A wye-delta bank that creates a neutral on a 3-wire 22 kV feeder is sized by the duty that neutral carries. A continuous 10 A single-phase load puts 127 kVA on one primary winding, so the three-phase nameplate lands near 381 kVA — take the next common rating, 500 kVA. A grounding-only neutral is sized from phase-to-ground voltage × fault current × a duration factor K.
On this page
On a 3-wire 22 kV feeder, a wye-delta transformer earns its keep by creating a neutral, and its size comes from what that neutral carries — not from the 0.4 kV secondary and not from the length of line it feeds. A continuous 10 A single-phase load pushes the full 10 A through one primary winding at 22,000 V divided by 1.732, about 12.7 kV, so that winding carries 127 kVA and the three-phase nameplate lands near 381 kVA; the next common rating is 500 kVA. A grounding-only neutral sizes instead from the fault duty: phase-to-ground voltage × ground-fault current × a duration factor K. Decide which duty the neutral has, and the number follows.
A wye-delta bank, two possible duties #
A 22/0.4 kV wye-delta bank tied to a 3-wire feeder can do one of two jobs, and they need different transformers. The wye primary forms the star point you run out as the new neutral. The closed delta gives zero-sequence current a return path, and that closed loop is what makes the star point behave like a real system neutral, so it stays closed whatever else you decide.
Bond the star point to earth once, at the transformer, and size for the current it must carry:
- Continuous unbalanced load: single-phase loads connected between a phase and the new neutral drive their full current through one primary winding and back along the neutral conductor, all day.
- Ground-fault current: a phase-to-ground fault anywhere on the system returns through the wye windings to the star point. The grounded wye is what lets the bank source ground-fault current at all — a delta by itself sources none, as why a grounded wye sources ground-fault current and a delta does not explains.
Both duties can coexist. Size for both and keep the larger rating.
Load duty: one winding carries the whole load #
Worked example, inputs stated: three-phase, 22 kV line-to-line, 50/60 Hz (frequency does not change the kVA arithmetic); one continuous single-phase load of 10 A between phase A and the new neutral; secondary unloaded.
The load current's path is fixed: from the star point along the neutral conductor, through the load, back on phase A, and down primary winding A to the star point. Winding A carries the full 10 A; windings B and C carry almost nothing. The voltage across one winding is line-to-line divided by the square root of three:
22,000 V / 1.732 = 12,702 V ≈ 12.7 kV
Winding A duty:
12.7 kV × 10 A = 127 kVA, continuously
That is a 127 kVA continuous duty sitting on one leg. A standard three-phase transformer has three equal windings, so the nameplate must cover one leg doing the entire job: 3 × 127 = 381 kVA, and the next common three-phase nameplate above that is 500 kVA. The old "three times the single-phase load" rule is genuinely right here, because the connection puts the whole load on one winding — not because it is a universal formula. The arithmetic is exact, but the selection stays an estimate until the manufacturer confirms the continuous unbalance on the named design; the winding-by-winding logic is the same one behind primary current for a single-phase load on a three-phase transformer.
The delta reacts to the same load. The zero-sequence third of the load current, 3.33 A, circulates in the closed delta transformed by the winding ratio, 12,702/400 = 31.8: 3.33 A × 31.8 ≈ 106 A in each delta winding. Where that neutral current splits across the windings is exactly what tracing three-phase neutral current in wye transformers walks through.
Ground-fault duty: current, time and a factor K #
If the neutral only anchors the system ground, the current you size for is the expected ground-fault current and the time is how long protection takes to clear it. The utility sizing rule, published in the Westinghouse Electrical Transmission and Distribution Reference Book (1964), reads:
short-time three-phase kVA = phase-to-ground voltage in kV × ground-fault current in A × K
K follows the allowed fault duration:
| Allowed fault duration | K |
|---|---|
| 10 s | 0.064 |
| 1 min | 0.104 |
| 2 min | 0.139 |
| 3 min | 0.170 |
| 4 min | 0.196 |
| 5 min | 0.220 |
Worked example, inputs stated: the same feeder as above, phase-to-ground 12.7 kV; a ground-fault current of 100 A fixed by the system study; back-up protection clearing in 5 min, so K = 0.220.
