So the phase 50 defaults to alarm-only or disabled unless the coordination study and the contactor's interrupting rating support a trip, and the 87 passes the same test through its differential zone. Set every other element from the motor data and the study. HRG grounding by itself does not settle 50G: with a core-balance CT and about 25 A or more of available ground-fault current, set it. The decision for each function, the numbers that move it and one worked example on the 2000 hp, 4.16 kV machine follow.

What each device in a Class E2 starter is assigned to do #

A NEMA Class E2 combination motor controller divides the work by design: the contactor's contacts start and stop the motor, and the current-limiting fuses interrupt short circuits and any fault beyond the contactor's switching capability. The relay measures and decides, but its trip contact is a control action into the contactor coil circuit, not a fault-interruption rating. NEMA starter tables make the switching-side limits concrete: they publish a reduced maximum horsepower where operation is interrupted more than 5 times per minute or more than 10 times in a 10-minute period, because frequently breaking even normal load current consumes contact life. Opening bolted-fault current is a different duty again, and on this starter the fuses own it.

The one rule that decides every element #

Every function in the relay gets the same test before it is allowed to trip: the protection study must show that the current the element detects, at the moment the contactor would open, is within the contactor's published interrupting rating and clears within its withstand time. Pass the test, trip. Fail it, and the function goes to alarm-only — with the fault actually cleared by the fuse or an upstream device — or is disabled with the reason recorded and another layer confirmed to cover the hazard. Applied to the three functions in question:

Function What it detects What clears that fault Committed setting on a Class E2 fused starter Trip only when
50, phase instantaneous Phase current above pickup, above starting level The current-limiting fuses Alarm-only or disabled Study shows current at pickup within the contactor interrupting rating, and any coordination delay clears inside the withstand time
87, motor differential Winding faults inside the CT zone The contactor, at currents below the fuse melting band Trip when core-balance CTs are fitted and proven; otherwise disabled and documented CT scheme installed, ratios and polarity proven by test, fault current within the contactor rating
50G, ground fault on HRG Residual or core-balance earth-fault current Alarm, locate, trip per the plant HRG policy Set it with a CBCT and about 25 A or more of available ground-fault current Pickup sits below the available ground-fault current with sensing margin, and the alarm reaches an attended point

Element 50: alarm-only is the committed default #

A 50 that is any use must pick up above locked-rotor current — the worked example below shows how little room is left. Everything above that level is exactly the region the current-limiting fuses were selected for: they clear it faster, and at higher current, than the contactor is rated to open. Tripping the contactor into that region asks a starting device to do fault interruption, which the Class E2 design deliberately avoids. If upstream coordination wants a delayed 50, that delay is checked against two curves before it is enabled: the fuse clearing time at that current, and the contactor's permissible withstand interval, both from the installed equipment documentation. When the pickup drifts down into starting current instead, you get operation on every acceleration — the failure mode behind troubleshooting intermittent instantaneous trips during motor starts.

Element 87: same test, different outcome #

Motor differential on a machine this size is normally a self-balancing scheme: a core-balance CT around each phase at the machine terminals, so only current escaping the zone drives the element. What it buys is detection of turn-to-turn and winding faults at currents far below any fuse's minimum-melting band — faults the fuses sit through for seconds or never clear at all. So the outcome runs the other way from the 50: if the CTs are fitted, matched to the relay and proven by test, 87 trips the contactor, because the current it detects is limited by the motor's own impedance and lands in ordinary switching territory; confirm that against the contactor's interrupting rating in the study. If the CTs are not installed, disable the element and record why — the fuses still cover bolted faults and the thermal elements still cover overload, and only the sensitive winding-fault layer is given up.

Ground fault 50G on a high-resistance-grounded system #

High-resistance grounding limits ground-fault current to the resistor's design value; it does not stop ground faults from happening, so an HRG system alone is not an argument against 50G. Two things decide it: how the relay senses earth-fault current, and how much is available. A residual measurement summed from the phase CTs can be blind at low levels; a core-balance CT around all three phases sees it directly. On the available-current side, about 25 A or more through the CBCT is where setting the element clearly pays — below that, prove the sensing margin first.

The usual response is alarm-first, announced at an attended point, with the feeder then taken off by procedure; the field work is the same as locating a ground fault on a resistance-grounded system. For the relay side, see configuring a 50G residual ground alarm on an HRG motor relay.

Worked example: setting the 50 pickup against starting current on the 2000 hp, 4.16 kV motor #

Inputs, with sources: 2000 hp and 4.16 kV, three-phase, from the machine nameplate; power factor 0.87, efficiency 0.95 and locked-rotor current at 6.0 times full load — typical figures for a motor of this size, stated here as assumptions to be replaced with the nameplate values before any setting is written.

The rule in words: full-load current is the shaft power converted to kilowatts, divided by root-three times the line voltage times power factor times efficiency; locked-rotor current is the locked-rotor multiple times full-load current.

