Short answer

The continuity groups T7-T8-T9, T1-T4, T3-T6 and T2-T5 identify a single-voltage 480 V Y-YY motor as a 1Y start / 2Y run part-winding machine, whose start contactors alone must spin an unloaded shaft. No rotation with them closed means reversed lead terminations, a blown fuse or an open contactor pole; once it spins, a failed RPM switch can still hold it in the start stage.

On this page
  1. What does continuity between T7, T8 and T9 tell me about this motor?
  2. Will the two start contactors spin the motor with no load?
  3. Why won't the motor turn even though every winding checks good?
  4. How do I find a blown fuse or open contactor pole in the start stage?
  5. When are the accelerating contactors supposed to close?
  6. Could this nine-lead motor really be a two-speed machine?
  7. What order do I run these checks in?
  8. Questions asked

Continuity groups of T7-T8-T9, T1-T4, T2-T5 and T3-T6 on a single-voltage 480 V nameplate marked Y-YY identify a 1Y start / 2Y run motor: a part-winding-type machine whose stator is built as two sets of three winding sections. One set must spin the uncoupled shaft by itself, so start contactors that close without rotation point at the start power path - on the job that prompted this article, two motor leads were landed reversed at the starter panel. Correct the terminations to the motor connection diagram, then prove full line voltage through each commanded contactor before suspecting the acceleration stage. Once the shaft turns, the accelerating contactors still wait for a minimum-RPM signal, and there a failed proximity switch kept the starter in the start stage after the wiring was already right.

What does continuity between T7, T8 and T9 tell me about this motor? #

Continuity among T7, T8 and T9 - with that group open to the other six leads, and T1-T4, T2-T5 and T3-T6 each reading one winding section - is the signature of a two-set stator: the 1Y start / 2Y run part-winding machine.

Work with the motor dead: open the disconnect, lock it out, and test for absence of voltage at the terminal blocks before separating anything. The nine leads land on three terminal blocks in the panel while six contactors, C1 through C6, do the switching; those are different components, not conflicting counts. Separate all nine leads and read resistance between every pair on the meter's lowest ohms range, with the test-lead resistance nulled first:

  • T7 to T8, T7 to T9 and T8 to T9 all read continuous, and that group reads open to every lead from T1 through T6.
  • T1 to T4, T2 to T5 and T3 to T6 each read one winding section.
  • No other combination reads.

Illustrative worked example, with the inputs stated: at this frame size a winding section reads well under 0.1 Ω, so call each section 0.08 Ω. T1 to T4 then reads 0.08 Ω, while T7 to T8 reads 0.08 Ω + 0.08 Ω = 0.16 Ω, because that path runs through two sections meeting at the internally tied wye point. The two-to-one pattern, not any absolute number, is the identification: three sections with all six ends brought out, plus three more sharing one internal wye point.

One check keeps this honest: a 230/480 V dual-voltage wye motor shows the same four groups, because it uses the same two-sections-per-phase build. The nameplate separates them - this motor lists a single 480 V rating, a Y-YY connection and the current pair 30 A / 93 A, which is the staged-start machine, not a dual-voltage one.

Will the two start contactors spin the motor with no load? #

Yes - with the belt off, one full-voltage wye is enough to break away and accelerate the shaft, so start contactors that close without rotation mean a start-path fault, not a motor too weak to start.

In the start stage the contactors assemble one wye and energize it at full line voltage; for run they parallel the second wye beside it, which is the 2Y connection. Manufacturers build these stators as two halves of three windings each, connected Y/YY or Δ/ΔΔ, so a starter can bring them in two steps - that is the part-winding family. An uncoupled shaft needs only bearing-friction and windage torque, and one energized set covers that many times over; on this job the motor spun on the start command as soon as the reversed leads were corrected.

Two limits keep that statement honest. Some part-winding motors are documented as not designed to fully accelerate on the start connection alone; when that applies, the motor's own connection diagram says so, so read it before judging a start stage that only partly speeds up under load. And the start stage lives on its timer, not on your patience: a shaft that hums without turning gets diagnosed, not restarted over and over.

