Short answer

Fault each side of the generator breaker as its own bus. The switchgear-side bus takes the breaker's trip time; the generator-side bus has no protective device in its source path, so it takes a fixed study clearing time, commonly 2 s, recorded as a study input. Run both cases and label the equipment with the higher incident energy; when the two results tie, name the line-side device on the label.

On this page
  1. Why the generator side has no clearing time
  2. Model the two sides as separate buses
  3. Where the fixed clearing time comes from
  4. Compare duration with current: a worked example
  5. Which case sets the label
  6. Three practices that corrupt the study
  7. Questions asked

When you fault the switchgear side of the generator breaker, the software reads the breaker's trip curve and returns an incident energy. When you fault the bus between that breaker and the generator, it returns nothing, because no overcurrent device sits in the path from the generator terminals to that point. The fix is not to move the fault or to borrow the breaker's time. Model the two sides as separate buses, give the generator-side bus a fixed study clearing time — 2 s is the common choice where no device-based time exists — run both cases, and label the equipment with the higher incident energy. When the two results tie, put the line-side case on the label so it names a real upstream protective device.

Why the generator side has no clearing time #

Trace a separate current path from every energized source to each candidate fault point. In a cogeneration tie-up, the sources are the utility through its fuse and the generator through its breaker. For a fault on the switchgear bus, both sources have an interrupting device in their paths: the utility device for the utility contribution and the generator breaker's 50/51 functions for the generator contribution. The software can read each trip characteristic and compute a clearing time.

For a fault on the bus between the generator breaker and the generator, the generator leg has no device at all. The conductor runs from the generator terminals straight to the fault point. Opening the generator breaker is what isolates that bus in the field, but the study tool assigns clearing times by finding a protective device between each source and the faulted bus, and from the generator's side of the breaker there is none to find. An arc-flash program such as ETAP computes incident energy from the protective device it can associate with the faulted bus; with no device on that leg, it reports no clearing time and no result. The same source-to-fault path logic is what sets clearing times for a transformer secondary, as covered in what clearing time applies to a transformer secondary arc.

Model the two sides as separate buses #

Place one bus on the switchgear side of the generator breaker and a second bus on the generator side. Do not try to make one bus represent both, because each side needs a different clearing mechanism.

  • Switchgear-side bus. Associate the generator breaker and its installed 50/51 trip settings with the generator contribution, and let the utility-side device carry the utility contribution. Verify that the modeled pickup and time-dial settings match the trip unit actually installed, not the datasheet defaults.
  • Generator-side bus. Enter a clearing time that does not depend on a trip curve, because none is reachable from that source path.

Run every credible operating configuration too: generator online and exporting, generator offline, utility open. The governing case can change with the source combination, and the label must cover the configuration that produces the highest incident energy for the equipment as it can actually be operated.

Where the fixed clearing time comes from #

In ETAP, double-click the generator-side bus, open its arc flash tab, and select a fixed fault clearing time. ETAP's own arc-flash documentation describes limiting incident energy on the basis of a protective-device maximum fault clearing time such as two seconds, and 2 s is the value engineers commonly enter when no device-based time exists. If the generator controller performs a documented trip-and-shutdown sequence, enter its total documented time instead, including everything that actually stops the contribution, not only the pickup. Either way, record the value and its reason in the study assumptions.

That entry is a study input, not a statement that the arc burns for that long. It bounds the calculation so the software can produce a number. NFPA 70E, the 2024 edition, requires an incident energy analysis as part of the electrical safety program; it does not supply a clearing time for a bus with no protective device, so confirm your chosen basis with the authority having jurisdiction.

Compare duration with current: a worked example #

Do not rank the cases by available fault current alone. Incident energy depends on arcing current and arc duration together, and the generator case wins on duration. The following inputs are illustrative, chosen to show the arithmetic; read the actual arcing currents and times from your own study.

  • Switchgear-side case: 14,000 A arcing current, cleared by the generator breaker's instantaneous function in 0.1 s. Total arcing exposure: 14,000 A × 0.1 s = 1,400 A·s.
  • Generator-side case: 6,000 A arcing current, sustained for the full fixed time of 2 s. Total arcing exposure: 6,000 A × 2 s = 12,000 A·s.

The lower-current case carries roughly nine times the arcing exposure. Incident energy methods such as IEEE 1584 scale energy with arcing current raised to a positive exponent and directly with duration, so the long, small arc can govern the label. Get the actual incident energy from the software's arc-flash calculation for each case; the ampere-second product above is a screening comparison, not an energy figure.