12.7 kV × 100 A × 0.220 = 279.4, call it 280 kVA short-time
Clear the same fault in 10 s and the duty falls to about 81 kVA — duration is the lever here, worth a factor of roughly 3.4 on this feeder. Treat both results as estimates to be checked against the governing code and against the manufacturer's short-time thermal and mechanical withstand data for the named design, and use a clearing time your protection study actually commits to. The same short-time logic applied to a specific duty is what grounding transformer short-time rating for a 30 s fault works through, and when a resistor rather than the bank impedance sets the fault current, the resistor must carry that current for the same duration — neutral grounding resistor design for large transformers covers that sizing.
Which rating you actually order #
- Neutral carries single-phase load: continuous duty governs. Give one primary winding the entire largest single-phase load at the phase-to-ground voltage and take the nameplate near three times that load — 500 kVA class for the worked case. Have the manufacturer confirm the continuous unbalanced loading and the delta circulating current.
- Neutral only grounds: short-time fault duty governs. Fix the ground-fault current with a study, pick K from the committed clearing time and apply the formula; 100 A cleared in 5 min gave 280 kVA here.
- Both duties: the larger size wins, and the smaller duty still gets confirmed in writing.
This is usually utility-side work, so the grounding requirements come from IEEE C2, the National Electrical Safety Code, 2023 edition, which covers grounding of utility supply systems; on the premises side, NFPA 70, the National Electrical Code, 2023 edition, Article 250, covers when and how a system is grounded. Requirements differ by country, edition and local amendment, so confirm the governing requirement with the authority having jurisdiction, the serving utility and the transformer documentation. Before ordering, mark the one-line diagram: source grounding, the new star point, its single earth connection, and whether each conductor is a load neutral or a grounding conductor. Creating a neutral where none existed repeats the same traps at other voltages, as isolation transformer design checks for a new 480 V neutral shows.
Set the protection with the bank in mind too. Energizing a grounded-wye bank pushes magnetizing inrush out through the neutral, which is why transformer inrush appears on grounded wye neutrals, so a neutral relay has to ride through closing instead of tripping the feeder. Grounding the star point also changes what the feeder's relays and voltage transformers see; the protective relaying implications of a grounded wye VT primary neutral are worth checking before any ground protection is set.
Before you close it in #
De-energize the feeder, test for absence of voltage on every phase, and apply working grounds before anyone opens a terminal box, the neutral connection or the transformer tank on this run. After installation: bond the star point to earth at exactly one point, verify phase-to-phase and phase-to-neutral voltages under the real unbalanced load, and record the standing neutral current against the winding rating you ordered. Prove ground-fault tripping with the protection's own test function — never by putting a fault on a live system.
Questions asked
Why three times the single-phase load for a wye-delta neutral?
The whole single-phase current runs through one primary winding, at the phase-to-ground voltage, around the clock. The other two windings carry almost nothing, but a standard three-phase transformer has three equal windings, so the nameplate has to cover one winding doing the entire job. That lands near three times the single-phase load kVA. A custom design with an oversized phase winding can change the split, but that is a conversation with the manufacturer, not a default.
Which fault duration do I use when picking K?
Use the longest time your back-up protection needs to clear a ground fault, not the fastest trip in the chain. The published factors run from 0.064 for a 10 s clearing through 0.104 at 1 min, 0.139 at 2 min, 0.170 at 3 min, 0.196 at 4 min and 0.220 at 5 min. Longer assumed clearing times make the short-time rating larger, so an honest clearing-time study saves real kVA.
Does the 0.4 kV delta winding have to stay closed?
Yes. The closed delta is what gives the wye star point a zero-sequence path; open it and the point stops behaving like a system neutral and the phase-to-ground voltages can drift. Load the secondary only if the manufacturer has rated the windings for that duty on top of the circulating current and any fault duty. For a grounding-only bank, leave it closed and unloaded.
Can I order a small distribution transformer and use only its neutral?
Not on faith. Neutral current heats the primary windings even with the secondary unloaded, and a standard distribution transformer is not built or tested for ground-fault duty unless its maker says so. Ask for the short-time thermal and mechanical withstand at your stated fault current and duration, the permitted continuous unbalanced loading, and written confirmation that the intended connection is suitable for the service.