Why won't the motor turn even though every winding checks good? #

Because continuity proves each section is intact, not that the nine leads sit in the right order; two leads landed reversed at the starter panel reverse one phase, and the motor hums without turning.

The ohmmeter sees copper, not order. On this job the group readings looked right while two of the nine leads were terminated reversed at the panel. Land one phase's lead in another phase's position, or reverse one phase end-for-end, and the three windings stop building a rotating field: loud hum, heavy current in that stage, no breakaway - the same picture single-phasing gives.

The fix is comparison, not trial and error. Set the motor's connection diagram beside the panel and land every T-number where the drawing puts it, including the strap that completes the first set's wye at T4, T5 and T6. Never swap motor leads to chase rotation: if the corrected motor runs backward, any two phase swaps reverse a three-phase motor, and that swap belongs on the line side.

How do I find a blown fuse or open contactor pole in the start stage? #

Measure line-to-line voltage in and out of every commanded contactor: a stage with full line voltage on the line side and 0 V on one phase at the load side has an open fuse, pole or lug in that phase.

These are energized measurements inside a live 480 V starter: a qualified person makes them, with a properly rated meter, under the site's electrical safe-work program - NFPA 70E, 2024 edition, sets the US framework for that work, and requirements differ by country and authority having jurisdiction. Hands-on repairs happen only after lockout and a fresh test for absence of voltage.

  • Confirm the supply at the line side: nominal 480 V phase-to-phase on all three pairs.
  • Command the start stage, then measure the load side of each start contactor and the motor terminals.
  • Line voltage in and 0 V out on one phase marks the open element - fuse, pole or lug; repair it dead.
  • All three phases present at the motor with the contactors closed and still no rotation sends you back to lead order, or to the motor itself.

One good reading at the panel supply proves nothing about the path beyond it; each commanded stage gets measured at its own terminals.

When are the accelerating contactors supposed to close? #

After the controller sees its minimum shaft RPM - on this starter, from a proximity switch counting a target on the shaft - so accelerating contactors that stay open while the motor spins are telling you the speed input is dead, not the power path.

The reported sequence from this panel:

Reported stage Contactors What to prove
Starting C3 and C5 Both close on the start command and the shaft turns
Accelerating C4 and C6 Commanded only after the RPM condition is satisfied
Running C1, C5 and C6 The full 2Y connection is assembled
Braking C3 and C5 Compared against the machine's braking circuit

C5 shows up in starting, running and braking, so a combination list can never set contactor timing - the machine's sequence drawing does that. On this machine the proximity switch had failed, so the motor spun in the start stage and never transitioned. Watch the controller input with the shaft turning: if it never changes state, fix the switch circuit - mounting, gap to the target, wiring, then the device itself, replaced with the specified part. If it toggles and the acceleration command still never comes, the configured threshold and the sequence logic are next, per the controller documentation. Either way, open accelerating contactors with an unsatisfied speed condition are not a power fault. A staged starter that clears the start stage and then faults at the changeover is a different failure class altogether - a star-delta starter tripping its breaker at transition fails there for related reasons.

Could this nine-lead motor really be a two-speed machine? #

Not this one: the plate reads single voltage 480 V with a Y-YY connection and the current pair 30 A and 93 A, and the panel runs a timed start-brake-run sequence - a multi-speed machine shows its speeds on the plate and gets a speed selector, not a starting sequence.

Nine-lead motors do appear in Dahlander-type multi-speed line-ups, and those nameplates also say Y-YY, so the question is fair. Three things settle it here. The currents sit against the connections, 30 A with Y and 93 A with YY - two states of one speed, not two speeds. The panel's sequence is a timed start with an RPM-based transition and a braking pair, which is a starting method. And multi-speed schemes count contactors differently: a Dahlander-type line-up uses its line contactors plus a star-point contactor, three plus one in the common arrangement. Multi-speed machines also fail in their own ways - a three-speed motor trips its breaker on high speed when the high-speed step is the problem, not the start method. If your plate lists two speeds, wire to its speed scheme instead and this article stops applying.

What order do I run these checks in? #

Identify the motor from its groups first, then fix the start path, then chase the transition - in that order, because every later check assumes the earlier ones are true.

