The IEC 61363 hand and software results already agree; the comprehensive 11.3 kA is the initial symmetrical current of the same fault. The decrement curve misses the protection because the current falls to 2.5 kA at the 0.632 s high-set delay, below its 4.5 kA pickup. The model's sustained value is 1.6 kA, not the data sheet's 5.6 kA, which needs a field-forcing ratio of 10.4.

On this page
  1. What each result actually measures
  2. The comprehensive result is the first-cycle current
  3. The two plotted lines are different quantities
  4. Why the curve reads low at the delay
  5. The sustained current: model against data sheet
  6. What the relay will actually do
  7. Checks that close it out
  8. The decision, case by case
  9. Questions asked

Your arithmetic is sound and your reading of the plot is right. The hand and software IEC 61363 runs agree, the comprehensive study reports a different quantity from the same fault, and the decrement curve misses the overcurrent element because the modeled current falls below pickup before the delay runs out. On the 1636 kVA, 690 V machine the initial symmetrical current is 11.3 kA, the peak 28.4 kA, and the AC contribution is down to 2.5 kA at the 0.632 s delay of a high-set element picked up at 4.5 kA. The sustained current the model settles on is 1.6 kA, not the 5.6 kA on the data sheet, because the excitation inputs are defaults. Correct the inputs, then change the settings.

What each result actually measures #

Five numbers are in play, and each answers a different question.

Result Value Current definition
Full-load current 1368 A, nameplate continuous RMS rating
Hand calculation, IEC 61363 28.4 kA peak; 10.8 kA AC at 0.5 T peak of the offset wave; RMS of the AC component a half time constant in
Software, IEC 61363 mode peak matches the hand run; 10.7 kA AC at 0.5 T the same two quantities
Comprehensive study 11.3 kA, three-phase initial symmetrical RMS, proved below
Decrement plot 18 kA total beside 9.8 kA AC at its left edge; 2.5 kA at the delay; settles at 1.6 kA instantaneous envelope, then RMS AC

The nameplate current checks out: I = S ÷ (√3 × V) = 1,636,000 VA ÷ (1.732 × 690 V) = 1369 A, one amp from the printed figure. The two IEC 61363-1:1998 results — that standard calculates time-varying short-circuit currents for three-phase AC installations of ships and mobile and fixed offshore units, and it is the usual basis for generator decrement curves — agree within 0.1 kA on both quantities, so accept them. The half-time-constant values sit just under the initial value, 10.8 and 10.7 against 11.3 kA, which is what the first decay step should look like.

The comprehensive result is the first-cycle current #

The peak factor settles what the comprehensive figure is. IEC practice defines the peak as ip = κ × √2 × Ik″, so κ = ip ÷ (√2 × Ik″) = 28.4 kA ÷ (1.414 × 11.3 kA) = 28.4 ÷ 15.98 = 1.78. IEC 60909-0:2016, which calculates short-circuit currents in three-phase AC systems as time-independent equivalents, caps that factor at 1.8 for systems up to 1000 V, and 1.78 is exactly what a bolted fault at the terminals of a machine produces. The comprehensive study is therefore not disagreeing with the IEC 61363 runs: it reports the initial symmetrical RMS current at fault inception, before any decay, and the decrement curve is that same current traced over time. Read the label off the short-circuit report to confirm, but the arithmetic already fixes it.

Each defined current feeds a different duty at a different instant — the discipline the article on which bolted fault current to use for breaker duty and arc flash applies to interrupting ratings.

The two plotted lines are different quantities #

The purple lines are not two answers to one question. The right-hand line is the instantaneous envelope, i(t) = √2·Iac(t) + Idc(t); the left-hand line is the RMS AC component alone. Read together at one instant: √2 × 9.8 kA = 13.9 kA of AC peak, and 18 kA − 13.9 kA = 4.1 kA of DC still flowing at that point. The 28.4 kA peak occurs in the first half cycle of the offset wave, and a log-time plot whose axis begins at tens of milliseconds opens below it, which is why the plotted envelope never shows it. A relay pickup set in RMS amps compares against the AC line only; never multiply one curve by √2 to chase the other.

Why the curve reads low at the delay #

The gap between the plotted 2.5 kA at the delay and the roughly 8 kA your hand curve shows at the same instant is the transient time constant, not the reactances. The subtransient component is spent within hundredths of a second, so at that point only the transient and sustained terms remain — and a curve still near 8 kA there implies a Td′ roughly three times the software's, short for a machine this size. Pull Td′, Td″, Ta, X″d, X′d and Xd from the data sheet, enter one set in both calculations, and the two curves converge.

The sustained current: model against data sheet #

The steady-state value follows Id = (e/Xd)·(IF/IFg), with the internal voltage e and the synchronous reactance Xd in consistent units: the sustained current is whatever the excitation system forces it to be. Work the two figures against each other. The data-sheet claim implies e/Xd = 5.6 kA ÷ 10.4 = 0.54 kA; the plot's settlement of 1.6 kA ÷ 0.54 kA = 2.97 says the software default ratio is about 3.0, and the claim needs 10.4 — a factor of 3.5 (5.6 ÷ 1.6) of field forcing that nothing in the file supports. The defaults for Ta, IF and IFg were never checked against this machine, so the model and the data sheet describe different excitation systems.

Do not tune the ratio until the curve hits the promised number. Get the forcing data, or the guaranteed sustained short-circuit current at the terminals, from the machine builder, enter the ratio that reproduces it, and re-run. Until that document arrives, protection is set to the modeled 1.6 kA.

