Selection guide
Conditioning a current sensor signal for a PLC analog input
Short answer
Amplify the sensor signal before the diode bridge, or skip the bridge, bias the secondary at mid-scale and let the PLC rectify in software. In the worked example a bridge-first chain on a 10 A motor reads zero below 4.2 A because two diode drops need 1.2 V before conducting; gain-first cuts that edge to 1.4 A and the software chain removes it. A single sensing channel measures one conductor, so each reported phase needs its own channel.

On this page
- What signal does a current sensor hand to the PLC?
- How do you size the burden resistor on a current transformer secondary?
- Where should the gain stage sit relative to the diode bridge?
- What does the diode bridge cost you at low current?
- Can the PLC rectify the signal in software instead?
- Which chain fits which job?
- Do you need one sensor per phase on a three-phase motor?
- Should you build the chain or buy a ready-made transducer?
- How do you verify the scaled reading before you trust it?
- Questions asked
Amplify before you rectify: put the gain stage ahead of the diode bridge, or drop the bridge entirely, bias the burden at mid-scale and rectify in software. A bridge wired straight onto a current sensor's output needs its two forward diode drops — roughly 0.8 to 2 V — before it conducts anything, and a burden voltage of two or three volts at full load spends much of every cycle below that edge, so light loads read low or read zero. The fix costs either a reordering of the same parts or a faster analog input. Topology also comes down to one counting fact: a sensing channel measures the conductor routed through it, so every phase the PLC must report needs its own channel. The sections below size the burden resistor, run the numbers end to end and finish with the chain to build or buy for each case.
What signal does a current sensor hand to the PLC? #
A current transformer's secondary is a current source: 10 mA RMS at a 1:1000 ratio with 10 A through the primary, and it makes no voltage at all until a burden resistor converts that current into something a 0-10 V analog input can read. Three sensor families feed this kind of input. A current transformer delivers secondary current equal to primary current divided by the turns ratio regardless of the burden, so a resistor makes the voltage and the CT datasheet sets how large that resistor may be. A Hall-effect sensor emits a voltage proportional to the field from the conductor; current-output types are usually powered from split supplies such as ±12 V or ±15 V and swing bipolar, which a unipolar input module cannot accept without level shifting. Two-wire Hall sensors have their own interface parts — the MAX9621, for example, conditions two of them for low-voltage processors. A catalog transducer may already emit a scaled voltage or 4-20 mA, in which case conditioning shrinks to scaling.
The signal of interest here is 50 or 60 Hz at the fundamental, far below any general-purpose op-amp's bandwidth, so speed is never the problem — the bottom of the range is. Which sensor fits which hookup at the module is covered in measuring DC and AC motor current for a PLC without a VFD.
How do you size the burden resistor on a current transformer secondary? #
Set the burden resistor from Ohm's law — target volts divided by secondary amps: for 2 V RMS across a 1:1000 secondary carrying the example 10 A motor's current, 2 V ÷ 0.010 A = 200 Ω, inside whatever maximum burden the CT datasheet states. In symbols: R_burden = V_target ÷ I_secondary, with I_secondary = I_primary ÷ turns ratio. The datasheet supplies the turns ratio and the maximum burden, in ohms or in volt-amperes, and the fitted resistor must stay inside it. Aim the target voltage so the amplified or biased chain lands inside the module's span with margin, and include the motor's starting current in that margin if the PLC has to follow the start.
De-energize the circuit and verify absence of voltage before wiring the secondary, and never open a CT secondary circuit while the primary is energized — short the secondary terminals first, because an open secondary on a loaded CT can develop a hazardous voltage across its terminals.
Where should the gain stage sit relative to the diode bridge? #
Order the chain so the gain stage precedes the diode bridge: an amplified waveform crosses the bridge's conduction threshold early in every half-cycle, while a raw burden voltage of a few volts spends most of the cycle below a threshold made of two forward diode drops. Each conducting diode drops roughly 0.4 to 1 V depending on type and current, and a full bridge conducts through two in series, so the dead band at its input is about 0.8 to 2 V; the example below takes two silicon diodes at 0.6 V each. The constraint on gain is that gain times the burden's peak voltage must land inside the module's span at the highest current the chain will ever see, starting current included when the PLC follows the start.
