Short answer

Select the 300 kVA four-wire delta padmount and reject the 225 kVA unit: the center-tapped winding runs at 129% of its rating during the start on the smaller unit and 97% on the larger one. The choice holds only with a written tapped-section rating covering the start and continuous loading calculated here; otherwise use a single-phase bank or a 208Y/120 V wye secondary.

On this page
  1. Why the nameplate total is not the limit
  2. How the load divides in a center-tapped delta
  3. The equal-winding test: S >= 2 x P1 + P3
  4. Worked example: the tapped winding at start, 120 kVA single-phase and 51 kVA three-phase
  5. Winding loads and the two candidates
  6. The rating to get in writing
  7. Primary and voltage-dip checks
  8. Before the specification is released
  9. Questions asked

Buy the 300 kVA four-wire delta padmount and reject the 225 kVA unit. Total kVA is not the limit on this service: at start the arithmetic total (171 kVA) fits the smaller unit, but the center-tapped winding takes 2/3 of the single-phase load plus 1/3 of the three-phase load, which is 97 kVA against a 75 kVA winding, 129% for the 10 s start. The larger unit puts the same load on a 100 kVA winding and passes every condition: 97% at start, 73% running, 67% continuous. The selection carries one condition: the manufacturer states in writing that the tapped section carries the start figure above for the start duration and 73.3 kVA continuous. Without that in writing, use a bank of single-phase units with a larger lighting transformer, or convert the 240 V loads to 208 V and use a wye secondary.

Why the nameplate total is not the limit #

On an ordinary three-phase secondary you size by motor-start kVA against the nameplate, the way sizing a transformer for an across-the-line motor start works through the numbers. A 120/240 V four-wire delta breaks that method, because a single-phase load does not divide across the three windings the way a three-phase load does. The load schedule behind this selection:

Condition Single-phase (kVA) Three-phase (kVA) Arithmetic total (kVA)
Motor starting + continuous 120 51 171
Motor running + continuous 104 12 116
After the start (continuous only) 97 6 103

Confirm two inputs before using these numbers: every figure is kVA at the secondary at the assumed unity power factor, so if any figure is really kW, divide by the true power factor first; and the start duration comes from the motor start data, and the short-time check is only as good as that number.

How the load divides in a center-tapped delta #

A 240 V single-phase load across the tapped winding returns through two parallel paths: the tapped winding itself, and the other two windings in series. When the three windings have equal per-unit impedance and equal X/R, the split is 2/3 through the tapped winding and 1/3 through the series pair, the winding arrangement behind how center-tapped and tapped windings produce their voltages. A balanced three-phase load adds 1/3 to each winding. The 120 V loads sit across the halves of the tapped winding and load it directly, so keep them evenly split between the two halves. Connect nothing at 120 V to the high leg: it reads about 208 V to neutral, and NFPA 70, the National Electrical Code (2023 edition), which governs installation requirements, requires that conductor to be identified. Confirm the exact marking and any local amendment with the authority having jurisdiction and the equipment documentation.

The equal-winding test: S >= 2 x P1 + P3 #

If the three windings are equal, each is rated S/3. The tapped winding limits the unit, and it passes when its share of the load stays within S/3:

(2/3 x P1) + (1/3 x P3) <= S/3

Multiply through by 3 and the test collapses to one line: S >= 2 x P1 + P3, where P1 is the single-phase load and P3 the three-phase load, both in kVA, evaluated for each condition on the schedule.

Condition Arithmetic Minimum equal-winding rating
Start 2 x 120 + 51 = 291 kVA 291 kVA
Running 2 x 104 + 12 = 220 kVA 220 kVA
Continuous 2 x 97 + 6 = 200 kVA 200 kVA

The start case binds at 291 kVA. Of the two candidates, the smaller unit misses it by 66 kVA; the larger unit clears it with 9 kVA to spare.

Worked example: the tapped winding at start, 120 kVA single-phase and 51 kVA three-phase #

Inputs, all from the load schedule: single-phase load P1 = 120 kVA (motors starting plus continuous), three-phase load P3 = 51 kVA (same condition), unity power factor assumed, start duration as documented above, secondary 120/240 V four-wire delta on a 24 kV wye primary, equal windings assumed for the split.