What the relay will actually do #

The high-set generator-breaker element is picked up at 4.5 kA with a delay of 0.632 s, and a definite-time element trips at pickup plus delay only if the measured current stays above pickup for the whole delay. For a bus fault fed by this machine alone the relay measures the generator contribution itself, so the decrement curve is the right curve — and at 0.632 s that current is 2.5 kA, 2.0 kA under pickup. The element cannot complete its timing. The lower element does pick up on the sustained current, but on the plotted curves it crosses near 150 s, and that crossing is paper, not protection: excitation protection and field reduction act first, and the fault burns meanwhile.

So the main switchboard is not protected against a bus fault by the plotted overcurrent elements with one unit online. The fix is a voltage-restrained or voltage-controlled overcurrent element (ANSI 51V): fault voltage collapses, the restraint relaxes, and the pickup at collapsed voltage must sit below the sustained current — for example 1.3 kA, about 80% of the modeled value — timed to coordinate with the largest downstream device. Keep the high-set for downstream faults, where the current holds above pickup, and confirm the field-breaker trip and field dissipation for faults on the generator side of the breaker.

The same decaying current feeds the arc-flash study, which handles generator decay its own way; the article on handling generator fault-current decay in arc flash studies covers that side.

Checks that close it out #

  • Study case: this machine alone online, with the other five units and any utility tie explicitly flagged out of service in every run.
  • Fault the main switchboard bus and the generator terminals separately, and record which current the generator-breaker relay measures for each location.
  • Export every result with its definition and evaluation time: initial symmetrical, peak, breaking, AC RMS at a stated instant, DC component, instantaneous envelope.
  • Replace the default machine and excitation inputs — Xd, X′d, X″d, Td′, Td″, Ta, IF and IFg — with data-sheet values, re-run both calculation methods, and re-check the peak factor.
  • Plot the relay-measured current against the element curves and read the time spent above pickup, not single points.
  • Apply the restrained-element decision, re-coordinate the downstream devices, and record the basis in the project's protection philosophy.
  • Any step that opens the terminal box, excitation cabinet or relay panel to read settings is done de-energized, locked out and verified dead first; everything above is desk work.

The decision, case by case #

  • The IEC 61363 results: accept. Hand and software agree within 0.1 kA on the peak and on the AC component.
  • The comprehensive figure: initial symmetrical RMS at inception, used for first-cycle and interrupting duty, never read as a point on the decayed curve.
  • The sustained current: the modeled value stands until the builder's forcing data confirms the data-sheet figure; the ratio that figure needs is 10.4, and nothing in the file supports it today.
  • The plotted protection: it does not clear a switchboard bus fault with one unit online; add the voltage-restrained element with pickup below the sustained current, and verify the high-set still covers downstream faults.
  • The 150 s crossing: not a clearing time; confirm that the excitation protection which acts earlier is fitted and set.

Questions asked

Does an IEC 60909 result replace the IEC 61363 curve?

No, they answer different questions. IEC 60909-0:2016 computes time-independent equivalents — initial symmetrical, peak, breaking and steady-state — using a voltage factor to cover worst-case operation. IEC 61363-1:1998 computes the AC and DC components as functions of time for ship and offshore installations. Compare the 60909 initial symmetrical value with the curve at fault inception only; at later instants the two methods are not supposed to agree.

Can a decrement curve fall below its own sustained value?

Yes. The edition-2 maintenance work on IEC 61363 records generator decrement curves that fall below their own steady-state current between 100 ms and 1 s before recovering, where the decaying transient term and the excitation system's forcing response overlap. A pickup set between the dip and the recovered value can pick up, drop out and pick up again, so coordination reads total time above pickup, and a secondary-injection trip test proves the final behavior.

What if the builder will not publish the field-forcing data?

Ask for the guaranteed sustained short-circuit current at the terminals instead, then back-calculate: with e and Xd from the data sheet, Id = (e/Xd)·(IF/IFg) gives the ratio that reproduces the guarantee — 10.4 for the 5.6 kA figure here. Record the derived assumption in the study notes and set protection to the lower of modeled and guaranteed currents until a builder's letter or a test confirms it.

Does the arc-flash study use the decrement curve?

Most incident-energy tools do not apply the full curve. They take a stepped or single-value reduction of synchronous-machine contribution and rely on the clearing time you supply. Set the relays against the decrement curve first, then feed the resulting clearing time into the incident-energy calculation so the two studies stay consistent when a pickup changes.

Keep reading

  • Explainer

    Which starting current to use for motor short-circuit contribution

    For an IEC 60909 short-circuit study of a motor fed through a wye-delta starter, estimate the machine's reactance from its full-voltage starting current — the 7×In locked-rotor ratio — never the reduced wye current. The starter changes how the machine starts, not what it feeds a fault. Enter the 50 m and 5 m cables as separate segments and give each fault case only the runs between contributor and fault.

    Protection: breakers, fuses and SCCR

  • Explainer

    Available fault current vs secondary short-circuit current

    Available fault current and secondary short-circuit current name the same prospective current only when both refer to the same point, fault type and current basis. A supplied value equal to the transformer's full-load current divided by its percent impedance assumes an infinite source: for a 300 kVA, 480 V, 2.0% Z unit that is 361 A / 0.02 = 18,050 A. That number is conservative for equipment duty but not automatically the worst case for arc flash.

    Protection: breakers, fuses and SCCR

  • How-to

    Calculating Transformer Interrupting Current From Impedance

    Use the impedance's own base: 10.2% is stated on the 8,333 kVA self-cooled (OA) rating, so rated current at 5.04 kV is 1,653 A and the transformer-limited secondary fault current is 1,653 ÷ 0.102 ≈ 16.2 kA. That figure sizes a breaker on the secondary bus; a primary breaker's interrupting rating is set by the upstream available fault current, not by the transformer.