Explainer
What sets the cable size for a 4160 V motor
Short answer
For a motor over 600 V, NEC 430.224 requires conductor ampacity not below the overload protective device setting, and that setting comes from the motor protection design, not a fixed 125% default. On a worked 1000 hp, 4160 V example the load needed only 3×35 mm², but a 20 kA fault cleared in 0.1 s pushed the copper XLPE cable to 3×50 mm², so short-circuit withstand governed.

On this page
For a motor over 600 V, two checks set the cable, and the NEC states only the first. NEC 430.224 requires the conductor ampacity to be not less than the setting of the motor overload protective device; that setting is an output of your motor protection design, not a code-mandated 125%. The second check, short-circuit withstand against the available fault current and the clearing time, is what usually picks the cross-section at 4160 V. On a worked 1000 hp example, the load current was satisfied by 3×35 mm², but the fault duty pushed the copper XLPE cable to 3×50 mm². Run both checks and let the larger answer win.
What NEC 430.224 actually requires #
NFPA 70, the National Electrical Code, 2023 edition, 430.224, covers conductors supplying motors rated over 600 V: their ampacity must be not less than the setting of the motor overload protective device. That is the entire load-side requirement — one comparison, corrected conductor ampacity against the selected setting. Confirm the clause numbering against the edition adopted locally and with the authority having jurisdiction, since this section was renumbered between editions.
It is a different rule from the 125% multiplier applied to low-voltage motor branch conductors, which the article on whether the NEC requires 125% ampacity for motor conductors covers. The code deliberately does not fix the setting for you: 430.224 points at the overload protective device you select, so the number you compare against is the pickup the protection engineer actually sets in the relay. During design, before any protection study exists, use 125% of the estimated full-load current as a labeled placeholder and replace it with the study's real pickup before release. Never move the pickup to make a cable pass — motor thermal protection and conductor protection are separate decisions that both have to stand.
Where the overload setting comes from #
The setting is an output of the motor protection design. A multifunction motor relay on a 4160 V machine typically gets its overload pickup somewhere in the 105% to 125% range of nameplate FLA, depending on the motor's thermal capacity, its starting duty and its service factor. One documented 4 kV pump-station installation ran its relays near 105% of FLA, and the reviewing engineer accepted cables whose ampacity exceeded that number; other designs calculate 125% of FLA as the maximum expected setting. Both are legitimate outcomes of a protection philosophy, not universal defaults.
When you read the setting off the relay or the coordination study, confirm what the value is: pickup, final trip current, or a thermal limit curve. Only the current value the protective device will actually allow corresponds to the setting 430.224 refers to.
Worked example: a 1000 hp, 4160 V motor on buried 6/10 kV XLPE cable with a 20 kA fault #
Inputs, with their source:
- Output power 1000 hp = 746 kW — the design case.
- Line voltage 4160 V, three phase — the design case.
- Efficiency 0.9 and power factor 0.9 — stated assumptions for a preliminary estimate; replace with nameplate values.
- Installation: buried 6/10 kV XLPE cable in soil of thermal resistivity 1 K·m/W at 20 °C, depth 0.7 to 1.2 m — the VDE 0298 reference conditions.
- Initial symmetrical short-circuit current I"k = 20 kA, clearing time 0.1 s — from the protection coordination assumptions.
The load current, in words: line current equals the output power divided by the product of √3, the line voltage, the efficiency and the power factor.
I = 746,000 W / (1.732 × 4160 V × 0.9 × 0.9)
The denominator: 1.732 × 4160 = 7205, and 7205 × 0.81 = 5836.
I = 746,000 / 5836 = 127.8 A.
Load check: under the stated VDE 0298 burial conditions, a 3×35 mm² 6/10 kV cable carries this current — sufficient on load alone.
