Current IntelPower LibraryShop main store

Troubleshooting

Which test voltage applies when meggering an IEC induction motor

Motors and motor starters Published 8 min read By Current Intel engineering team

Short answer

No IEC standard sets the field megger voltage for an induction motor; the only IEC-side figure found is a polarization index of 2. Test to the IEEE 43 method instead: 500 V DC winding-to-frame up to 2.99 kV, 2500 V from 3 to 5.99 kV, 5000 V at 6 kV and above, accepted at a ratio of 2 or more.

On this page
  1. Why no IEC clause turns up
  2. The voltage row the nameplate picks
  3. Clear the machine first
  4. The test in order
  5. Reading the numbers
  6. What the report names
  7. Questions asked

A customer asks for the IEC megger requirement on an induction motor, and there is no clause to hand over: no IEC document located for this article sets the field insulation-resistance test voltage for an induction motor. The only IEC-side figure the search produced anywhere is a polarization index of 2, and that ratio is the acceptance used below. The scheme you can actually cite is the one in routine use for NEMA and IEEE work, the IEEE 43 method: 500 V DC from winding to frame on windings rated up to 2.99 kV, 2500 V on 3 to 5.99 kV windings, 5000 V at 6 kV and above. The decision path below covers which document the report names, which voltage row the nameplate picks, how to prepare the machine, and how to read the result.

Why no IEC clause turns up #

The IEC 60034 series governs the induction machine itself — ratings, performance and the factory dielectric tests recorded on its test certificate. Nothing in the documents located for this article hands a service technician a field megohmmeter voltage with acceptance numbers attached, and engineers asking the same question on both sides of the Atlantic report the same gap. What exists to cite is a method standard rather than a product standard: IEEE 43, the IEEE Recommended Practice for Testing Insulation Resistance of Electric Machinery, with IEEE 43-2000 as the edition cited here. It sets out the DC test, the temperature correction and the polarization index, which is what a field report actually needs to name.

Read the purchase specification before anything else, because three contract situations lead to different decisions:

  • A document and clause number is named: test to that clause, record it on the report, and use the checks below only to verify the instrument setup.
  • The specification says only that the motor is IEC rated: that phrase describes the machine's design standards, not the field test, so fall through to the rows in the next section.
  • A ratio limit is quoted without a voltage: the ratio does not depend on the test voltage, but the DC setting still has to appear on the report, and the rows in the next section supply it.

The voltage row the nameplate picks #

Read the nameplate line-to-line voltage and take the row it lands in:

Nameplate winding voltage DC setting, winding to frame
Up to 2.99 kV 500 V DC
3 to 5.99 kV 2500 V DC
6 kV and above 5000 V DC

The DC has to stress the insulation hard enough to pull moisture and surface contamination into the reading without over-stressing aged or thermally damaged material, which is why the setting climbs with the winding class instead of being one number for every machine. Instrument maker Megger's published guidance on selecting a test voltage treats the routine setting as the default and reserves 1 kV for troubleshooting — hunting insulation that is weak but not yet failed — which is the mode you are in when chasing an unexplained trip rather than running an acceptance test.

On machines built for a 400 V supply, long-standing field practice adds a phase-to-phase run at 1000 V where the winding ends are reachable: six leads, or star and delta links that can be opened. That mirrors the routine megger test on cabling of the same voltage class, it is practice rather than a quoted clause, and it is optional — when the links cannot be opened, the winding-to-frame result stands on its own.

Clear the machine first #

De-energize, lock out and verify absence of voltage at the terminals before the terminal box comes open. NFPA 70E, the Standard for Electrical Safety in the Workplace, 2024 edition, covers establishing an electrically safe work condition, and its sequence is the precondition for everything below; requirements differ by country and edition, so confirm the acceptance values against the machine's own documentation and with the authority having jurisdiction where a contract or inspection regime applies.

Then disconnect the three motor leads at the motor, clear of the starter and the drive output, so the tester reads the winding and nothing else. A DC test applied through a connected VFD stresses the drive's output stage along with the cable, which can damage the drive and returns a reading for the whole circuit instead of the machine.

Where the clips sit decides what a pass means: a reading taken in the switchgear cubicle includes the feeder cable, while a reading at the motor terminals is the winding alone — insulation resistance testing from switchgear vs motor terminals breaks that difference down. A clean winding reading does not clear everything either: a VFD that trips on ground fault at start with good megger readings points at the cable or the drive, not the insulation. And on a machine that has been in storage, the megger is only half the acceptance — why a stored vintage motor needs megger and winding tests before a VFD covers the winding tests that go with it. Record the winding temperature before the first reading; the correction that makes hot and cold readings comparable is in the reading section below.

The test in order #

  1. Complete the electrically safe work condition above, then open the terminal box.
  2. Disconnect the three leads at the motor and lift surge capacitors and arresters off the winding.
  3. Record the nameplate winding voltage, the insulation class and the winding temperature.
  4. Short the three phase leads together, connect the tester's line lead to the shorted winding and the earth lead to the frame, and set the tester to the row the nameplate selects.
  5. Apply the DC, record the reading at one minute, and keep the test running to ten minutes on the same setting.
  6. Where the winding ends are accessible and the contract asks for it, open the links and run the phase-to-phase test at the higher low-voltage setting.
  7. Discharge the winding to the frame for at least as long as the test ran, then confirm zero volts at the terminals with a voltmeter before anything is re-terminated.

