Short answer

You can rectify it: first find which rating the added generators exceed, then separate the contributions with an open bus section, add impedance or current limiting (series reactor, interposing transformer, current-limiting fuses, fault-current limiter), or have the manufacturer raise the rating. For a 30 kA, 3 s board the thermal equivalent is 36.7 kA for 2 s, but breaker making and breaking ratings cap the duty, so mitigation must bring the fault level back under the rated short-time current.

On this page
  1. Which rating the added generators exceed
  2. Worked example: reading a 30 kA for 3 s board with 2 s clearing
  3. The six remedies compared
  4. Reactor or interposing transformer: adding impedance
  5. Fuses and the active limiter: limiting the current
  6. Open bus section or manufacturer upgrade
  7. Verify the rectified design
  8. Questions asked

Yes, a switchgear bus whose fault duty is exceeded by added generators can usually be rectified without scrapping the board, and the remedy follows from one question: which rating did the generators exceed? Breaker breaking capacity, breaker making duty at the first peak, the busbar short-time and peak withstand, and the current transformers all fail differently and are fixed differently. Behind that answer sit three families of fix: separate the contributions by running a bus section open, add impedance or current limiting (series reactor, interposing transformer, current-limiting fuses, fast fault-current limiter), or raise the rating through the switchgear manufacturer. Below is the comparison, the worked thermal arithmetic for a 30 kA for 3 s rating, and the studies each option must pass.

Which rating the added generators exceed #

Rerun the short-circuit study with the new generators synchronized and compare the result against every rating the fault current touches, at the main bus and again at each downstream device, because the lineup and its breakers are rated separately, as MCC short-circuit rating vs bucket breaker ratings shows. Four ratings fail in different ways:

  • The breaker's breaking capacity: the rms current it must interrupt at the end of the fault.
  • The breaker's making capacity and the assembly's peak withstand: set by the first asymmetrical peak, which dc offset and large-motor contribution both raise.
  • The busbar short-time withstand: heat, governed by I²t up to the protection clearing time. The current transformers carry their own short-time rating, and upsized feeder cables fix neither.
  • Everything downstream of the point you change: fuse let-through, contactor withstand, cable I²t.

Compare the right current for each check. A fault level taken after 8 cycles is the conventional number, but fast protection exposes the breaker to a more asymmetrical current than that, and slow clearing loads the busbar with more energy. Which bolted fault current to use for breaker duty and arc flash sets the window for the breaker check, and calculating transformer interrupting current from impedance gives the arithmetic when the source is a transformer.

Worked example: reading a 30 kA for 3 s board with 2 s clearing #

Inputs:

  • Board rating: short-time withstand current 30 kA rms for 3 s, from the assembly nameplate. This is the IEC 61439-1 rating (2020 edition, the low-voltage assembly standard) for the busbars and connections.
  • Clearing time: 2 s maximum for a bus fault, from the protection coordination study.
  • Making-duty factor: 2.5 times the breaking capacity at 50 Hz, from IEC 62271-100 (2021 edition, the high-voltage breaker standard). A low-voltage breaker prints its own making capacity on the nameplate, so use that printed number when it differs.

Rule, in words: the assembly has a heat budget of I²t. A larger current for a shorter time is thermally equivalent as long as the product is not exceeded, and the IEC 61439 practice guidance adds one condition: the resulting peak must stay within the rated peak withstand current.

Arithmetic:

  • Heat budget: I²t = (30 kA)² × 3 s = 900 kA² × 3 s = 2700 kA²s.
  • Equivalent current for a 2 s fault: I = √(2700 kA²s ÷ 2 s) = √1350 kA² = 36.7 kA rms.
  • Peak the breakers must make at the rated current: 2.5 × 30 kA = 75 kA peak.

Result: the busbar thermal envelope reaches 36.7 kA rms when the fault clears in 2 s, but the arithmetic moved only the heat budget. The breaker breaking capacity, the making capacity and the assembly's peak withstand stay at their nameplate values.

