Ground fault detection on an ungrounded 4.16 kV delta
Short answer
A 4.16 kV delta secondary has no neutral, so a ground fault draws only a few amperes of charging current and a ground-overcurrent relay has nothing to measure. Detect it with three grounded-wye, broken-delta VTs and a 59G relay reading 3V0, with VT primaries rated for the full line-to-line voltage, or with an insulation-monitoring relay through a coupling device; to trip feeders selectively, add a zig-zag grounding transformer first.

On this page
- Why the delta gives a ground relay nothing to measure
- The broken-delta scheme and what the 59G relay measures
- Rate the VT primaries for the full line-to-line voltage
- Worked example: the corner voltage and the settings
- Insulation monitoring through a coupling device
- When tripping is required, create the neutral first
- The decision, scheme by scheme
- Commissioning checks before the bus goes live
- Questions asked
An ungrounded 4.16 kV delta secondary has no neutral, so a line-to-ground fault can draw only the network's capacitive charging current — usually a few amperes — and a ground-overcurrent relay has almost nothing to measure. Detection has to work on voltage or on insulation resistance. The standard scheme is three voltage transformers connected grounded-wye on the primary and broken-delta on the secondary, with a 59G voltage relay across the open corner reading 3V0 and a loading resistor to damp ferroresonance; the alternative is an insulation-monitoring relay applied through a voltage coupling device. Whatever the scheme, the VT primaries must be rated for the full line-to-line voltage of the bus. If the plant wants breakers to trip instead of alarms to annunciate, a zig-zag grounding transformer has to create the neutral first.
Why the delta gives a ground relay nothing to measure #
IEEE 142-2007 defines an ungrounded system as one with no intentional connection to ground except through measuring devices, and on this bus those devices are the detection VTs themselves: their wye-connected primaries, neutral grounded, are the only earth reference the system has. When a phase faults to ground, the fault current is just the charging current of the cables, motors and surge capacitors on the two healthy phases — typically a few amperes, which is why ground relays for ungrounded systems are built for high sensitivity — and a 51G element on the delta secondary has no neutral and no resistor current to see at all.
The fault also moves the voltage. With phase A grounded, the neutral sits at A's potential: A-to-ground collapses toward zero while B and C rise to full line-to-line voltage, 173% of their normal value, and hold it as long as the fault stays on. Detection on a delta is therefore an alarm-and-locate function, not permission to run a faulted bus indefinitely. The underlying asymmetry — a grounded wye sources ground fault current and a delta does not — is worked through in detail in why a grounded wye sources ground fault current and a delta does not.
The broken-delta scheme and what the 59G relay measures #
Connect three VTs with grounded-wye primaries and wire their secondaries in delta, leaving one corner open; the voltage relay goes across that opening in series with a damping resistor. The corner voltage is the phasor sum of the three phase-to-ground voltages — three times the zero-sequence component, 3V0. On a healthy balanced bus the sum cancels and the corner reads near zero; what remains is a few volts of residual from phase unbalance and the triplen harmonics, which the delta connection adds arithmetically. Any ground displacement produces real 3V0: a bolted fault drives the corner to its full value, and an intermittent arcing fault throws brief excursions above it.
The corner resistor has two jobs: it loads the zero-sequence circuit so the VT magnetizing inductance cannot ring against the system capacitance (ferroresonance), and it limits the thermal duty the VTs and relay carry during a sustained fault. It stays in circuit at all times; the corner is never closed out. For the wiring and element setup on a delta-delta transformer, the walkthrough of configuring ground overvoltage and directional protection on ungrounded delta-deltas covers the connection end to end.
Rate the VT primaries for the full line-to-line voltage #
Each VT normally sees only the phase-to-ground voltage, about 2402 V on this bus, so the tempting purchase is a 2400:120 V unit — a ratio of 20:1. A ground fault is exactly the condition that breaks that logic: the system neutral moves onto the faulted phase, and each healthy-phase VT primary then stands at the full line-to-line voltage, three times its normal value, continuously, for as long as the fault persists. A restriking fault piles transient overvoltages on top. The 20:1 primary is stressed at three times its design voltage, fails, and the bus loses its only ground reference and its only means of detection with it.
Specify for the fault, not for the normal state: 4200:120 V primaries (ratio 35:1) on a delta bus like this one, and burden ratings that tolerate the elevated voltage and the corner-resistor duty for the full clearing time rather than for a short-time rating.
Worked example: the corner voltage and the settings #
Take the bus with 4200:120 V VTs, so the ratio N = 4200/120 = 35:
- Normal phase-to-ground voltage: 4160 V / 1.732 = 2402 V.
- Bolted A-phase-to-ground fault: the neutral rides on A, so the zero-sequence component is one full phase value and 3V0 = 3 × 2402 V = 7206 V referred to the primary.
- Corner voltage at the relay: 7206 V / 35 = 206 V. With 4160:120 V VTs (ratio 34.7) the same fault gives 208 V, so the scheme is insensitive to that ratio choice.
