Short answer

A motor marked only 208 V is 15.4 percent overvoltage on a measured 240 V supply, outside the plus-or-minus 10 percent band ANSI/NEMA MG 1 gives it, so do not connect it directly. If the nameplate reads 208-230/460, 240 V sits within the band: measure all three line-to-line voltages, set the overload from nameplate current and run it.

On this page
  1. Read the whole voltage marking first
  2. Where the rating comes from
  3. What NEMA MG 1 permits
  4. The overvoltage check: nameplate versus the measured supply
  5. What the extra volts do inside the motor
  6. Measure the converter output, not the catalog label
  7. Coils, overloads and the gearbox cooling fan
  8. The decision, case by case
  9. Questions asked

Measure before you connect. A three-phase conveyor motor marked only 208 V sees 15.4 percent overvoltage on a 240 V supply, and that sits outside the plus-or-minus 10 percent running band NEMA MG 1 gives the winding, so a 208 V-only motor must not be tied straight to a 240 V rotary phase converter. A nameplate that reads 208-230/460 is a different case: the 208-230 band is a rated band, 240 V fits inside its allowance, and the job becomes verification. Here is the nameplate check, the standard clause, the arithmetic that separates the two cases, and the coil, overload and gearbox-fan details that travel with the supply.

Read the whole voltage marking first #

Pull the nameplate data before you decide anything, and read the voltage field in full. Two markings turn up on motors like this conveyor's:

  • 208 alone. The motor is rated at 208 V, and nothing on the nameplate licenses a higher supply.
  • 208-230/460. A dual-voltage motor, rated across the 208-230 V band on the low-voltage connection and at 460 V on the high-voltage connection. The manufacturer holds the motor to its nameplate efficiency, current and torque across that whole band, not just at one point.

While you are at the motor, record the full-load current, the frequency and the connection arrangement; the overload setting later depends on them. De-energize the conveyor, lock it out and verify absence of voltage at the leads before you open the terminal box to match leads to the wiring diagram.

Where the rating comes from #

That 208 V-only rating is the line-to-line voltage of a 120/208Y system: 120 V line-to-neutral feeds lighting and receptacle circuits while the line-to-line side feeds motors and other three-phase loads. Schools, churches and a lot of light-industrial warehouses are served that way, which is exactly the sort of building a surplus warehouse conveyor comes from. The marking tells you where the motor used to live. It says nothing about what your shop may feed it.

What NEMA MG 1 permits #

ANSI/NEMA MG 1 (2021 edition), section 12.45, requires a motor to operate successfully under running conditions at plus or minus 10 percent of rated voltage, with rated frequency. That clause is the whole permitted range: 10 percent above nameplate, no more. Editions move and local practice varies, so confirm the clause against the edition your motor documentation cites and with the authority having jurisdiction if the installation gets inspected. The worked example below applies it to both markings.

The overvoltage check: nameplate versus the measured supply #

Inputs:

  • Rated voltage 208 V at 60 Hz, from the conveyor motor's nameplate.
  • Measured supply 240 V line-to-line at the motor terminals with the converter running. That is this shop's service voltage; your own meter reading decides the number you plug in.

Rule: MG 1 section 12.45 lets the motor run at up to 10 percent above rated voltage. Anything past that ceiling is outside the standard's running conditions.

Arithmetic:

  • Ceiling: rated voltage x 1.10 = 228.8 V
  • Excess: 240 V minus the 208 V rating leaves 32 V, and 32 / rated voltage = 0.1538, so the supply is 15.4 percent over nameplate
  • Margin: 240 V - 228.8 V = 11.2 V past the ceiling

Result: the converter's 240 V output puts the winding 15.4 percent over rating, 11.2 V beyond what MG 1 allows. This is a supply estimate, not a measurement of the motor's temperature; check it against the nameplate and the motor documentation before connecting anything.

Decision for the 208-only marking: do not connect direct. Feed the motor its rated voltage through a step-down transformer sized for the motor's starting inrush, put a drive programmed with the motor's rating in front of it, or fit a motor whose marking covers the supply you have.

Decision for a 208-230/460 marking: redo the check against the 230 V end of the band. Ceiling: 230 V x 1.10 = 253 V. Excess: (240 V - 230 V) / 230 V = 0.0435, about 4.3 percent over the 230 V point, which is inside the allowance. Connect on the low-voltage pattern and verify as described below.

What the extra volts do inside the motor #

At unchanged frequency, extra voltage drives proportionally more flux through the iron. Past the knee of the saturation curve, magnetizing current climbs steeply instead of proportionally, the behavior traced in transformer saturation curve and its magnetizing current, and the extra magnetizing current plus the added iron loss show up as heat even with the belt unloaded. A motor that starts briskly and sounds normal has proven nothing about where its temperature lands an hour in.

The honest check is electrical. Measure each of the three line currents with the conveyor loaded and compare them with nameplate full-load current; a supply above nameplate is one of the standard reasons motor current rises above the nameplate value.