Decision: treat the rated short-time current as the ceiling for any fault the board's own breakers clear. Bank the 36.7 kA thermal figure only with the switchgear manufacturer's written confirmation of the peak withstand and the breaker duties at that current. Without that confirmation, a study result above the rated short-time current means mitigate, and the remedies below are the menu.

The six remedies compared #

Pick by the rating that failed and by what the plant can live with:

Remedy How it cuts the duty Where it fits What you must verify
Run a bus section open Separates the source contributions; adds no impedance Boards with a sectionalized bus and enough capacity to lose the tie Fault level and protection in every switching state, including tie closed for maintenance
Series current-limiting reactor Series impedance lowers the prospective current in everything behind it On the generator feeders or at a bus section Load-flow voltage drop, direct-on-line motor starting, continuous losses, protection grading
Fault-current limiter Senses the rising fault current and commutates it into a current-limiting fuse Existing boards where one incoming source sets the fault level Capacitors, filters and large motor starting currents through it; owner acceptance; comparison with replacement
Current-limiting fuses Let-through current stays below the downstream withstand One feeder protecting a clearly defined downstream island Let-through data against each downstream device, coordination, single-phase behavior
Interposing transformer Impedance between the generator and the bus, with optional voltage and earthing change A generator tie that also wants a different voltage or earthing arrangement Fault reduction against regulation and losses, loading, protection redesign
Manufacturer upgrade or replacement Raises the rating itself Boards the study shows limited in several components Only the manufacturer changes internals; weigh spares and outage duration against a limiter

Reactor or interposing transformer: adding impedance #

A series current-limiting reactor is the passive, fail-safe fix: its impedance cuts the prospective current in every device behind it, and series-reactor guidance for power systems is explicit that the point is to bring fault currents down to levels existing equipment can handle, removing the need to replace that equipment. The price is paid continuously, in copper losses at load current and in a voltage drop that peaks during direct-on-line motor starting. Before you commit, run a load-flow and a motor-starting study: a reactor sized on fault current alone can dip the bus further than the motor starters on it tolerate. Choose the reactor when the plant will not accept an active device in the fault path and both studies pass.

An interposing transformer adds the same kind of impedance between the generator and the bus, and it brings options a reactor cannot: a voltage change and a winding-arrangement change. Check it for regulation, losses and loading, and redesign the protection around it. Choose it when that voltage or earthing change is wanted anyway; otherwise the reactor is the simpler machine.

Fuses and the active limiter: limiting the current #

Current-limiting fuses are attractive because they cost nothing in steady state: no losses at load current and no voltage drop, unlike the reactor. The trade is proof: the let-through current must be verified against every downstream device, and when a current-limiting fuse protects a circuit breaker shows the check to run. The coordination study is specialist work, and a fuse is a single-phase device, so motor circuits need single-phasing protection on top. Use fuses where one feeder protects a defined downstream island and the let-through data closes the case; do not hang a whole generator's contribution on them without the coordination study done.

A fault-current limiter watches the current rise and, within the first millisecond, commutates the fault into a parallel current-limiting fuse, so downstream equipment never sees the full prospective current. It suits an existing board where one incoming source sets the fault level. Verify two things before selecting it: that no power-factor-correction capacitors or harmonic filters sit where the limiter's action interacts with them, and that no large direct-on-line motor starting current flows through the unit. Then confirm the owner, insurer and authority having jurisdiction accept an active device in the fault path.

Open bus section or manufacturer upgrade #

Running a bus section open separates the source contributions without adding a single ohm: no losses, no voltage drop. It costs redundancy while open, but the added generation may pay that back in supply security, which is why it is the first option to study when the board is sectionalized. Write the rule into the switching procedure: with the tie closed the contributions add again, so the study must pass in every state the operators can actually create.