Two generator behaviors push this further. Generator fault current decays over the first cycles after the fault, which changes both the arcing current and the device operating point — see how generator fault-current decay is handled in arc flash studies. And because the generator voltage also collapses during the fault, generator protection frequently uses voltage-restrained overcurrent so the pickup follows the voltage, as explained in why voltage-restrained 51V protection handles fast fault-current decay. A decaying, lower arcing current can land on a slower portion of the breaker curve, lengthening the arc further. Choosing which bolted fault current to carry into each study case is its own decision, covered in which bolted fault current to use for breaker duty and arc flash.

Which case sets the label #

Run both buses, in every credible source configuration, and take the higher incident energy of the two results for the equipment label. When the results are equal, use the line-side case so the label's protective-device entry names a real upstream device with a real clearing basis. Check that the summary table, the report, and the printed label all reference the same case, and that the generator-side result shows the fixed time you entered rather than a borrowed device time.

Three practices that corrupt the study #

  • Adding a fictitious device. Inserting a protective device with a curve set beyond any credible operating range can force the software to return a number, but it falsifies the coordination study and hides the real problem: nothing on that leg clears the arc. Enter the fixed time instead.
  • Borrowing the generator breaker's time. The breaker may be called the generator breaker, but for a fault on the generator side it is not the device that removes the generator contribution from the software's source-to-fault path. Its curve belongs to the switchgear-side bus.
  • Treating the fixed entry as an equipment rating. It is a calculation boundary you imposed. Note it in the assumptions, and revisit it if a documented generator shutdown sequence later gives you a defensible device-based time.

One safety note: the incident energy result supports personal protective equipment selection under NFPA 70E, 2024 edition, and it is not permission to work energized. De-energize, lock out, and verify absence of voltage before opening any enclosure in this line-up, and confirm the labeling and analysis requirements with the authority having jurisdiction and the equipment documentation.

Questions asked

Does the fixed 2 s entry mean the arc physically burns for two seconds?

No. It is a calculation boundary entered on the bus so the software can return an incident-energy number when no protective-device time exists. A real arc inside an enclosure often self-clears faster through electrode separation or conductor damage, but nothing in the study proves that, so the entry belongs in the documented assumptions rather than in any claim about measured clearing time.

Can I use a shorter time if the generator controller trips the breaker on a fault?

Yes, if the time is documented. Use the total sequence the controller performs: pickup delay, breaker operating time, and any excitation or fuel removal that actually stops the generator contribution. Take the numbers from the controller and breaker documentation, enter the total as the clearing time, and record which sequence it represents. Do not enter the controller pickup alone if pickup is not what de-energizes the fault.

Why can the lower-current generator case govern the label?

Incident energy scales with arcing current and with duration. A generator contribution is smaller than a utility contribution, and a smaller arcing current can sit below the instantaneous pickup of the generator breaker, so the device clears on a much slower part of its curve or not at all. A few thousand amperes sustained for seconds can release more energy than a larger current cleared in cycles.

What goes on the label when the two sides produce equal incident energy?

Use the line-side case. An equal result means either case could stand, but the line-side case lets the label name a real upstream protective device and its clearing basis. That keeps the label consistent with the equipment a worker would actually see opened, and it avoids printing a device-side reference that points at equipment with no protective function for that fault.

Keep reading

  • Explainer

    How an overdutied breaker changes your arc flash study results

    A 25 kA breaker with 32 kA available fails the interrupting-rating requirement of NEC 110.9, but it voids an arc-flash result only where that result credits the breaker with clearing the modeled arcing current. In that case, take the clearing time from the next upstream device, rescale the incident energy, relabel, and replace the breaker.

    Electrical safety and codes

  • Explainer

    IEEE 1584-2018 fault current range limits above 600 V

    Above the 600 V band edge the IEEE 1584-2018 model was verified only to 65 kA of bolted fault current, so a 690 V bus at 70 kA sits outside the documented range by 5 kA. Run the range check, keep the IEEE result as a labeled out-of-range sensitivity case, cross-check the Ralph Lee method, and use the higher incident energy for PPE until an engineer signs the method decision.

    Electrical safety and codes

  • Explainer

    NFPA 70E table limits for operating switchgear breakers

    NFPA 70E's table method is bounded by available fault current, clearing time and working distance, not by the main breaker's ampere rating. A large continuous rating alone does not put switchgear outside the tables; the real gate is the calculated fault duty and the clearing time of the device that clears. When either exceeds the table limits or cannot be determined for lack of data, the compliant routes are the normal-operation exception for door-closed switching and an incident energy analysis of that switchgear.

    Electrical safety and codes