Reading the numbers #

The polarization index — the ten-minute insulation resistance divided by the one-minute insulation resistance at the same DC setting — is what separates a dry, clean winding from a wet or contaminated one. Leakage current through moisture and surface film holds steady while absorption current decays, so clean insulation shows a climbing reading and a ratio well above one, while contamination holds the reading nearly flat and drags the ratio toward one. The physics and the IEEE-aligned treatment of marginal values are worked through in more depth in this guide to polarization index theory, interpretation and IEEE standards. The acceptance floor is a ratio of 2 — the only IEC-side figure this search produced, and the same number a NEMA and IEEE-aligned customer checks against.

What the readings show What it points at The decision
Ratio 2 or higher, reading climbing Dry, clean insulation Record and release
Ratio below the floor, first reading high Very high absolute resistance flattens the ratio Compare the temperature-corrected absolute reading against the minimum in the method you cite, and retest at the reference temperature
Ratio below the floor, first reading low Moisture or contamination Dry and clean the winding, then retest
Reading falls while the test runs A developing breakdown path Stop and investigate; do not raise the DC

Worked example, clearly hypothetical, with every input stated: a 400 V six-lead machine, winding temperature 40 °C, tested winding to frame on the low-voltage row's setting with a stabilized-output insulation resistance tester. The first reading is 420 MΩ and the ten-minute reading is 1.02 GΩ, which is 1020 MΩ. The ratio is 1020 MΩ ÷ 420 MΩ = 2.43, a dimensionless number. That clears the floor, and the absolute reading sits far above the minimum that applies at the reference temperature, so the decision is record and release. If the later reading had been 500 MΩ, the ratio would have been 500 MΩ ÷ 420 MΩ = 1.19 — a flat line — and the decision would be dry and clean, then retest. The stubborn version of that branch is a winding that stays low after drying: the failure modes behind a persistent low polarization index are worked through in this piece on resolving low polarization index in generator windings.

Put readings taken on different days on the same footing before comparing them: insulation resistance roughly halves for every 10 °C of winding temperature rise. A first reading of 900 MΩ on a 50 °C winding corresponds to roughly 1800 MΩ at the 40 °C reference the IEEE method uses, because 900 MΩ × 2 = 1800 MΩ. Treat that as an estimate for comparison, not a calibrated value, and record the measured temperature on the report either way.

What the report names #

The defensible report names the IEEE method — IEEE 43-2000, or whichever edition is current on the test date — and lists the DC setting used, the two durations, both readings, the computed ratio, the winding temperature with its correction, and confirmation that the winding was discharged and checked dead before re-termination. Then the decision, case by case:

  • The contract names a standard and a clause: test to that clause and record it; the rows above are the cross-check on the instrument setup.
  • The specification names no document, only an IEC rating: the nameplate selects a row, the report cites the IEEE method, and the machine passes on a corrected absolute reading plus a ratio at or above the floor.
  • The customer insists on an IEC clause for the field voltage: ask them to name it. If none can be named, the agreed method statement becomes the contract record — that is the position the research for this article supports.

The short version: the nameplate picks the row, IEEE 43 names the method, and no machine passes or fails on an unrecorded reading.

Questions asked

What happens if a low-voltage motor is meggered at the medium-voltage setting?

The DC then exceeds routine practice for that insulation by a wide margin, and aged or thermally damaged insulation can puncture during an ordinary acceptance test, which turns a dryable moisture problem into a rewind. Test at the row the nameplate selects, and go above it only when a document you can cite on the report demands the higher value.

Why disconnect the motor leads when the starter is right there?

Because the reading would then cover the feeder cable, the terminations and the drive or starter output as well as the winding: a bad cable looks like a bad machine, a clean winding hides a bad cable, and DC at test voltage can damage drive output electronics. Disconnecting at the motor terminals makes the reading about the winding alone.

Does a good polarization index guarantee the motor passes?

No. The ratio can look healthy on a winding whose absolute insulation resistance has already fallen below the minimum in the method you cite, so both checks run every time: the temperature-corrected absolute reading and the ratio. A ratio at or above 2 with a low first reading fails on absolute value, not passes on the ratio.

Where does a 3.3 kV motor fall in the voltage table?

Take the row that contains the nameplate value: a 3.3 kV winding sits in the middle row and takes that row's 2500 V DC setting, while a 6.6 kV winding lands in the top row. A machine rated between row boundaries never drops to the row below, which is why the nameplate, not the supply voltage, selects the setting.

Keep reading

  • Troubleshooting

    Why a 6.6 kV motor reads 4 MΩ after an earth fault trip

    Keep the 2.6 MW motor out of service. A 6.6 kV form-wound stator must clear IEEE 43-2013 twice — at least 7.6 megohms of insulation resistance at 40 °C (rated kilovolts plus 1) and a polarization index of at least 2.0 — and this one measures 4 megohms with a ratio of 0.65, the signature of moisture or contamination. Verify the relay's earth-fault scaling separately; it does not change the verdict.

    Motors and motor starters

  • How-to

    Why a stored vintage motor needs megger and winding tests before a VFD

    Yes, and before any drive is bought; a motor stored for twenty years needs a 500 V DC insulation test and three lead-to-lead resistance readings. The pass marks are 1.22 MΩ minimum for a 220 V winding per IEEE 43-2013, a polarization index of 2.0, and phase resistances within 5 percent. Pass, and either a 1 hp single-phase-input drive or the 5 hp rotary converter runs it; fail, and the motor is replaced, not repaired.

    Motors and motor starters

  • Troubleshooting

    Why a three-phase motor blows its terminal box apart

    A 30 A fuse on a roughly 11 A motor opens only on fault current, and the restart let the fault arc long enough to burst the terminal box. Lock out, verify absence of voltage, test motor and cable separately at 500 V DC, and pull the motor for the shop: a ruptured box is almost never field-repairable.

    Motors and motor starters