Troubleshooting
PLC rack noise near a large motor starter
Short answer
It can be done: the rack survives the starter because the steady current only sets a slow power-frequency field, while the damage comes from switching transients on the shared control supply and noise coupled into control wiring. Keep the rack in place, prove it with repeated start-and-stop cycles, then correct bonding and routing before adding a listed surge protective device.

On this page
- What actually disturbs the rack
- Checking the proximity field from a 350 A conductor at 5 in
- Testing through repeated switching before you move anything
- Correcting protective bonding first
- Separating control wiring from the power conductors
- Surge protection on the PLC supply, installed last
- Release criteria
- Questions asked
It usually works, and the current by itself is the wrong thing to fear. A rack mounted 5 in from a 350 A starter sits in a power-frequency field of roughly half a millitesla — real, but slow, and it couples into wiring loops rather than into logic. What resets racks and flips inputs is what the starter does when it switches: the coil transient dumped onto the shared control supply, the arc at the contacts, and noise picked up by control wiring that runs alongside the power conductors. So keep the rack where the layout puts it and prove the panel: cycle the starter through repeated starts and stops with the diagnostics in view. If the rack misbehaves, correct the protective bonding and the routing first, then fit a listed surge protective device on the PLC supply. Never give the controller its own isolated ground; that makes the noise worse and the panel less safe.
What actually disturbs the rack #
The mechanisms, in the order they cause trouble:
- Conducted transients on the control supply. Interrupting a contactor coil releases its stored energy as a fast voltage spike on the branch that also feeds the PLC supply, and the arc at pickup and dropout adds high-frequency noise to the same wires.
- Coupling into control wiring. Input, output and network cables that run parallel and close to the starter's conductors pick up energy along the shared run; the coupling grows with the length of that run and falls steeply with separation.
- Reference shifts on the bonding network. Switching currents returning through a loose or high-impedance bond lift the rack's reference against its field devices, and the inputs read the difference.
- The steady running current. It produces the power-frequency field the worked example below sizes — the slowest and least troublesome of the four.
If the same enclosure holds a drive, treat the panel as a harder environment: a drive's output edges switch far faster than a contactor's.
Checking the proximity field from a 350 A conductor at 5 in #
The question is whether the case's steady current can reach the rack. The inputs, with their sources:
- Current in the nearest power conductor: 350 A — the running current named in the case.
- Distance from that conductor to the rack: 5 in — the proposed mounting gap; 5 in × 0.0254 m/in = 0.127 m.
- Supply frequency for the induced-voltage check: 60 Hz — the frequency this case assumes.
- Permeability of free space: 4π×10⁻⁷ H/m — a physical constant, written μ0 in the formula.
The rule, in words: the field of a long straight conductor equals the permeability of free space times the current, divided by 2π times the distance from the conductor. The arithmetic:
B = μ0 × I / (2π × r)
B = (4π×10⁻⁷ H/m × 350 A) / (2π × 0.127 m)
B = (2×10⁻⁷ × 350 / 0.127) T
B = 7.0 × 10⁻⁵ / 0.127 T
B ≈ 5.5 × 10⁻⁴ T = 0.55 mT
Result: about 0.55 mT (5.5 gauss) at the rack face, and that is the worst case — the other two phase conductors sit beside the first and their fields partly cancel at this distance. The field falls as 1/r, so tripling the gap to 15 in cuts it to about 0.18 mT.
Decision: this number says keep the rack in place for the switching test. A power-frequency field induces voltage in proportion to frequency and loop area, and one volt at 60 Hz would need A = 1 V ÷ (2π × 60 Hz × 5.5 × 10⁻⁴ T) ≈ 4.8 m² of loop — more area than the whole panel can enclose. The steady current is not the noise source; the switching event is. The relocation threshold is the retest, not the amp rating: move the rack only if the symptom survives corrected bonding, routing and supply protection, and then triple the gap in one move.
Testing through repeated switching before you move anything #
- Write the baseline before touching anything. Record which event lines up with the symptom — pickup, dropout or running — and which function it hits: the supply, discrete inputs, analog inputs, outputs or the communications link.
- Put the machine into a safe test state under its own procedure and cycle the starter through repeated starts and stops while the rack's status indicators and I/O tables are in view on the programming tool.
- Log every reset, false input transition and communication error against the event that produced it, so each later change can be judged against the same events.
- Repeat the run on the final layout, enclosure closed; dressing changes as a panel gets finished.
Decision: a rack that stays clean through the full count is proven at that position — leave it there. A repeatable symptom sends you to bonding and routing, one change at a time.
