Explainer
Metering compartment arc flash labels on low voltage switchgear
Short answer
A metering compartment on a low voltage switchgear assembly carries the same analyzed incident-energy label as the breaker compartments unless the arc-flash study separately models that compartment and its feed. A lower value must come from a documented calculation, not from the compartment name. Never open an energized CT secondary: short it first.

On this page
- What NFPA 70E and the NEC require
- Why the metering compartment inherits the assembly value
- The one arrangement that can justify a lower value
- Worked example: fault current at a separately fed metering cabinet
- Before the door opens
- CT secondaries: short them first, label or not
- The decision, case by case
- Questions asked
Your customer's request is reasonable, and the study you already have settles most of it: a metering compartment in a low voltage switchgear lineup carries the same analyzed incident-energy label as the feeder breaker compartments unless the arc-flash study separately models that compartment and its feed. Neither NFPA 70E nor IEEE 1584-2018 hands a smaller number to a door that holds meters instead of breakers; a lower value has to come out of a calculation run at that location. The CT question is separate and harder-edged. A current transformer secondary is never opened while the primary carries current — it is shorted first — and that hazard is a shock and insulation-damage problem, not a modeled arc-flash event. This page gives the label rule, the worked arithmetic for the one arrangement that can support a lower value, and the work practice for the CT circuits.
What NFPA 70E and the NEC require #
NFPA 70E, 2024 edition, Article 130.5(H), requires equipment likely to be examined, serviced or maintained while energized to be field-marked with the incident energy at the working distance, the minimum arc rating of clothing, the arc flash boundary and the nominal system voltage. Labels in practice carry the study date as well, because the same edition requires the incident energy analysis to be updated whenever the distribution changes and reviewed at intervals not exceeding five years.
The NEC, NFPA 70, 2023 edition, 110.16, reaches the same doors: switchboards, switchgear, panelboards, industrial control panels, meter socket enclosures and motor control centers that are likely to need work while energized must be marked, and meter sockets are named in that list beside the gear. Confirm both requirements with your authority having jurisdiction and the equipment documentation, because local amendments and editions move the details.
The marking requirement attaches to equipment, not to breaker buckets. When your study models the switchgear as one bus, the analysis has one result for the assembly, and 130.5(H) is satisfied by marking every compartment door with that result — the metering door among them.
Why the metering compartment inherits the assembly value #
IEEE 1584-2018 computes incident energy from the bolted fault current at a point, the clearing device and its operating time, the enclosure and electrode configuration, the conductor gap and the working distance. No input reads a compartment's name. When metering voltage is tapped from the bus — PT primaries landed on the bus, fuse cutouts and terminal blocks carrying bus voltage behind the metering door — the conductors behind that door are at bus potential with the bus fault capability, and the study's bus result already describes an arc among them.
The meter itself is irrelevant to that calculation. An arc is fed by the source, not by the load it happens to light up, so meters drawing fractions of an ampere say nothing about what the bus delivers into a fault. Confusing the load with the source is the whole error behind the assumption that a metering door is automatically safer, and NFPA 70E writes no exemption for compartments with a small connected load.
The one arrangement that can justify a lower value #
Two as-built configurations support a separate analysis, and both require the study to actually model them before a smaller number is printed.
PT-fed metering with no bus conductors in the compartment. The door exposes fused PT secondary wiring at 120 V and shorted CT circuits, with the PT primaries and fuse cutouts in an adjacent cubicle behind their own barrier. Modeled as its own location, that compartment can produce a far lower value than the bus. IEEE 1584-2018 is validated for three-phase systems from 208 V through 15 kV, so a 120 V secondary sits below the model's floor and is covered instead by NFPA 70E's PPE-category tables or a documented engineering evaluation — the same ground the article on evaluating arc flash risk in 240 V and lower panels walks through.
A separately wired instrument enclosure. Conductors run from the bus to a free-standing metering cabinet. Model that feeder — conductor size, length, raceway — compute the available fault current at the cabinet the way the worked example below shows, then run the arc-flash calculation for that location. It is the same move as modeling an MCC bucket for an arc flash study, applied to a metering load.
Either path ends with a wiring check: de-energize, open the compartment, trace the conductors and confirm the as-built matches the model before the lower label goes on the door. A lower label with no calculation behind it in the study file is just a smaller sticker, and a sticker that understates the hazard is the dangerous kind.
Worked example: fault current at a separately fed metering cabinet #
Example inputs, stated so you can redo every step: a 480 Y/277 V, three-phase, 60 Hz switchgear whose study lists 42 kA of three-phase bolted fault current at the bus and a label of 12.4 cal/cm² at the 455 mm working distance with a 1.5 m arc flash boundary; a metering cabinet wired separately from that bus through a dedicated run of three #10 AWG copper conductors, 25 ft, in steel conduit. These are illustrative numbers for the method, not a rating of any particular gear.
- Source impedance behind the bus: 480 V ÷ (1.732 × 42,000 A) = 0.0066 Ω per phase.