The rule in words: the tapped winding carries 2/3 of the single-phase load plus 1/3 of the three-phase load, and the unit passes when that stays at or below S/3 of the nameplate.

The arithmetic:

  • Tapped winding: 2/3 x 120 kVA = 80 kVA, plus 1/3 x 51 kVA = 17 kVA, so 80 + 17 = 97 kVA.
  • Each other winding: 1/3 x 120 kVA = 40 kVA, plus 17 kVA = 57 kVA.
  • On the 225 kVA unit, 75 kVA per winding: 97 / 75 = 1.29, so 129%.
  • On the larger unit, 100 kVA per winding: 97 / 100 = 0.97, so 97%.

Decision: a winding above 100% of its rating for the start duration fails the selection. The smaller unit is out, the larger unit is in, and its entire start margin of 3% rests on the equal-winding assumption, which is exactly what the written rating must confirm.

Winding loads and the two candidates #

Condition Tapped winding (kVA) Each other winding (kVA)
Start 80 + 17 = 97 40 + 17 = 57
Running 69.3 + 4 = 73.3 34.7 + 4 = 38.7
Continuous 64.7 + 2 = 66.7 32.3 + 2 = 34.3
Unit Per-winding rating Start Running Continuous
225 kVA 75 kVA 97/75 = 129%, fails 73.3/75 = 98% 66.7/75 = 89%
300 kVA 100 kVA 97/100 = 97%, passes 73.3/100 = 73% 66.7/100 = 67%

The smaller unit clears the running and continuous rows and fails only the start, which is the worst kind of margin: the failure shows up on the first hard start after commissioning. The larger unit passes all three rows.

The rating to get in writing #

A three-phase padmount with a center-tapped delta secondary is not guaranteed to have three equal windings or a tapped section rated at S/3. One catalog recollection from the field puts a unit of this size at only 50 to 60 kVA of single-phase capability; catalogs change and designs differ, so treat that as a warning about what to verify, not as a number to design to. With the start case already at 97% of an equal winding, there is no room for a derated tapped section.

Ask the manufacturer for, in writing: the tapped-section kVA rating, continuous and for the start duration; the other windings' ratings; and each winding's percent impedance and X/R. Compare against the table above: the tapped-winding start and continuous figures, and 57 kVA short-time and 38.7 kVA continuous on each other winding.

The written answer The decision
Tapped section covers the start and continuous figures above Specify the larger padmount
Tapped section rated below those figures Specify a bank of three single-phase units
The 240 V loads can be converted to 208 V Specify a 208Y/120 V wye secondary and drop the center tap

For the bank, size the lighting (tapped) unit to the tapped-winding numbers above and the two power units to the other-winding numbers. Single-phase padmounts commonly run from 5 kVA to 500 kVA, and one major manufacturer's line spans 10 kVA to 167 kVA, so a lighting unit that clears the start case sits inside standard catalog ranges. On a bank of three equal units the single-phase capability works out to 2/3 of the bank total, again assuming equal per-unit impedance and equal X/R, so have the supplier confirm the split from the actual impedances.

Primary and voltage-dip checks #

The 24 kV wye primary gives 24 / 1.732 = 13.86 kV line-to-neutral, which is the winding voltage a single-phase bank connects at, line to neutral. Full-load primary line current for the larger unit is 300 / (1.732 x 24) = 7.22 A, and the 171 kVA start condition draws 171 / 41.6 = 4.11 A. The single-phase share of the load appears as phase unbalance on the primary, so give the utility the unbalanced start case, not just the kVA total, for fuse coordination on the 24 kV side.

For voltage dip, estimate the transformer-only contribution as %Z x (winding kVA loading / winding rating). At start the tapped winding runs at 97% of rating, so the dip through the transformer approaches the full nameplate %Z during the start. Read %Z from the nameplate or the test report, not from a typical-value table, and compare the result against the holding voltage of the motor contactors and the tolerance of the 120 V loads before the size is fixed.