Correcting protective bonding first #
This is dead-panel work: de-energize the enclosure, lock it out and test for absence of voltage before you open it.
- Bond the rack to the enclosure the way its instructions require; on painted steel that usually means bare metal at the mounting points or the bonding hardware the maker specifies.
- Land the equipment grounding conductor on the panel's grounding terminal and bond the door to the frame with a jumper — doors are a commonly missed bond.
- Ground the control-power source as its design intends; the grounded-versus-floating choice for a control transformer secondary is covered in grounded or floating control power transformer secondaries in MCCs, and it sets the reference the rack's inputs share.
- Keep it one system. NFPA 70, the National Electrical Code (2023 edition), Article 250, requires conductive parts likely to become energized to be bonded to the supply's grounding system; there is no code-legal isolated ground rod just for the controller, and a floating reference invites current through signal wiring. Confirm the arrangement with the authority having jurisdiction and the equipment documentation.
- Verify continuity with the site's approved low-resistance test method and retighten whatever you found loose.
Separating control wiring from the power conductors #
Same dead-panel condition as the bonding checks.
- Dress the starter and motor conductors down one side of the enclosure and the PLC power, I/O and network cables down the other; no shared duct, no bundling.
- Where a crossing is unavoidable, cross at right angles with no parallel overlap.
- Where the cable and device instructions call for shields, terminate them exactly as those instructions say; a shield never substitutes for the protective bond.
- With a drive in the panel, its installation guidance already requires control wiring to be separated from the power conductors — the same discipline that keeps a network quiet in installing a robust PROFIBUS DP network inside an MCC applies to every cable here.
- Re-run the switching test after the re-dress, before you change anything else.
Surge protection on the PLC supply, installed last #
A surge protective device clamps the conducted spike — the coil-collapse transient — on the branch feeding the PLC supply. It does nothing for coupled field noise or a bad bond, which is why it comes after the corrections above. TVSS is the older name; the device is now listed to UL 1449, the Standard for Surge Protective Devices. Choose one whose voltage rating matches the control supply, connect it exactly as its instructions direct, then repeat the same cycle count.
Suppressing the spike at its source is worth more than clamping it downstream: an RC network or varistor across the contactor coil, of a type the starter's instructions permit, stops the transient before it reaches any branch. Read those instructions first, because some coil suppressors lengthen drop-out time and the starter documentation will say so.
If the rack runs from a Class 2 supply, that rating is about energy limiting, not surge protection — why a Class 2 supply is not surge protection on a safety circuit shows where that assumption fails.
Release criteria #
- The full event set — pickup, running, dropout, plus drive operation if one is fitted — cycles without unexplained resets, false input transitions or communication loss.
- Every correction was tested on its own, so its effect stays attributable.
- The as-built routes, bond corrections, the added suppressor and the test results are recorded with the machine documentation, so the next intermittent fault has a known-good state to compare against.
- If a temporary separation change carried production through, it is documented and the permanent correction is scheduled; no interlock was bypassed and no diagnostic suppressed to pass the test.
- If the symptom survives bonding, routing and supply protection, capture the control supply and the disturbed signals on an instrument during the switching event, working under your site's NFPA 70E (2024 edition) practices — and let the waveform pick the next move, which at that point is the relocation, with the gap tripled.
Questions asked
How many switching cycles prove the rack is clean?
As many as it takes to expose the original failure rate. If the fault showed up roughly once per shift, a dozen quiet cycles mean little: reproduce the failure with the original layout first, note how many switching events it took to appear, then run at least that many after every change. A corrected panel passes only on the full count.
Where is the best place to mount the surge protective device?
As close to the rack's supply terminals as its instructions permit. The connecting leads are part of the clamp path, and each added length raises the let-through voltage the PLC power supply actually sees during the spike, so a device mounted at the far end of the enclosure gives away much of its protection. If a control transformer feeds the rack from the same enclosure, protecting that secondary branch covers the path the contactor-coil transient travels.
The panel also has a variable frequency drive. Does that change the test?
Yes. Repeat the cycles with the drive running at its normal speed and load, not only with across-the-line starting and stopping. A drive's output edges switch far faster than a contactor's, so a panel that passes on starter cycles alone is not cleared, and a low-speed test says nothing about full-speed operation. Include the drive's typical communication traffic in the same run.
Should the controller's mounting plate be isolated from the enclosure to block noise?
No. An unbonded plate removes a path the enclosure's protective bonding relies on and gives fault current nowhere intended to go. Bond the plate, the rack and the door to the panel grounding terminal with short connections, and do the quieting with routing and a solid reference instead. A plate floated for noise reasons is a shock hazard dressed up as an EMC fix.