Short answer
Connect a star-delta starter's power factor correction bank on the line side of the contactors, never at the motor terminals of an open transition, with its own Article 460 disconnect, overcurrent protection and conductors at 135 percent of capacitor current. If the bank must sit downstream of the overload relays, route its leads through the sensing elements or resize the relays to the reduced current.
On this page
- Where should a capacitor bank connect on a star-delta starter?
- Why is a motor-terminal bank dangerous on an open transition?
- What does the NEC require for power factor capacitors on a motor?
- Do the overload relays still see the full motor current?
- How do you size the capacitor bank and its conductors?
- How do you install and verify the capacitor connection?
- Can capacitors fix wye-delta switching transients?
- Questions asked
Put the power factor correction bank on the line side of a star-delta starter, ahead of the main contactor, and never on the motor terminals of an open-transition starter. Line-side connection keeps the bank out of the open interval between the star and delta contactors, which is where a terminal-connected bank turns a rough transition into a damaging one, and it leaves the overload relays reading the full motor current. The bank then needs its own disconnect, overcurrent protection and conductors sized to NFPA 70 Article 460 at 135 percent of the capacitor's nominal current. If the starter's diagram forces the bank downstream of the overloads, route its leads through the overload sensing elements or resize the relays to the reduced measured current.
Where should a capacitor bank connect on a star-delta starter? #
On the line side of the starter's contactors, ahead of the main contactor, so the bank stays on the supply through the open transition and never sits across the coasting motor; give the bank its own Article 460 disconnect, overcurrent device and conductors.
Line side means the terminals where the feeder lands — the L1, L2, L3 side of the enclosure — ahead of the main contactor's load terminals and ahead of the star and delta contactors entirely. Connected there, the bank is a steady plant load: it feeds reactive current to the supply whenever the feeder is energized, and no contactor in the starter ever opens a path between the bank and the source.
That one placement settles both failure modes this article covers: the bank is never across the motor during the open interval, which is the transient problem in the next section, and its current never joins the motor leads downstream of the overload relays, which is the protection problem further down. Before landing any lead, trace what each pole actually switches; if the starter's drawing is gone, identifying unknown terminals on a NEMA size 1 motor starter follows the same contact-by-contact method this trace needs.
Why is a motor-terminal bank dangerous on an open transition? #
Because the bank stays across the windings while the open interval leaves the motor spinning unpowered: it holds the residual voltage up, and when the delta contactor closes out of phase the mismatch lands on the bank and motor together as current, voltage and torque spikes.
An open-transition starter opens the star contactor and waits before the delta contactor closes, and through that interval the windings carry no current. The shaft keeps turning, so residual rotor magnetism generates a voltage whose frequency follows speed — below line frequency as the machine slows — and whose phase relative to the supply is whatever the slowdown leaves it. When the delta contactor closes, line and generated voltage add or buck depending on that random phase, the magnetic circuit must rebuild its flux from near zero, and the result is an inrush comparable to a full-voltage start, a dip on the bus, and a torque shock on the shaft and coupling.
A bank on the motor terminals sits through all of it. It feeds reactive current to the coasting machine, holds the residual field up, and has stored energy to dump at the reconnection instant, which makes the event both more likely and more severe. A bank on the line side never sees any of this because no contactor separates it from the source. If a transition is already breaking couplings or tripping upstream devices, measuring wye-delta voltage transients safely covers how to capture the switching event and put a number on the spike before and after any change.
What does the NEC require for power factor capacitors on a motor? #
NFPA 70, the National Electrical Code (2023 edition): Article 460 sizes the bank's disconnecting means, overcurrent protection and conductors at not less than 135 percent of the capacitor's nominal rated current, and 430.27 sends the conductors of capacitors installed in motor circuits to 460.8 and 460.9.
Article 460 covers capacitor installations generally and never names a star-delta starter, which is exactly why a search through it finds nothing about placement. The code's job is the bank's own equipment: disconnecting means, overcurrent protection and conductor sizing, all tied to the 135 percent figure above. The placement decision comes from the switching physics in the previous section and from the starter manufacturer's wiring diagram; 430.27 is the article that pulls capacitor conductors in motor circuits into Article 460's requirements.
Keep the two conductor rules apart. The motor's branch-circuit conductors stay sized from the Article 430 motor tables, the rules worked through in NEC motor branch circuit conductor sizing; Article 460 governs only the leads that feed the bank. Editions and local amendments shift details, so confirm the adopted edition with the authority having jurisdiction and the bank's installation instructions before roughing anything in.
Do the overload relays still see the full motor current? #
Not if the bank lands downstream of the relays and its leads bypass the sensing elements: in the worked example below the relays would carry about 1170 A while the motor still draws 1310 A, so route the bank's leads through the sensors or resize the relays.
A relay protects the motor by heating to the current the motor takes. With correction in the circuit, part of that current arrives from the bank instead of the line; when the bank's conductors join downstream of the relay poles, the relay reads only the line share and the motor's heating is unchanged. In the example below the relays would miss about 11 percent of the real motor current. Three arrangements cover every case:
- Bank upstream of the relay poles — the line-side placement already does this. The relays carry the full line current and are selected from the motor nameplate full-load current as always. No resize.
- Bank downstream with its leads passed through the relay sensing elements, in the polarity the relay manufacturer shows, so the elements register line and capacitor current together. The original selection still protects the motor. Follow the starter and relay manufacturers' method for the routing.
- Bank downstream with its leads bypassing the sensors — resize the relays to the reduced measured current, 0.89 times nameplate in the example, so the element that heats matches the current it actually carries at full motor load.
