Why an 11 kV spur backfed from a generator needs an earth reference
Short answer
Cut an all-delta 11 kV spur from the network and backfeed it from a generator, and it has no earth reference: a first line-to-earth fault passes only charging current and no fuse operates. Earth one line solidly at the step-up transformer, or earth the midpoint of two series 11 kV:460 V units; line-to-earth earthing transformers only give a high-impedance reference. Work out the earth-fault loop before energising.

On this page
- The spur you are actually islanding
- Why the first earth fault is invisible
- Why line-to-earth earthing transformers fail here
- Centre-tap earthing with two step-up units
- One-leg earthing on the existing unit
- The earth-fault loop, worked
- Changeover, protection and the isolation step
- The decision
- Questions asked
Backfeeding an 11 kV spur from a generator brings an earthing problem with it. No transformer on the line brings an earthed terminal to its HV side, the LV MEN earths cannot transfer through a delta winding, and once the spur is opened at the taps the network's only earth reference — the earthed star point of the zone-substation supply transformer — is gone. A first line-to-earth fault then passes a fraction of an amp, no HV fuse operates, and the healthy conductor rises to full line-to-earth voltage. The fix is to build the reference at the source: earth one line solidly, SWER-style, or earth the midpoint of two series-connected step-up units. Line-to-earth earthing transformers with shorted secondaries are not a third option, and the earth-fault loop must be calculated before the generator is ever closed.
The spur you are actually islanding #
On the network the earth reference comes from the substation: the supply transformer is delta-star, its HV star point is earthed, and every conductor on the feeder holds a defined phase-to-earth potential because of it. The spur runs on two conductors only, and no distribution transformer along it brings an earthed star point out to the HV side: the three-phase units are delta on the HV side, and the single-phase units have two live bushings. The unit you plan to backfeed is a single-phase 50 kVA transformer stepping the line down to 230 V — two live HV terminals, nothing earthed.
The LV network cannot stand in. Each consumer transformer has its neutral tied to earth — MEN, with driven electrodes at the pole and at the premises — but a delta winding passes no earth reference from one side to the other. Open the taps at the spur point and the island that remains has one source winding, two floating conductors, and no connection between either conductor and earth anywhere along the line. The generator never parallels with the network, so nothing from the healthy system can leak in to help.
Why the first earth fault is invisible #
A conductor down on a crossarm has nowhere to send current on this island. The only paths are the line's capacitance to earth and surface leakage — tens of milliamps per kilometre of overhead line, a fraction of an amp even on a long spur — orders of magnitude below what an HV fuse needs to operate. Nothing trips and the spur stays live with the fault on it. The same dead end appears in the ground fault current path for an ungrounded generator fault: without a metallic return to a winding terminal, overcurrent protection is blind.
The fault also drags the floating neutral point onto the faulted conductor, pinning it at earth potential, so the healthy conductor sits at full line-to-line voltage to earth — 73 % more to-earth stress than the same hardware sees on the network — until someone finds the fault. Consumer LV voltages look normal the whole time, because every transformer still sees the same line-to-line voltage. That is what makes the arrangement dangerous: nothing on the customer's side reports the fault.
| What you see | What is happening |
|---|---|
| A conductor down on pole hardware, all fuses intact, supply still on | No earth return path exists; only charging and leakage current flow |
| The healthy conductor at full line-to-earth voltage | The floating neutral point has shifted onto the faulted conductor |
| A fuse operates only after a second fault on the other conductor | The two faults form a line-to-line short circuit through earth |
| Consumer voltages normal throughout | Line-to-line voltage is unchanged; the LV side never sees the fault |
Standards that let unearthed systems ride a first earth fault pair that permission with fault detection and a duty to clear the fault promptly. An unmonitored overhead spur has neither, so the first fault simply waits for the second.
Why line-to-earth earthing transformers fail here #
The proposal — one 50 kVA transformer from each conductor to earth, so fault current can return through the pair — copies a three-phase earthing transformer onto a circuit that cannot support it. A zigzag or wye-delta earthing transformer works on three phases because the fluxes cancel in normal service, so it carries only magnetising current while offering a low-impedance path to zero-sequence fault current. On a two-wire line there is nothing to cancel: each unit is an ordinary single-phase transformer with roughly half the line-to-line voltage across it for as long as the spur is energised.
