Running a three-phase motor on single-phase 208 V

Motors and motor starters Published 7 min read

Short answer

Yes — a spinning three-phase motor fed across two terminals regenerates the third leg, but winding heating caps it near 30-40% of rated horsepower, so it is a bench trick, not a supply. For real loads, use a rotary phase converter with an idler at least the next size above the largest motor, or a single-phase-input VFD for motors only — never a drive for amplifiers or power supplies.

On this page
  1. How the third leg regenerates
  2. What two-leg single phase actually is
  3. The motor as its own converter
  4. The rotary converter route
  5. The VFD route
  6. Worked example: a 3 HP machine on two-leg wye power
  7. Choosing the route
  8. Questions asked

Yes — with the rotor already turning. A three-phase induction motor with 208 V applied across two of its line terminals generates the third phase on the open terminal, shifted close to 120 electrical degrees, and a voltmeter on that terminal will show it. The catch is horsepower: fed this way the motor carries only about 30-40% of its nameplate rating before the unbalanced currents overheat the windings, and it cannot start itself, so as a power supply this is a bench trick. The routes that hold up in service are a rotary phase converter — a dedicated idler motor generating the third leg for the load machines — or, when the load is a motor and nothing else, a VFD rated for single-phase input. Electronic three-phase loads such as amplifiers and rectifier power supplies must take the converter route: drive output is PWM, not a sine wave.

How the third leg regenerates #

At standstill, the two-terminal feed energizes one winding pair and produces a pulsing field with no rotation: the motor hums, draws locked-rotor current, and trips its overload if you leave it. Rotation changes the physics. Give the shaft a spin and it accelerates to near synchronous speed; the moving rotor turns the pulsating field into a rotating one, and the third winding then induces a voltage of its own.

The generated leg is real power, not a phantom reading, and it is live whenever the motor turns. Before you make or break any connection, open and lock the disconnect and verify absence of voltage at the terminals — including the one nothing feeds. On two-terminal feed the motor runs as a badly unbalanced single-phase machine: two winding groups make useful torque while counter-rotating negative-sequence fields dump their share as rotor and stator heat. That heat is the limit, and continuous load stays near 30-40% of rated horsepower.

What two-leg single phase actually is #

In a building, the voltage between two hots is almost never a dedicated secondary of that rating — it is two legs of a 208Y/120 wye service, common in apartment and commercial panels: 120 V from each leg to the neutral, and between the legs:

  • 120 sin θ − 120 sin(θ − 120°) = 180 sin θ + 104 cos θ
  • amplitude √(180² + 104²) = √43,216 ≈ 208 V, shifted 30°

Residential split phase is a different animal: one center-tapped winding, 120 V to neutral on each side, 180° apart, 240 V end to end. A wye pair and a split-phase pair look identical on a two-wire meter reading — one sine — so the phase-conversion method does not care which you have.

The motor does care about voltage. A 230 V nameplate on a wye pair sits at 90.4% of rating, just inside the ±10% band that NEMA MG-1 (2021 edition) expects a motor to operate in at rated frequency; expect roughly 10% higher full-load current and a hotter motor at rated load. A 208-230/460 nameplate is the right motor for this service.

The motor as its own converter #

Spin it up first — by hand with the load uncoupled, with a small pony motor, or with a capacitor-start circuit — then close the supply across two terminals. The third terminal is now a source. Capacitors shape it: run capacitors around 3-5 µF per horsepower, connected between the generated leg and one or both supply legs, and a temporary start bank around 25-50 µF per horsepower, in circuit only until the motor is up.

Those microfarad numbers are starting points, not answers: tune with a voltmeter at normal load until the three line-to-line readings sit within a few percent of each other, because even 2% voltage imbalance begins derating an induction motor. Decision on this route: one lightly loaded machine or a temporary run only. Hold a third of rated load or more and the converting motor cooks itself.

The rotary converter route #

Same physics, dedicated hardware. The idler — commonly a 1725 RPM three-phase motor — takes single phase across two terminals, and its third terminal, balanced by run capacitors, becomes the third leg of a small three-phase bus for the load machines. A pony motor around half the idler rating, or a capacitor-start panel, spins the idler up before the bus is energized.

Sizing rule: idler at least as large as the largest load motor, and the next size up — 1.5 to 2 times for hard-starting loads such as compressors and mills. Headline converter ratings do not equal motor-starting ratings: one documented 3 HP-class rotary converter, the SB-3 Smart-Boost, is rated to start and run a 1.5 HP motor, or 4 A of resistive, CNC or inductive load at 208-240 V. Read the starting-versus-continuous split in the converter's documentation before buying, and size from the load's own numbers.

Output from any rotary converter is unbalanced three phase, so check the line-to-line spread whenever the load mix changes. Each machine keeps its own contactor and overload relay — the motor starter vs contactor distinction is the point here — plus a disconnect within sight of the motor. NFPA 70, the National Electrical Code (2023 edition), Article 430 governs these motor circuits: overload protection under 430.32, disconnecting means under 430.102, conductor sizing from the full-load-current tables. Confirm the details with the local authority having jurisdiction and the equipment documentation; the worked example below follows those rules.

The VFD route #

For one motor, a drive with single-phase input and three-phase output is the clean answer: soft start, built-in overload, speed control. Program the motor data from the nameplate, set the rated output voltage to the motor's own dual-voltage rating and the base frequency to 60 Hz.