Measure the converter output, not the catalog label #

A rotary phase converter's output depends on its design, its loading and the motor hung on it, so judge it from the meter, not from the plate on the side. Energized measurements belong to a qualified person with an instrument rated for the service. With the converter running, read all three line-to-line pairs, A-B, B-C and C-A, with the conveyor connected and unloaded, then again under load. Unequal pairs mean unequal phase currents and extra motor heating, and a single reading between two of the three pairs tells you nothing about the third. Compare the readings with the converter documentation and the band the motor's marking allows before the conveyor runs loaded.

Coils, overloads and the gearbox cooling fan #

The contactor coils obey the same arithmetic as the motor. A coil wound for the old 120/208 service and held on a higher control supply sits overvoltage by the same proportion, runs hot and wears out fast, so fit coils rated for the measured control voltage from the contactor manufacturer's coil list. If control power now comes through a control transformer, match its secondary tap to the coil you fit.

Set the overload relay from the nameplate full-load current per the relay's instructions; setting overload relays from nameplate full-load current covers the procedure. Do not raise the setting to stop a nuisance trip. A trip while the supply is high is information about the supply, and covering it up hides the problem. If a transformer is feeding the motor its rated voltage, the nameplate current is still the setting.

The gearbox fan gets its own nameplate check. An electric fan motor follows the same voltage rule as the main motor, so a fan rated at the same voltage as the old service needs the same correction the main motor needs on the converter output. A shaft-driven fan has no electrical supply to correct; check its coupling and airflow path instead.

The decision, case by case #

  • Nameplate reads 208 only: the measured converter output is outside the motor's permitted band, so supply the motor through a step-down transformer sized for starting current, program a drive with the motor's rated voltage and current, or fit a motor marked for the supply. Never wire it direct.
  • Nameplate reads 208-230/460: the supply sits inside the allowance around the 230 V point. Connect on the low-voltage pattern, verify all three line-to-line voltages and all three line currents under load, set the overload from nameplate current, and run the conveyor.
  • Either marking: if the three voltage pairs or the three line currents come out measurably unequal, correct the supply before you load the belt.

This is the same supply-versus-nameplate comparison that flags a 575 V pump motor sitting on a 630 V service: when the numbers disagree, the supply is the thing that gets corrected.

Questions asked

Can a VFD run this 208 V motor from the 240 V converter?

Often yes. A drive synthesizes its own output voltage, so during commissioning you enter the motor's rated voltage, frequency and full-load current and the winding sees roughly its rating. Before anything else, confirm the drive model accepts phase-converter input and that its input voltage rating covers the converter's measured output. Set the drive's motor protection parameters per its manual; they replace a separate overload relay only where the drive and installation meet the listing.

Does running the conveyor only occasionally make 240 V acceptable?

No. For a 208 V-only winding the supply sits outside the standard's running band every time the motor is energized, and saturation losses become heat within minutes, not after hours of duty. Short runs reduce the accumulated temperature, not the violation, so correct the voltage instead of rationing the run time.

Why not just turn the converter output down to 208 V?

An ordinary rotary phase converter has no output voltage setting. Its three-phase output tracks the single-phase input and drops slightly under load, so a 240 V service yields roughly 240 V. The practical ways to feed the motor its rated voltage are a step-down transformer ahead of the motor or a drive programmed with the motor's rating.

Which lead connection do I use on a 208-230/460 motor?

Follow the connection diagram on the nameplate or inside the terminal box. The low-voltage pattern covers the 208-230 V band and the high-voltage pattern covers 460 V; the printed voltage figures by themselves do not tell you the terminal arrangement. Match the leads to the diagram for your supply, bump-check the rotation, then measure line currents under load.

Keep reading

  • Troubleshooting

    Checking 630 V supply on a 575 V pump motor

    The measured reading is +9.57% above the 575 V nameplate — just inside the ±10% running band of NEMA MG 1 clause 12.45, so the standard will not condemn the supply, but it sits above the roughly +5% point where motor current starts to climb and can finish off a pump already near its load limit. Land the corrected target of 600 V or less at the running motor, and settle the overload setting, dry-run protection and pump duty before crediting voltage as the sole cause.

    Motors and motor starters

  • Explainer

    Running a three-phase motor on single-phase 208 V

    Yes — a spinning three-phase motor fed across two terminals regenerates the third leg, but winding heating caps it near 30-40% of rated horsepower, so it is a bench trick, not a supply. For real loads, use a rotary phase converter with an idler at least the next size above the largest motor, or a single-phase-input VFD for motors only — never a drive for amplifiers or power supplies.

    Motors and motor starters

  • Explainer

    Why any two phase swaps reverse a three-phase motor

    Swap any two of the three supply conductors — A and B, B and C, or A and C — and a three-phase induction motor reverses identically, because every two-conductor exchange flips the phase sequence to its mirror; no pair changes timing. Heat after a reversal traces to voltage unbalance above NEMA MG-1's 1.0% limit, load, or a one-directional cooling fan.

    Motors and motor starters