That makes both answers to the secondary question dead ends. Short the secondaries for a low-impedance earth path and the pair becomes a standing line-to-line load. Take example nameplate values — 50 kVA, line-to-230 V, 4 % impedance voltage, so check yours — and each unit's impedance referred to the HV side is:
Z = 0.04 × 11,000² / 50,000 = 0.04 × 2,420 = 96.8 Ω
The series pair then draws 11,000 V / (2 × 96.8 Ω) ≈ 57 A continuously, against a rated current of 50,000 VA / 11,000 V ≈ 4.5 A. That is about twelve times rating: no correctly sized line fuse survives energisation, and neither would the units.
Leave the secondaries open and you get the opposite failure: only magnetising current flows, the earth path is the magnetising impedance, and a real fault drives a current too small to operate anything. The faulted case also destroys any discrimination: a fault on one conductor short-circuits that unit, collapsing its current, while the other unit sees the full line voltage and doubles — a factor of two between normal and fault, which no fuse can sit between.
The one usable version of this hardware is high-resistance earthing: a resistor in each secondary gives the spur a defined potential reference with fault current well under an amp. That supports an alarm — or a trip if you add a relay across the resistor — but never fuse clearance, and the fault then gets traced pole by pole, the way locating a ground fault on a resistance-grounded 480 V system works.
Centre-tap earthing with two step-up units #
The cleanest reference runs on two single-phase transformers with a 460 V secondary. Feed each 460 V winding with 230 V from the generator and each HV winding makes 5.5 kV; connect the two HV windings in series across the line and earth the midpoint at the source electrode. Both conductors then sit at 5.5 kV to earth — below the phase-to-earth stress the same hardware sees on the network — and a fault on either conductor has a short return through the earthed midpoint.
Check capacity and nameplate before committing. Each unit runs its HV winding at half voltage and rated current, so it passes 25 kVA and the series pair delivers 50 kVA at line voltage; the spur load must fit inside that. And the scheme hangs on a 460 V LV connection: the existing 50 kVA unit may offer one through taps or a reconnectable winding, but only its nameplate and terminal board can say, and the second unit must match it.
One-leg earthing on the existing unit #
Earthing one HV terminal of the existing unit solidly turns that conductor into an earthed neutral line and leaves the other as the hot line at the full line voltage to earth — SWER-style, except the second conductor stays in place as a metallic return. Load current circulates in the two conductors exactly as before; only fault current uses the general mass of earth. One electrode at the source site is therefore enough, no consumer-side earths are needed, and the setup stays a single-site job — which is what makes it workable for a changeover every second day.
Keep both lines protected: run both conductors through pole-mounted disconnects or fused cut-outs, and reject any version that backfeeds through solid links with protection only on the 230 V side — that leaves the HV line unfused. At each consumer transformer, change the fuse on the conductor that becomes the earthed line to double the hot-line fuse rating: the smaller hot fuse clears for overload and line faults, the larger one backs up an internal transformer fault. Restore the original ratings when the project ends.
The earth-fault loop, worked #
Neither method earns its connection schedule until the loop is calculated. Example inputs, each to be replaced with a nameplate or measured value: single-phase, two-wire, 11 kV, 50 Hz; 3 km of 100 mm² all-aluminium line; the 50 kVA step-up unit with 4 % impedance voltage; a source electrode measured at 10 Ω with a fall-of-potential earth tester; and a hot conductor down on wet crossarm hardware with 20 Ω of contact resistance.
Line resistance: R = 2.83×10⁻⁸ Ω·m × 3,000 m / 100×10⁻⁶ m² ≈ 0.85 Ω. Transformer impedance referred to the HV side: 96.8 Ω, from the earlier calculation.
One-leg method, fault on the hot line, the full line-to-line voltage driving:
I = 11,000 V / (96.8 + 0.85 + 10 + 20) Ω = 11,000 / 127.65 ≈ 86 A
Centre-tap method, fault on either conductor: half the voltage drives through one half-voltage winding, whose impedance is 0.04 × 5,500² / 50,000 = 24.2 Ω, so:
I = 5,500 V / (24.2 + 0.85 + 10 + 20) Ω = 5,500 / 55.05 ≈ 100 A
Summing reactance and resistance as plain magnitudes puts both results on the low side — the safe direction for a protection check — and both are estimates to be re-run with the real nameplate impedance and the measured electrode resistance. Against protection: the spur's full-load current is 50,000 VA / 11,000 V ≈ 4.5 A, so a plausible hot-line fuse is 10 A. 86 A is 8.6 times that rating and 100 A is ten times, both well into the fast region of a 10 A fuse curve — read the actual curve to fix the clearing time. Sensitivity: even a 100 Ω electrode, dry soil and a single rod, leaves 11,000 V / 217.65 Ω ≈ 51 A on the one-leg method, five times the fuse. The arrangement only loses on high-resistance earth faults, hundreds of ohms at the contact, which hold the current near twice rating — the same limit every earthed overhead network lives with.