Sizing is where it goes wrong. For the same power at the same voltage, single-phase current is √3 = 1.732 times the three-phase line current, because the input rectifier works from two conduction pulses per cycle instead of six — about 73% more current through the input side, its breaker and its conductors. Manufacturers publish a single-phase input rating and a derating table for exactly this reason; on dual-input drives this rating is common on the small frames, and the manual says where it stops. Typical selection factors:

Load Multiply load HP by
Fan or pump, easy start 1.0
Compressor, mill, conveyor 1.25
Crusher, high-inertia load 1.5

Treat those as starting points and the drive's single-phase input table as the authority. Size branch-circuit conductors to at least 125% of the drive's rated input current, per NEC 430.122(B) (2023 edition). Expect dirtier line current than the same drive on three-phase — an input line reactor is the usual fix, and choosing a line reactor for a VFD is a sizing decision of its own. One boundary never moves: the output is PWM for motor windings only. If the machine voltage is also wrong for the service, the drive route still applies — powering a 600 V three-phase machine from 240 V single phase is the same pattern a transformation further on.

Worked example: a 3 HP machine on two-leg wye power #

Inputs: the two-leg feed described above; a 3 HP three-phase mill with the same 208-230/460 nameplate; full-load current 9.6 A at 230 V from NEC Table 430.250 (2023 edition).

  1. Motor current scales inversely with voltage: 9.6 A × 230 / 208 = 10.6 A.
  2. Drive size for mill duty: 3 HP × 1.25 = 3.75 HP minimum, so a 5 HP drive with a documented single-phase input rating at this voltage.
  3. Input current from the √3 rule: 1.732 × 10.6 A = 18.4 A. The drive nameplate input current governs — read it before ordering the breaker.
  4. Branch circuit: 1.25 × 18.4 A = 23.0 A minimum ampacity, so #10 AWG copper THWN at 35 A (75 °C column) on a 30 A two-pole breaker.

Rotary alternative for the same load: a 5 HP idler (1.5-2 times the 3 HP load), a 2-3 HP pony motor, and run capacitors of roughly 15-25 µF total (3-5 µF per idler horsepower), tuned at load. Branch circuit from the converter's documented input current with the same 125% margin.

Decision for this case: one machine on single-phase service — take the VFD and the 30 A circuit. Several three-phase machines — the 5 HP idler, one branch circuit, a starter at each machine. Amplifiers or power supplies in the mix — converter only, sized from their amps.

Choosing the route #

Situation Route Number to hold
One motor, speed control a bonus Single-phase-input VFD Drive at 1.25-1.5x load HP; conductors at 125% of drive input current
Several three-phase machines Rotary converter Idler next size above the largest motor
Amplifiers, rectifier supplies, non-motor loads Rotary converter only Size from load amps, never a VFD
Bench run or emergency use The motor itself, spun up 30-40% of nameplate HP

The third leg is free physics. Full horsepower is not: buy the idler or the drive.

Questions asked

Will a three-phase motor start by itself on single phase?

No. At standstill the single winding pair produces a pulsing field with no rotating component, so the motor hums and draws locked-rotor current until the overload trips. It has to be spun up first — by hand, a pony motor, or a capacitor-start circuit. Once it is turning fast enough it accelerates to near synchronous speed and the open terminal begins generating.

Why only 30-40% of rated horsepower on two terminals?

With one winding pair energized, two winding groups carry the whole load and a counter-rotating negative-sequence field converts part of the input into rotor and stator heat instead of torque. Sustained output above roughly a third of nameplate overheats the machine. A rotary converter's idler runs lightly loaded and absorbs that imbalance, which is why the load motors can draw full rating.

Can a VFD power three-phase amplifiers or power supplies?

No. The drive's output is a PWM switched waveform shaped for motor windings, not a sine wave; audio amplifiers and most rectifier front ends will be damaged by it. Non-motor three-phase loads need a rotary converter or genuine three-phase service, sized from the load's current draw rather than horsepower.

Is the two-leg wye voltage just low 240 V?

No — they come from different transformers. The wye pair is two phases of a 208Y/120 service: 120 V to neutral on each leg, 120 degrees apart, and the higher voltage between them. Split-phase 240 V is one center-tapped winding, 120/120 V at 180 degrees. Either way the motor sees one sine between two wires; the nameplate voltage rating is what matters.

How much larger should the drive be on single-phase input?

Plan on single-phase input current at 1.732 times the equivalent three-phase line current, plus the drive's own losses. Select about 1.25 times load horsepower for hard-starting machines and 1.5 times for severe duty, then confirm against the drive manual's single-phase derating table — it caps how far up the frame range single-phase input is allowed at all.

Keep reading

  • How-to

    Wiring a three-phase coolant pump starter from a 120 V signal

    Run the machine's 120 V coolant output through the overload relay's normally closed contact to a contactor with a 120 VAC coil, and set the overload dial to the pump's nameplate full-load current — 1.8 A on a typical 1/2 HP three-phase pump, inside a 1.3–2.1 A adjustable range. Then bump-test rotation and swap any two motor leads if the pump runs backward.

    Motors and motor starters

  • How-to

    Powering a 600 V three-phase machine from 240 V single phase

    The nameplate works out to 20.8 kVA of apparent power. Fed from the single-phase shop service, that is about 87 A before converter and transformer losses, so the machine needs a rotary phase converter sized to its total demand plus a reverse-connected step-down transformer, unless tracing shows the internals run on 200 to 220 V. Verify loaded voltage balance before releasing the machine to production.

    Power distribution and transformers

  • How-to

    Wiring a three-pole contactor for a single-phase motor

    Run the single-phase current through two poles in series per the overload maker's diagram — supply to terminals 1 and 5, a link between 3 and 6, motor leads at 2 and 4 — and never parallel all three poles. Set the overload at 125% of the 6 A nameplate full-load current (7.5 A) when the service factor is 1.15 or higher or the temperature rise is 40 °C or less, otherwise 115% (6.9 A), per NFPA 70 (NEC) 430.32.

    Motors and motor starters