Settings come from a measurement, not from the calculation alone. Suppose commissioning measures 1.8 V of residual across the corner on the healthy bus, read with a true-RMS meter suitable for the VT secondary. A pickup of 10 V is more than five times that residual and still catches any fault that displaces the neutral by about 5% (10 V against the 206 V full-fault value); a 2 s definite-time delay rides through VT switching and breaker operations. This is the standard broken-delta relation from the relaying texts and IEEE 142's ungrounded-system treatment, and the pickup, delay and outputs verify in a secondary-injection test against the relay manual and the plant's coordination study.
Insulation monitoring through a coupling device #
The second method watches the insulation itself instead of waiting for voltage displacement. An insulation-monitoring relay imposes a measuring signal between the system and earth and alarms when the measured resistance to ground falls below its setpoint, which trends failing insulation days before the first fault. On a medium-voltage bus the relay never connects directly: a voltage coupling device links its measuring circuit to the bus and stands off the system voltage. Its limit is the same as the broken-delta scheme's — no direction — so when the alarm comes, the faulted feeder is still found by switching feeders and watching the indication. Many plants run both: insulation monitoring for the trend, the broken-delta relay for the event.
When tripping is required, create the neutral first #
Detection never turns a delta into a grounded system. If the required response is a breaker opening on ground fault, add a grounding transformer — zig-zag or grounded-wye/delta — to the bus and connect its neutral through a resistor. That converts the bus to resistance grounding: fault current becomes a defined, limited value, the healthy phases stay near normal voltage to ground, and conventional 50G/51G elements coordinate feeder by feeder. The grounding transformer has to carry the system's charging current for the clearing time — the same sizing exercise as sizing a neutral grounding transformer on a 22 kV feeder — and the resistor sets the fault current the scheme will manage. This is a change of grounding philosophy that belongs in the system study, not a detector bolted to the panel; equipment ratings and the arc-flash study are re-checked with it.
The decision, scheme by scheme #
The detection itself is not optional: NFPA 70, the National Electrical Code, 2023 edition, requires ground detection on ungrounded systems, with the over-1000-volt provisions in Article 250; confirm the adopted edition and local amendments with the authority having jurisdiction. Which scheme fits follows from what the bus must do:
| Requirement on the bus | Scheme | What it gives you |
|---|---|---|
| Alarm on any ground fault and keep running | Grounded-wye/broken-delta VTs with a 59G relay and corner resistor, primaries rated for line-to-line voltage | A 3V0 alarm; trace and clear the fault promptly |
| Trend insulation before the first fault | Insulation-monitoring relay through a voltage coupling device | A resistance-to-ground trend and early alarm |
| Point at the faulted feeder without tripping | Sensitive directional (67N) elements on the feeders | Directional ground-fault indication while the bus stays up |
| Trip the faulted feeder automatically | Zig-zag grounding transformer with a neutral resistor, 50G/51G per feeder | Defined fault current and selective tripping |
Directional feeder identification needs sensitive elements applied with the right polarization and angles — ground overvoltage and directional relay settings for ungrounded system protection collects the setting practice for those cases.
Commissioning checks before the bus goes live #
- De-energize, lock out and verify absence of voltage with a rated tester before any wiring inside the switchgear — NFPA 70E, 2024 edition, defines this as establishing an electrically safe work condition, and a medium-voltage panel is never worked on live.
- Check the VT nameplates: primaries rated for line-to-line voltage, wye point solidly grounded, polarities consistent around the secondary delta.
- Confirm the corner resistor is installed, sized for the sustained 3V0 duty, and in circuit permanently.
- Energize the healthy bus, measure the corner voltage with a true-RMS meter, and set the relay pickup above it with margin — the worked example shows the relation.
- Secondary-inject the voltage element at pickup and at the sustained-fault voltage; confirm pickup, delay and alarm or trip outputs.
- Record the final settings and the fault-tracing procedure with the operating instructions.
Questions asked
Why do the ground-detection VTs need a 4200:120 V primary and not 2400:120 V?
A ground fault shifts the system neutral onto the faulted phase, so each healthy-phase VT primary stands at the full 4160 V line-to-line voltage continuously instead of the 2402 V it normally sees. A 20:1 unit sized for the phase-to-ground voltage is stressed to three times its design value; the 35:1, 4200:120 V rating carries the fault duty indefinitely.
How much voltage does the 59G relay see when a phase faults solidly to ground?
It sees 3V0: three times the normal phase-to-ground voltage referred through the VT ratio, so 3 × 2402 V / 35 = 206 V at the corner on the worked example, held for the entire clearing time. Intermittent restriking faults can push brief excursions above that, which is why the corner resistor's thermal duty and the relay's input rating are both checked against the sustained value.
Can a 51G ground-overcurrent relay be added to the delta secondary directly?
No. The delta has no neutral and no intentional ground path, so a line-to-ground fault draws only the network's capacitive charging current; a 51G element has no neutral or resistor current to measure. The overcurrent route exists only after a zig-zag grounding transformer and neutral resistor give the bus a real neutral and a defined, limited fault current.
Can the bus keep running with the ground-fault alarm active?
It can, and riding out a first fault is the point of detection-only operation, but the two healthy phases then hold full line-to-line voltage to ground, aging cable and motor insulation, and a second fault on another phase becomes a phase-to-phase fault at full current. Trace and clear promptly; how long to run faulted is an operations decision made with the equipment ratings and the authority having jurisdiction.