Before the specification is released #

  • Load schedule confirmed in kVA at the secondary, with the start duration documented.
  • 2 x P1 + P3 at or under S for all three conditions, against the larger unit's nameplate.
  • Written tapped-section rating at or above the start and continuous figures above; other windings at or above 57 kVA short-time and 38.7 kVA continuous.
  • 120 V loads split evenly across the two halves of the tap, with nothing at 120 V on the high leg.
  • Utility acceptance of the unbalanced start case, and a calculated start dip inside the tightest load tolerance.
  • At commissioning, record the tapped-winding current through a motor start: it must stay under the tapped-section rated current for the start duration and settle below the continuous equivalent. De-energize, lock out and test for absence of voltage before opening the padmount cabinet or any terminal enclosure to make those connections: NFPA 70E (2024 edition) covers the electrical work practices, and your site program and the authority having jurisdiction govern the details.

Questions asked

Can the 225 kVA padmount be rescued for this load?

Not on equal windings: during the start the tapped winding runs at 129% (97 against 75 kVA). Running (98%) and continuous (89%) both pass, so the only rescue is a written short-time rating covering the start case, and repeated starts at 129% accumulate winding heating a single start figure alone does not show. Get that letter before ordering.

Why does the tapped winding take 2/3 of the single-phase load?

The 240 V load returns through two parallel paths: the tapped winding, and the other two windings in series. With equal per-unit impedance and equal X/R, the series pair has twice the impedance of the single winding, so it takes half the current of the tapped winding, which is a 2/3 to 1/3 split. Unequal impedances shift the split, which is why the written rating decides.

What if the tapped section is only rated 50 to 60 kVA?

Then the start case fails by a wide margin and nothing on the load side fixes it. Move to a bank of three single-phase units with the lighting unit sized to the tapped-winding start and continuous figures, or convert the 240 V loads to 208 V and use a 208Y/120 V wye secondary, which shares load evenly across the windings.

Is the tapped-winding start figure exact?

It is conservative. The single-phase and three-phase components are not in phase in the tapped winding, so their arithmetic sum overstates the true vector loading. Use the arithmetic sum unless the motor-start power factor is known; with it, the vector sum reduces the tapped-winding demand.

What do the 120 V loads do to the sizing?

They load the tapped winding directly, half on each side of the tap. Keep them evenly split, because an uneven split overheats one half of the winding while the winding-total figures still look acceptable, and keep them off the high leg, which sits near 208 V to neutral.

Keep reading

  • How-to

    Powering a 600 V three-phase machine from 240 V single phase

    The nameplate works out to 20.8 kVA of apparent power. Fed from the single-phase shop service, that is about 87 A before converter and transformer losses, so the machine needs a rotary phase converter sized to its total demand plus a reverse-connected step-down transformer, unless tracing shows the internals run on 200 to 220 V. Verify loaded voltage balance before releasing the machine to production.

    Power distribution and transformers

  • Selection guide

    Sizing a three-pole breaker for a single-phase transformer

    Use the real primary current, 10 kVA x 1000 / 480 V = 20.83 A, not the 36.1 A a phantom balanced 30 kVA three-phase load gives. NFPA 70, 2023 edition, Table 450.3(B) permits 125% plus the next standard rating, so a 30 A two-pole breaker is the pick. A three-pole breaker of the same rating works only where its listing allows two-pole use, or with two poles in series on a differential-trip device.

    Protection: breakers, fuses and SCCR

  • Selection guide

    Sizing a transformer for a 200 HP across-the-line motor start

    Select a 1000 kVA transformer with nameplate impedance of 6.5% or less. The 3 kVA-per-HP rule gives 600 kVA for the 200 HP pump alone; adding 390.9 kVA of always-on load gives 990.9 kVA, so that is the screening size. The dip screen confirms it: 8.8% sag at 5.75% impedance, inside the 10% target, while 750 kVA would need 4.9% impedance to pass.

    Power distribution and transformers