Fault check: the adiabatic withstand rule gives the minimum section S = I"k × √t / k, with k the constant for copper XLPE at its permitted final temperature, the IEC 60986 method. First I"k × √t = 20,000 A × √0.1 s = 20,000 × 0.316 = 6325 A·√s. Applying the copper-XLPE constant for a 200 °C final temperature — the basis explained in calculating the XLPE cable short-circuit temperature at 200 °C — gives a minimum of 48 mm².
Result: 3×50 mm² is the smallest standard size above the minimum, and under the same burial conditions its admissible current is 210 A.
Overload check: the cable satisfies 430.224 for any setting up to its ampacity — 1.64 times the load current, and above even a 125% pickup of 159.8 A.
Decision: install 3×50 mm². The governing threshold is the fault withstand: at 20 kA cleared in 0.1 s, anything smaller fails before the ampacity comparison is reached, and the load check alone would have wrongly accepted 3×35 mm².
Why fault withstand governs at medium voltage #
At 4160 V the current is small for the horsepower, so the cross-section a load check selects is thin, while the fault level at the switchgear is set by the supply transformer and not by the motor. Two variables move the answer. The clearing time enters under the square root, so slow backup clearing grows the cable faster than intuition suggests; use the time the coordination study actually supports. The constant k depends on the conductor material, the temperature before the fault and the permitted final temperature, which is why the withstand calculation needs the cable manufacturer's data rather than a generic table.
Keep the cable's rated short-time withstand current, Icw, distinct from the prospective fault current I"k at the terminals — the difference between the cable's capability and the duty you impose on it is explained in IEC Icw vs Ik short-circuit thermal withstand current. The low-voltage equivalent of this check, where a fuse's let-through energy sets the duty, is covered in sizing cable withstand with fuse total I²t let-through.
Releasing the design #
Close out the placeholders in this order:
- Replace the estimated current with the motor's nameplate FLA at the actual voltage.
- Freeze the relay overload pickup from the coordination study and note whether the value is pickup or final trip.
- Obtain the ampacity for the real route — duct bank, grouped cables, soil, ambient — from the cable manufacturer, and confirm it exceeds the pickup.
- Run the withstand check with the study's available fault current and clearing time, and pick the smallest standard size above the result.
- After commissioning, verify the installed relay setting against the approved sheet: de-energize, lock out and test for absence of voltage before opening the relay or cable compartment.
If steps 2, 3 or 4 disagree — a pickup the cable cannot carry, or a fault duty the cable cannot withstand — resolve it in the protection design before anything is installed. The preliminary numbers above are an estimate to be checked against the governing code and the equipment documentation; the decision they support, fault withstand before ampacity at this voltage class, does not change.
Questions asked
Can I assume 125% of FLA for the overload setting during preliminary cable sizing?
Yes, as a labeled assumption. Multiply the estimated full-load current by 1.25 and require the cable ampacity to exceed it; on the worked example that is 1.25 × 127.8 A = 159.8 A, comfortably under the selected cable's rating. Replace the placeholder with the protection study's actual pickup before releasing the design.
How does a longer clearing time change the required cross-section?
The minimum section scales with the square root of the clearing time. Hold the example's fault level and stretch clearing from 0.1 s to 0.4 s and the root of time doubles, so the 48 mm² minimum roughly doubles toward 96 mm², and the next standard size above that applies. A slower backup protection setting always grows the cable.
Does a lower overload pickup, say 105% of FLA, let me use a smaller cable?
Usually not at medium voltage. A lower pickup only relaxes the ampacity comparison; the short-circuit withstand check is independent of the overload setting and still fixes the minimum cross-section. On the worked example the fault duty set 3×50 mm² whether the relay picks up at 105% or 125% of FLA.
What does the constant in the withstand formula depend on?
Conductor material, the conductor temperature before the fault, and the maximum temperature the insulation tolerates at the end of it. Copper XLPE calculations commonly use a 200 °C or 250 °C final temperature, and the constant differs for each, so take it from the cable manufacturer's short-circuit data rather than a table written for another insulation.