Changeover, protection and the isolation step #
The changeover is simple switching with one hard rule: the generator never parallels the network. Open the taps at the spur point and lock them out, prove the spur dead with a tested indicator, then close the generator-side connection; reverse the sequence to restore the supply. Break-before-make, key-interlocked where the switchgear allows it, and the switching schedule agreed with the lines company in advance.
The line, its earthing and its clearances fall under AS/NZS 7000, the joint Australian/New Zealand standard for overhead line design and construction (2016 edition), and in New Zealand under the Electricity (Safety) Regulations 2010, which govern electrical work and safety; confirm both, plus the lines company's own rules, before the first changeover. The 230 V side is a separate earthing decision of its own — see choosing neutral grounding for a 480 V diesel set — and the generator gets overcurrent protection on that side as well.
The decision #
| Option | Verdict |
|---|---|
| Two line-to-earth 50 kVA units, secondaries shorted | Rejected — a 57 A standing current against a 4.5 A rating; the fuses blow at energisation or the units burn |
| The same units with secondary resistors | High-impedance reference only — alarm-grade fault current, no fuse operation, a relay and a pole-by-pole trace required |
| Centre-tap pair, two 11 kV:460 V units | Preferred where the 460 V connection exists — both lines at half voltage to earth, 100 A of fault current in the example, 50 kVA pass-through, consumer fuses untouched |
| One-leg on the existing unit | The fallback that always works — 86 A in the example with minimal gear, at the cost of a hot line at full line voltage to earth and doubled earthed-line fuses |
If the existing unit's nameplate offers a 460 V connection, build the centre-tap pair: both lines at half voltage to earth, nothing disturbed at the consumer poles, and the better scheme for a daily changeover. If it does not, earth one leg of the existing unit, double the earthed-line fuses, and accept a hot line at full line-to-earth voltage after checking the pole transformers and insulators for that stress. Either way the gate is the same: measure the source electrode, run the loop calculation, read the fuse curve — then close the generator. And never energise the spur unfixed: the first earth fault will not clear, and the second one takes the whole line down.
Questions asked
Does the generator's own neutral-to-earth connection reference the HV line?
No. The transformer isolates the 230 V winding from the HV winding, so the generator's neutral bond fixes the 230 V side only. The HV side floats until one of its terminals is bonded to earth — which is exactly what the one-leg method adds at the source end. The two earthing decisions sit on opposite sides of the transformer and are made separately.
What happens if a second earth fault develops before the spur is earthed?
Two faults on opposite conductors turn the situation into a line-to-line short circuit through the general mass of earth. Both source cut-outs see that current, but the two earth contacts sit in the fault loop, so the current can stay low enough that clearing is slow — and when a fuse does operate, the whole spur goes out with it. Combined with the healthy conductor sitting at full line voltage to earth, that escalation is why the first fault must be made to clear instead of tolerated.
Do the consumer transformers need attention under the one-leg method?
Their voltages do not change: every unit still sees the full line-to-line voltage, so the LV output stays nominal. What changes is the hot conductor's steady potential to earth, which rises from the 6.35 kV an earthed-neutral network holds to the full 11 kV — a rise by the square root of three. Check that pole transformers, insulators and surge arresters on the spur are specified for full line voltage to earth; equipment built for single-wire earth return service at this voltage already is.
How much fault current do the earthing transformers pass with resistors in their secondaries?
Whatever the resistor admits, referred through the turns ratio. On a unit at this line voltage with a 230 V secondary, one ampere of secondary current is about 21 mA on the line, so a resistor sized for 20 A at the secondary allows roughly 0.4 A of primary fault current. A voltage relay across the resistor sees that easily, but no line fuse will ever operate on it — which is why the arrangement buys detection, not clearance.