The manufacturer upgrade is the option engineers forget. Makers of older boards have replaced breakers, braced busbars and changed current transformers to raise the fault rating, and only the manufacturer may modify internals and re-certify the assembly. Get that offer in writing before committing to a limiter or a replacement: once spares and outage duration are weighed, the manufacturer route is often the sounder choice. If the study shows the busbars and current transformers under-rated across the whole board, replacement is the honest answer, and upsizing the feeder cables alone changes nothing at the bus.

Verify the rectified design #

Close out in this order:

  1. Model the system with the generators synchronized, in every credible switching state, motor contribution included.
  2. Calculate rms and peak duties at the main bus and at each device, and compare each against its own nameplate rating from the first section.
  3. For any reactor, transformer, fuse or limiter, rerun the protection coordination so the clearing times still fit the busbar heat budget, plus a load-flow and motor-starting check for voltage dip.
  4. Obtain written manufacturer confirmation for any internal modification, with re-certification of the assembly under IEC 61439-1.
  5. Accept only when every studied configuration sits within the documented ratings; if one does not, keep the new generation isolated or replace the gear.

One safety note: whatever remedy you choose, executing it is work inside the board. De-energize, lock out and test for absence of voltage before any panel is opened; NFPA 70E, 2024 edition, covers the electrical-safety practice for that work, and the local authority having jurisdiction has the final word on the applicable requirements.

Questions asked

How close can the calculated fault current sit to the switchgear rating?

Commit to a margin: treat any calculated duty within about 5 percent of the rating as exceeded. Fault studies carry at least that much uncertainty in source impedances and motor contribution, and the next feeder or generator added consumes whatever is left. The comparison also has to pass in the worst switching state, so a duty that only clears with a bus tie open has not cleared at all.

Why does fitting higher-rated breakers not fix the board?

The breakers are only one limit in the lineup. The busbar short-time and peak withstand, the current transformers and the internal connections keep their original ratings, and inside an existing assembly only the manufacturer may change components and re-certify it. Unless the study shows the breakers alone are exceeded, a breaker swap leaves the board under-rated.

Does an interposing transformer limit earth-fault current as well?

It can. A delta-wye interposing transformer blocks zero-sequence current from passing through it, so the earth-fault level on the bus is set by the transformer's winding arrangement and earthing impedance rather than by the generator's earthing. That gives a second design lever: choose the earthing impedance to hold earth-fault current below the downstream device ratings.

What happens if a fault-current limiter fails to trigger?

The full prospective fault current flows until the backup protection clears it, and the downstream equipment takes exactly the duty it was meant to be spared. That is the reason for the acceptance check: confirm the owner, insurer and authority having jurisdiction accept an active device in the fault path, and grade the backup protection to clear the un-limited current.

Keep reading

  • Selection guide

    Grounding transformer short-time rating for a 30 s fault

    Size a star-open-delta grounding transformer by ground-fault duty, not nameplate kVA: at 11 kV the 30 s duty is 6.35 kV times the limited ground current, about 159 kVA at 25 A. Select the smallest frame whose manufacturer documents a short-time rating above one third of that current per winding, and reserve IEEE C57.96-2013 for repeat-event life loss.

    Power distribution and transformers

  • Explainer

    NFPA 70E table limits for operating switchgear breakers

    NFPA 70E's table method is bounded by available fault current, clearing time and working distance, not by the main breaker's ampere rating. A large continuous rating alone does not put switchgear outside the tables; the real gate is the calculated fault duty and the clearing time of the device that clears. When either exceeds the table limits or cannot be determined for lack of data, the compliant routes are the normal-operation exception for door-closed switching and an incident energy analysis of that switchgear.

    Electrical safety and codes

  • How-to

    Conduit material and bolted faults in fault current calcs

    Enter the nonmagnetic (PVC) conduit entry when the run is mostly PVC; give steel elbows their own steel segments only if your method accepts them. A bolted fault is a zero-impedance fault at the point of study, so it yields the maximum available current, limited by the source and path impedance alone, and it is the value compared against interrupting ratings and SCCR.

    Protection: breakers, fuses and SCCR