The same gain budget governs amplifying a small shunt signal to a full analog span, where one stable stage lifts a millivolt-level input to full scale. Two refinements finish the hardware version. A precision rectifier puts the diode inside the op-amp's feedback loop, so loop gain divides the forward drop away and the output stays linear down to the low millivolts — one published current-transformer conditioning design amplifies a 1:1000 CT's 50 Hz output with a TLV9056 differential amplifier on exactly this pattern. And once the bridge's bottom rail is grounded, the output is ground-referenced and a plain inverting or non-inverting stage serves; a differential stage buys nothing there.
What does the diode bridge cost you at low current? #
At one-fifth of full load the worked example reads zero: the burden makes 0.57 V of peak, the two-diode path needs 1.2 V before anything leaves the bridge, and the PLC shows 0 A on a motor genuinely drawing 2 A. State the inputs first: a motor with a 10 A full-load current, one phase monitored through a 1:1000 current transformer at 50 or 60 Hz, a 200 Ω burden giving 2 V RMS at full load, a silicon bridge, and a 0-10 V analog input.
- Secondary current at full load: 10 A ÷ 1000 = 0.010 A.
- Burden voltage: 0.010 A × 200 Ω = 2.0 V RMS, so the peak is 2.0 V × 1.414 = 2.83 V.
- Two silicon diodes conduct in series every half-cycle: 2 × 0.6 V = 1.2 V of burden voltage must be present before the output moves at all.
- Conduction begins at asin(1.2 ÷ 2.83) ≈ 25° into each half-cycle, so about 28 percent of every half-cycle produces nothing.
- The zero-reading edge sits at 1.2 V ÷ 0.283 V per amp ≈ 4.2 A: below about 4.2 A of primary current the PLC displays 0 A on a running motor.
- Move the gain ahead at ×3 and the threshold seen at the burden falls to a third, the zero edge drops to about 1.4 A, and the full-load peak lands at 7.29 V, inside the input span.
Bridge-first, the same motor reads zero below the step 5 edge and a badly kinked fraction of the truth under about half load. These are example results for the stated inputs; the turns ratio, maximum burden and diode types come from the parts actually fitted, so re-run the division with your own numbers before trusting the chain.
Can the PLC rectify the signal in software instead? #
Yes, and it is the cleanest of the three: bias one burden terminal at mid-scale, let the PLC sample the whole AC waveform riding on that bias, and take the absolute value or the true RMS in the program, with no diode anywhere in the signal path. Bias the burden's cold end at half the module's span — 5.0 V on a 0-10 V input — and size the burden to use the span: 300 Ω turns the example's full-load secondary current into 3.0 V RMS, a 4.24 V peak, so the input sees 0.76 V at the trough and 9.24 V at the crest. The program subtracts the 5.0 V bias, squares, averages over a whole number of cycles and takes the square root — true RMS, linear at every load, with the waveform itself available if the application later needs starting profiles or unbalance math.
The requirements are sampling rate and a clean reference. To catch the crest of a 60 Hz sine the module must sample well above two points per cycle; 1 kHz gives about 17 samples per cycle, or 20 at 50 Hz, and the average should run over complete cycles — 16.7 ms at 60 Hz. Confirm the module's actual sample or update rate in its documentation rather than assuming the scan time, and derive the mid-scale reference from a low-impedance source or buffer it, or the bias sags every time the input samples.
Which chain fits which job? #
Pick the software chain whenever the analog module can sample fast enough, the gain-first bridge when it cannot, and the catalog transducer when the panel must be maintainable by someone who did not build it. Read the table against three facts about your own panel: whether the input actually samples fast enough for the software chain, whether anyone needs a true reading below half load, and whether the next technician must be able to replace the sensing without a drawing and an afternoon.
| Chain | Reading at one-fifth of full load | Waveform to the PLC | Parts to build | Fits when |
|---|---|---|---|---|
| Burden, bridge, then gain | Zero below the bridge edge, kinked above it | Magnitude only | Burden, four diodes, gain stage | Signal is always large; nobody reads under half load |
| Burden, gain, then bridge | Near-linear above about one-seventh of full load | Magnitude only | Same parts, reordered | Input samples slowly but a magnitude is enough |
| Op-amp precision rectifier | Linear to near zero | Magnitude only | Op-amp, diode inside its feedback loop | Hardware-only fix, no fast sampling needed |
| Mid-scale bias, software rectifier | Linear at every load | Full AC waveform | Burden, bias divider | Input samples fast enough to catch the crest |
| Catalog transducer | Linear, per the maker's data | Magnitude only | None | Production panel, documented replacement |
Every hardware row still needs the burden sized within the CT's rating and the gain set so the highest current lands inside the module's span; the table only decides where the nonlinearity goes.