- Conductor: NEC Chapter 9, Table 9 lists about 1.2 Ω per 1000 ft of #10 AWG uncoated copper at 75 °C, so 25 ft gives 1.2 × 25 ÷ 1000 = 0.030 Ω per phase. Reactance of #10 in steel conduit adds about 0.002 Ω at this length and does not move the result.
- Total impedance per phase: 0.030 Ω + 0.0066 Ω = 0.0366 Ω.
- Available fault current at the cabinet: 480 V ÷ (1.732 × 0.0366 Ω) = 7,570 A, about 7.6 kA — less than a fifth of the bus value.
Twenty-five feet of #10 cut the available fault current from 42 kA to about 7.6 kA. That 7.6 kA, together with the real clearing device and its operating time, is what the study software feeds into IEEE 1584-2018 for the cabinet location; the cabinet's label comes from that run of the model, not from this hand arithmetic. Treat the hand result as an estimate — it leaves out the X/R ratio, motor contribution and conductor temperature, which the study includes — and let the study file and the equipment documentation carry the final number.
Before the door opens #
De-energize and verify absence of voltage before opening any compartment door whenever the switching plan allows it. The verification test is itself an exposure on labeled equipment; the article on what incident energy applies to a LOTO voltage test on a breaker covers the tester's position and the label value that governs it.
If the meter must be swapped, or the CT circuit worked on, with the gear energized, NFPA 70E counts that as energized work, and the page on why energized work permits require documented justification gives the justification and permit requirements that apply before anyone opens the door. No compartment's small circuits excuse that step — the permit discipline is what keeps an unplanned task from becoming the event nobody modeled.
CT secondaries: short them first, label or not #
A current transformer is a current source. A 400:5 CT, as an example ratio, delivers 5 A of secondary current for every 400 A through the primary, and with the secondary closed the terminal voltage stays at the small burden voltage. Open the secondary while the primary carries current and that drive has nowhere to go but into voltage: the core slams into saturation every half-cycle and the winding develops narrow high-voltage spikes limited only by its insulation — voltage high enough to puncture insulation and to injure a worker holding a test lead.
The typical field failure is a flash and smoke at the break and a ruined transformer: a localized event, not a large burn-producing arc. There is no incident-energy number for it — IEEE 1584-2018 has no input for a CT secondary break, so no label predicts or bounds it. That absence is not permission. The control is mechanical: with the door rules above satisfied, operate the shorting block in the metering compartment so every CT secondary is shorted to common, confirm current now flows through the short with a clamp-on ammeter, and only then lift the meter leads. This is also why CT circuits carry shorting blocks instead of fuses: a blown fuse is an open circuit in exactly the place an open cannot be tolerated.
The decision, case by case #
- Study models the lineup as one assembly: label every compartment door, metering included, with the assembly result — in the worked example, 12.4 cal/cm² at 455 mm. One printed label per door; identical values on adjacent doors are compliant, not lazy.
- Metering circuit wired separately from the bus: compute the feeder, run IEEE 1584-2018 at the cabinet with the real clearing device, verify the as-built wiring against the model, and label from that documented result.
- PT-fed metering with no bus conductors behind the door: model the compartment as its own location and label from that analysis; until the study contains it, the assembly label stands.
- CT secondaries: shorted at the shorting block before any meter work, always. That hazard is controlled by procedure and hardware, never by a label value.
Questions asked
Does the arc flash label go on each compartment door or once per lineup?
One label per compartment door is common practice when a customer asks for individual labels: each door carries the result the study assigns to the location it exposes, and doors exposing the same bus carry the same value. NFPA 70E, 2024 edition, marks the equipment rather than each breaker bucket, so identical labels on every door satisfy Article 130.5(H) as long as each value matches the study for that spot. A door whose study shows a separate, lower location carries its own number.
What physically shorts the CT circuit when the meter comes out?
The shorting block: a terminal strip in the metering compartment whose slide or screw links each current transformer secondary to common before any meter lead is lifted. Operate it, confirm current flows through the short with a clamp-on ammeter, then disconnect the meter. Do not count on the meter's own shorting contacts unless the meter's documentation states that removal shorts the circuit, and never open a live secondary to see what happens.
Do the PT fuses lower the metering compartment's incident energy on their own?
No. A fuse limits current only downstream of itself. A fault in PT primary wiring, a fuse cutout or its lugs sits upstream of the fuses and is fed at the bus's full available current. Fusing limits the 120 V secondary location instead, and that location still needs its own modeled, documented analysis before its label drops below the assembly value.
The customer wants a lower number for the metering door. What do you hand over?
The study file: the assembly calculation, plus, if a separate metering location actually exists, the run that models it, with the feeder size and length, the clearing device and its operating time, and the as-built wiring verification. A lower number without those documents does not go on the door. Keep the analyzed assembly label in place until the calculation exists in the file, and put the discussion in writing.