Star-delta adds one wrinkle: relays mounted in the motor windings instead of the main lines carry 1/√3 = 0.58 times line current in the delta run, so their selection starts from 0.58 times nameplate before any capacitor effect is layered on. Take the mounting location from the starter's diagram, not from the layout of the enclosure.
How do you size the capacitor bank and its conductors? #
Compute the kvar from your power-factor target, convert it to capacitor current at line voltage, then size the leads, disconnect and overcurrent device at 135 percent of that current: a 120 kvar bank at 208 V draws 333 A, so each of the three must carry at least 450 A.
Everything below is an illustrative example with assumed inputs; take your own from the nameplate, the bank datasheet and a measured plant power factor.
- Inputs: 3-phase, 208 V motor, 500 HP output, assumed 93 percent efficiency and 0.85 lagging power factor at full load; target power factor 0.95.
- Input power: 500 HP × 746 W/HP = 373,000 W output; 373,000 W ÷ 0.93 = 401 kW input.
- Full-load current estimate: I = 373,000 W ÷ (1.732 × 208 V × 0.93 × 0.85) = 373,000 W ÷ 284.8 = 1310 A.
- Required kvar: kvar = kW × (tan φ1 − tan φ2), with φ1 = arccos 0.85 = 31.8° (tan 0.620) and φ2 = arccos 0.95 = 18.2° (tan 0.329). kvar = 401 × (0.620 − 0.329) = 401 × 0.291 = 116.7 kvar, so order the next standard step, 120 kvar.
- Capacitor current: I_C = 120,000 var ÷ (1.732 × 208 V) = 120,000 ÷ 360.3 = 333 A.
- Article 460 minimums: conductors, disconnecting means and overcurrent device each sized at 1.35 × 333 A = 450 A.
- Sanity check on the correction: real component 1310 × 0.85 = 1114 A; reactive component 1310 × 0.527 = 690 A; net reactive 690 − 333 = 357 A; corrected line current √(1114² + 357²) = 1170 A; power factor 1114 ÷ 1170 = 0.95, on target.
This result is an estimate, and the governing figures move it: the nameplate full-load current replaces the 1310 A estimate, the bank's rated current replaces the 333 A, and the motor circuit's own conductors still come from the Article 430 motor tables rather than from anything above. Note how small the bank sits next to the motor — 120 kvar against roughly 401 kW, and 333 A of capacitor current against 1310 A of motor current. Correction trims the feeder; it does not feed the motor.
How do you install and verify the capacitor connection? #
Trace the starter's poles first, land the bank on the line terminals with its own protection, then prove with measurements that the overload relays and the motor agree on the current, and open nothing until the feeder is locked out and verified dead.
- De-energize the starter's feeder, apply your lockout, and test for absence of voltage at the line terminals with a voltage-rated tester before any cover comes off. Capacitors hold charge after isolation, so wait out the bank's documented discharge time and verify zero volts across its terminals before touching them.
- Trace each pole from the wiring diagram: main, star and delta contactors, the motor leads, the star point and the delta corners. Mark the line terminals where the bank will land.
- Mount the bank beside the starter and land its leads on the line side of the main contactor through its own disconnect and overcurrent device, sized at 135 percent of the bank's rated current — 450 A minimum in the example.
- If the bank's instructions or the plant standard force a downstream connection, keep it off the open-transition motor terminals and either pass its leads through the overload sensing elements or resize the relays to the reduced current, as set out above.
- Re-energize, run the motor at load, and read line current with a clamp-on ammeter, following your plant's energized-work rules, before and after the bank switches in. The corrected reading should land near the estimate — 1170 A in the example's shape — and relays with routed leads should still read the full motor current.
- Log the corrected power factor at the service entrance and re-check after a week of normal duty. A reading pushed above target means the bank is oversized for the load; remove a step rather than run leading.
Can capacitors fix wye-delta switching transients? #
No. The spikes happen downstream of the contactors, so a line-side bank corrects supply power factor and trims feeder current but does nothing to the transition event itself; severe transients are a starter problem — closed transition or soft start — not a kvar problem.
In the example the bank does real work: feeder current at full load drops from 1310 A to 1170 A and the plant power factor lands at 0.95, which is what utility penalties and spare feeder capacity care about. None of it touches the open interval. If the transition itself is the damage — cracked couplings, nuisance tripping on the transfer, bus dips other equipment notices — the correction belongs in the switching sequence: a closed-transition starter that bridges the interval through resistors, or a soft starter on new installations. Either way, the bank stays where the first section put it.
Questions asked
The line-side bank is energized whenever the feeder is on. Is that a problem?
Not electrically. A permanently connected bank corrects plant power factor around the clock, which is usually what the utility metering rewards. If you want the bank off with the motor, feed it through its own contactor taken from the line side, ahead of the main contactor, and keep the Article 460 disconnect, overcurrent protection and 135 percent conductor sizing.
Does any of this change with a closed-transition star-delta starter?
The open interval disappears, because transition resistors keep the motor energized between star and delta, so the coasting-motor argument against a terminal-connected bank mostly goes away. Everything else stands: a bank downstream of the overload relays still bypasses their sensing unless its leads pass through them, Article 460 still governs the bank's leads, and the starter manufacturer should confirm any terminal connection.
Do the overloads need resizing when the bank sits upstream of them?
No. Upstream of the relays, the bank's current never joins the motor conductors, so the relays carry the full line current and are selected from the motor nameplate full-load current as before. Resizing applies only when the bank is downstream of the relays and its current bypasses the sensing elements.
Does power factor correction change the motor's starting torque or the star-start current?
No. A line-side bank supplies reactive current to the supply and trims the current the feeder carries, but nothing inside the motor changes: star-start current, starting torque and the delta transition all behave as designed. Correction is a supply-side fix and is no substitute for a soft starter or a closed transition.