The arithmetic:

  • FLC = (2000 hp × 0.746 kW per hp) ÷ (1.732 × 4.16 kV × 0.87 × 0.95)
  • Numerator: 2000 × 0.746 = 1492 kW
  • Denominator: 1.732 × 4.16 = 7.20; 7.20 × 0.87 = 6.26; 6.26 × 0.95 = 5.95
  • FLC = 1492 ÷ 5.95 = 251 A
  • Locked-rotor current = 6.0 × 251 A = 1506 A, call it 1500 A

Result and decision: a 50 pickup at or below about 1500 A operates on every start of this motor, so the element has no useful trip zone below locked-rotor current at all. Above 1500 A is fuse territory — current the contactor is not rated to open, cleared by devices selected for it. With no defensible trip zone between nuisance operation and fuse duty, the 50 goes to alarm-only or disabled, and the nameplate locked-rotor amps plus the installed fuse time-current curve confirm the boundary. These calculated values are estimates to be checked against the nameplate, the fuse documentation and the governing coordination study.

Undervoltage and the elements you keep #

A non-latched contactor already drops out when voltage is lost, so undervoltage protection is not doing the interrupting — but keep it. It time-stamps the event, and wired into restart logic it blocks an unsupervised re-acceleration when voltage returns. The thermal, time-overcurrent and start-supervision elements stay in service, set from nameplate data with the same discipline as setting overload relays from nameplate full-load current; none of them asks the contactor to open more than it is rated to switch.

The coordination package to assemble before changing settings #

Safety first: opening this starter's door or lifting a CT lead is medium-voltage work — put the equipment in an electrically safe working condition, de-energized, locked out and verified absent of voltage, before starting. NFPA 70E, 2024 edition, covers the safe work practices for this kind of work; confirm the procedures with your authority having jurisdiction and the equipment documentation. Never open-circuit a CT secondary while its primary could be energized.

Assemble, from the installed equipment and not from memory:

  • Fuse type, rating and time-current curve
  • Contactor interrupting rating and withstand time
  • CT ratios, polarity and as-built wiring
  • Available three-phase fault current at the starter
  • Available ground-fault current from the HRG design
  • Motor nameplate full-load amps, locked-rotor amps and thermal limits
  • The relay's settings file and enabled functions, read from the device

Prove CT polarity and metering by injection or a documented low-current check, and prove trip logic by observing the output contact change state — never by committing fault current through the contactor. Where drawings, nameplates and the relay configuration disagree, stop and resolve it before energizing.

Questions asked

Can the phase 50 element ever be set to trip on a Class E2 fused starter?

Only when the coordination study shows the current at the 50 pickup, at the instant the contactor opens, is within the contactor's interrupting rating, and that any delay added for upstream coordination still clears inside the contactor's withstand time. Without that demonstration the fuses are the short-circuit clearing path and the 50 belongs on alarm or disabled.

Should element 87 be disabled when no differential CTs are installed?

Yes. With nothing around the protected zone there is no valid measurement, so disable the element and record the reason in the protection study. Bolted faults stay covered by the fuses and overload conditions by the thermal elements; only sensitive winding-fault detection is given up.

Is 50G needed on a high-resistance-grounded 4.16 kV system?

High-resistance grounding limits earth-fault current to the resistor's design value; it does not prevent ground faults. With a core-balance CT and about 25 A or more of available ground-fault current, set the element, usually alarm-first with a defined response and a way to locate the feeder. Below that, prove the sensing margin before relying on it.

Does undervoltage protection matter with a non-latched contactor?

The contactor already drops out on loss of voltage, so the element is not needed for interruption. Keep it anyway: it time-stamps the event and, wired into restart logic, blocks unsupervised re-acceleration when voltage returns. It carries no nuisance-trip cost on a healthy start.

What must be proven by test before 87 is allowed to trip?

Matched CT ratios against the relay setting, polarity proven by injection or a documented low-current check, wiring that matches the drawings, and near-zero measured balance in service. Prove the trip logic by observing the output contact change state — never by committing fault current through the contactor.

Keep reading

  • Comparison

    What current-only motor protection can and cannot detect

    Three per-phase current amplitudes support overload, phase loss, current unbalance, stalled acceleration and short-cycling protection, and nothing else. Undervoltage, ground fault, winding temperature and mechanical overloads such as high head pressure need their own inputs: a voltage measurement channel, a core-balance current transformer, and temperature or pressure sensors.

    Protection: breakers, fuses and SCCR

  • Troubleshooting

    Why semiconductor fuses blow on DOL motor starts

    Yes to both. A semiconductor fuse has no dc filter and no intentional delay, so a direct-on-line start heats it with the full asymmetrical rms of the first half-cycle; the starting power factor follows from the locked-rotor test, PF = watts / (√3 × V × I), and worst-case offset turns 7.5 × FLC into 13 × FLC — enough to cut a 160 A fuse's pre-arc curve. The fix is taking the DOL path off those fuses, not upsizing them.

    Protection: breakers, fuses and SCCR

  • Troubleshooting

    Motor starters trip when MCC doors are closed

    The trips are real protection, not nuisance: a thermal overload relay without ambient compensation responds to enclosure air temperature, so doors open plus a fan suppresses trips while motor heating continues. A 10-12 V spread on 480 V is 1.0% to 1.7% voltage unbalance, above the NEMA MG 1 limit of 1.0%, and a 60-70 A current spread is severe. Close the doors, pull the fan, and fix the upstream supply that survived the chiller and MCC replacement.

    Motors and motor starters