  1. Lock out, verify absence of voltage, separate the nine leads and read the groups; name the connection from the groups plus the nameplate.
  2. Compare every termination with the motor connection diagram and correct reversed leads - two were reversed at this panel.
  3. Restore, command the start stage and watch the shaft: if it turns, jump to step 5.
  4. Measure line voltage in and out of the commanded start contactors and at the motor terminals; fix the open path and confirm direction of rotation.
  5. With the motor spinning, watch the RPM input; repair the switch circuit or the threshold so the accelerating contactors come in.
  6. Prove the full sequence - start, accelerate, run and brake - against the machine's sequence drawing before handing it back.
Symptom Most likely cause Confirming check
Start contactors close, shaft hums, no rotation Reversed or crossed lead terminations at the panel Every T-number against the motor diagram
Start stage commanded, one phase dead at the motor Blown fuse, open contactor pole or bad lug Line voltage in, 0 V out across the open element
Motor spins in start, never transitions Speed input not reaching the controller Watch the proximity-switch input with the shaft turning
Input toggles, acceleration command never comes Threshold or sequence logic in the controller Controller configuration for the RPM condition

Questions asked

Which nameplate current do I set the overload relay to on a Y-YY motor?

Set the running stage's overload from the current the nameplate pairs with the YY connection - on this plate that is 93 A, and the 30 A value belongs to the Y connection. Overload settings come from the nameplate full-load current, not from a table: NFPA 70, the National Electrical Code, 2023 edition, covers motor branch circuits in Article 430, so confirm the setting with your authority having jurisdiction and the motor documentation.

How long can the motor stay on the start connection?

No longer than the starter's transition allows. The start stage pushes starting current through part of the winding, and some motor diagrams state outright that the motor is not designed to fully accelerate on the start connection alone. If the shaft has not broken away by the time the start-stage timer runs out, stop, find the fault, and do not keep cycling the start command into a stalled winding.

Can I close both winding sets at once and skip the staged start?

You can, but you have then built an across-the-line start. Energizing both sets together puts full locked-rotor current on the line, which is exactly what the Y-YY staging was chosen to avoid, and the controller's speed interlock will still block the sequence. Fix the start path and the speed input instead of defeating the staging.

How is this motor different from a 230/480 V dual-voltage nine-lead motor?

Internally they look alike, because both are built as two winding sections per phase, so the ohmmeter groups can match. The nameplate separates them: a dual-voltage motor lists two voltages with one full-load current each, while this plate lists a single 480 V rating, a Y-YY connection and the 30 A / 93 A pair. Trust the plate, then wire to its connection diagram.

What if T7, T8 and T9 do not show continuity to each other?

Then test for the delta-start version: check whether T1, T4 and T9 form one group and stay open to T7. If they do, you have a 1 delta start / 2 delta run machine, with 1-12, 2-10 and 3-11 joined internally. These are uncommon, but the same rule applies - land every lead exactly where the motor's connection diagram shows it.

Keep reading

  • Troubleshooting

    Why a static phase converter won't start a lathe motor

    A lathe motor that crawls and never accelerates on a static phase converter is producing torque at the square of the voltage ratio: wired for its 440 V rating and fed 230 V it delivers about 27 percent of rated torque — enough to creep, not enough to accelerate the headstock. Verify the winding connection at the motor before blaming the converter; if the connection is right, the converter is at the top of its range on a hard-starting load.

    Motors and motor starters

  • Explainer

    Running a three-phase motor on single-phase 208 V

    Yes — a spinning three-phase motor fed across two terminals regenerates the third leg, but winding heating caps it near 30-40% of rated horsepower, so it is a bench trick, not a supply. For real loads, use a rotary phase converter with an idler at least the next size above the largest motor, or a single-phase-input VFD for motors only — never a drive for amplifiers or power supplies.

    Motors and motor starters

  • Selection guide

    Setting overload relays for high-inertia motor starts

    Set the current dial at the motor's nameplate full-load current and buy starting time with the trip class, not with a higher setting: Class 10 holds starts up to about 7 s at 600 percent, Class 20 to about 14 s, Class 30 to about 21 s. Longer starts need reduced-current starting, not a bigger relay.