Do you need one sensor per phase on a three-phase motor? #
One sensing channel measures the one conductor passing through it, so reporting all three phase currents takes three independent sensors on three analog inputs, while a single phase is enough only when the PLC needs a load indication on a balanced motor and nothing more. The three phase currents of a three-wire motor circuit sum to zero, so routing all three conductors through one window reads only the imbalance — that is a ground-leakage arrangement, not a current measurement. For per-phase reporting, unbalance alarms or single-phasing detection, fit three sensors; the third phase can be computed as the negative sum of the other two, which saves one channel and one sensor. A fault on a phase nobody measures never appears on the channel somebody does.
If the PLC only has to know loaded versus unloaded, skip analog entirely: a current-operated switch closing a digital input does that job, as laid out in measuring three-phase motor current for a PLC alarm input.
Should you build the chain or buy a ready-made transducer? #
Buy when uptime and the next technician matter: catalog current transducers come with 4-20 mA, 24 V DC loop-powered or self-powered voltage outputs that land on the PLC module as they are, and 20 mA across 500 Ω already spans 2 to 10 V. The datasheet states ratio, burden and linearity, and the loop's live zero is a diagnostic a homemade voltage link lacks — no current means a broken wire, the low end of the loop means genuinely no load current. Current also crosses a noisy panel better than a voltage does.
Build when it is a one-off, a prototype or a retrofit where no catalog window fits the conductor. The decision in one line: prototype on the bench with the gain-first or software chain, then buy the catalog part for the panel that has to run without its designer.
How do you verify the scaled reading before you trust it? #
Trust the reading only after a clamp comparison at three load points — light, half and full — with a true-RMS clamp on the same conductor, because the bridge chains hide their worst error exactly at the light-load point nobody tests. Energize through a real load and work the list:
- Record the PLC's raw counts and scaled amps at light, half and full load.
- On a drive-fed motor, clamp with a meter rated for drive output waveforms — choosing one is covered in measuring VFD and soft starter current with the right meter.
- Derive volts-per-amp from the measurements, check it against the design math, and enter the measured constant, not the paper one, in the program.
- Sweep the low end specifically on bridge chains, because that is where the dead band lives.
- Expect an average-reading hardware chain to disagree with a true-RMS clamp on distorted current; the software chain's true RMS should match it within sampling limits.
- Put the ratio, burden, gain and threshold assumptions on the drawing so the scaling can be re-derived without the original designer.
Questions asked
What happens if the burden resistor is bigger than the CT's rating?
The core saturates toward the top of the range: the ratio folds, readings clip early, and calibration that held at mid-load no longer holds at full load. Convert a volt-ampere rating to a resistance limit by dividing VA by the square of the secondary current, then keep the fitted resistor safely under it.
Can a resistor-capacitor filter replace fast sampling after the rectifier?
Yes on a clean sinusoidal load. A filter after the bridge or precision rectifier gives a DC average proportional to current, and for a full-wave rectified sine that average is about 0.637 of the peak, which you calibrate against a clamp. On a drive output the waveform is not a sine, so an average-reading chain drifts away from a true-RMS clamp.
Does a Hall-effect sensor avoid all this conditioning?
It removes the rectifier, since the sensor emits a voltage proportional to current, but not the scaling. Current-output Hall types run from split supplies such as plus and minus 12 or 15 V and swing bipolar, so they still need level shifting into the analog input's unipolar span, and the zero offset wants a trim at known-zero current.
What scaling constant goes into the PLC program for the biased-input method?
Divide rated primary current by the burden voltage at that current. With 300 ohms, full rated current gives 3.0 V RMS, so the program computes amps as the RMS of sample minus the 5.0 V bias, times 3.33. Re-derive the constant from your own turns ratio and burden instead of copying the example.