Short answer

A 3.3 kV, 450 kW motor will start and run on a correctly sized medium-voltage drive, but the Class F VPI insulation is not proven inverter-duty, so get the manufacturer's written withstand against the drive's output before connecting. On DOL, two motors draw 186 A running, 651 A with one starting, 1,116 A with both starting.

On this page
  1. What the nameplate settles and what it leaves open
  2. The standard that defines inverter duty above 600 V
  3. Why pulsed output stresses a line-start winding
  4. The peak a 3.3 kV, 450 kW winding must withstand
  5. The three current cases at the breaker
  6. What to verify before connecting the drive
  7. Commissioning checks
  8. The decision, case by case
  9. Questions asked

Yes, a drive sized for this machine's voltage and power will start and run it — connecting it is not the hard part. The hard part is that this nameplate proves nothing about inverter duty: Class F insulation with vacuum pressure impregnation and a Class B temperature rise is sound line-start construction, but it is not a rating against the fast voltage pulses a drive puts on the motor terminals. That single gap decides the conversion, and one calculation closes it. The second question, the current two such motors put on the breaker when both run direct-on-line, is arithmetic at the motor voltage. This article names the standard that defines inverter duty above 600 V, works that calculation for a 3.3 kV, 450 kW machine, and lists what to verify before you energize anything.

What the nameplate settles and what it leaves open #

Nameplate line What it settles What it leaves open
450 kW, 3.3 kV, duty S1 Voltage class and continuous power for sizing the drive Pulsed-voltage withstand at the terminals
Full-load current 93 A Thermal base for the overload element The drive's input current, set by the drive manual
Starting current 558 A, six times full load Current totals for the DOL start cases Torque available on a controlled ramp
Starting torque 70% of FLT, pull-out torque 205% Across-the-line acceleration margin Low-speed torque the drive must produce
Insulation Class F, temperature rise class B, VPI Thermal class and impregnation quality Inverter-duty transient rating
Stator connection star The terminal arrangement the drive feeds Nothing — keep it unless the maker approves a change

The 295 kgm reference torque and the six-to-one starting multiple are consistent line-start data, and the nameplate's own starting note — direct on line — confirms the motor was built and proved for across-the-line starting. Nothing on this plate states a peak-voltage or rise-rate withstand, and that is exactly the property a drive output demands. VPI describes how resin fills the winding; Class F describes thermal capability. Neither is an inverter-duty certification.

The standard that defines inverter duty above 600 V #

Two documents cover the question. The current edition of NEMA MG-1, Part 31, defines the requirements for definite-purpose inverter-fed polyphase motors: a motor whose base rating exceeds 600 V must withstand a peak terminal voltage of 2.04 times its rated line-to-line voltage, and when a Class F insulation system is used on inverter feed under Part 31, the motor is marked for a maximum ambient temperature of 25 °C. On the IEC side, IEC TS 60034-25 describes the performance characteristics of AC machines supplied from converters, including how machine and converter are matched. Standards are revised, so confirm the edition in force with the documents you purchase against, and check any local requirement with your authority having jurisdiction.

Why pulsed output stresses a line-start winding #

A line starter hands the motor a sine wave that rises and falls smoothly at power frequency. A voltage-source drive instead switches each output phase hundreds to thousands of times a second, chopping its DC bus into pulses whose edges rise in tenths of a microsecond. Each pulse travels down the motor cable, and where the cable's impedance does not match the motor's, the wave reflects — on longer runs the voltage at the terminals can approach twice the pulse height. The edge then distributes unevenly across the winding, so the first turns take a disproportionate share of every pulse: turn insulation, not just the ground wall, is what ages. A sine wave at rated voltage exercises none of that stress. Add the common-mode voltage a drive impresses on the machine, which also drives bearing currents, and you have the reason voltage and power matching is not the acceptance test for this conversion.

The peak a 3.3 kV, 450 kW winding must withstand #

Inputs, each with its source: the motor's rated line-to-line voltage is 3,300 V, from the nameplate data quoted for this machine; the withstand multiplier is 2.04, documented in NEMA MG-1 Part 31 for motors whose base rating exceeds 600 V; the comparison value is the drive manufacturer's documented maximum peak voltage at the motor terminals for your installed cable length and filter set, from the drive's own data.

The rule in words: required peak withstand equals 2.04 multiplied by the rated line-to-line voltage.

The arithmetic, written out: 2.04 × 3,300 V = (2 × 3,300 V) + (0.04 × 3,300 V) = 6,600 V + 132 V = 6,732 V.

Result: a winding that meets Part 31 on this machine must take 6,732 V peak at its terminals, pulse after pulse, without breakdown.

Decision, with its threshold: if the drive supplier's documented worst-case terminal peak for your cable length and filter stays below 6,732 V, and the motor manufacturer states in writing that the VPI Class F system meets the Part 31 peak-withstand requirement, the insulation question is closed. If that written statement cannot be obtained, do not connect the drive as it is: fit the supplier's documented dv/dt or sine filter for the installed cable length and re-check the terminal peak, or keep the DOL starter.

The three current cases at the breaker #

For the direct-on-line arrangement, the nameplate current figures do all the work, because each motor runs at full-load current and starts at about six times that:

Case at the motors Derivation Motor-side current
Both running 2 × 93 A 186 A
One starting, one running 558 A + 93 A 651 A
Both starting together 2 × 558 A 1,116 A

The continuous case is 186 A; the two start cases, 651 A staggered and 1,116 A simultaneous, are what the feeder protection must ride through for the length of a start. These are totals at motor voltage: a breaker sees them directly only when it sits on the same feeder as the motors, and anything upstream of a transformer sees amps scaled by that transformer's ratio, so fix the breaker's position on the single line before you compare anything to a curve.

NFPA 70, the National Electrical Code, 2023 edition, covers motor feeders in Article 430: feeder short-circuit and ground-fault protection is sized from the largest branch-circuit protective device plus the sum of the other motors' full-load currents, and the conductors must carry the running load and the starting duty. Confirm the exact rule and any local amendment with your authority having jurisdiction. When you take the start cases to the breaker's time-current curve, read them as why motor start peaks don't compare to instantaneous breaker settings describes — a starting rms current and an instantaneous pickup are different quantities, and confusing them trips adequate feeders or passes inadequate ones.

Check each starter for an under-voltage release before the first dip, too: a plain held-in contactor can drop out on a sag and then re-accelerate both machines together when voltage returns, putting the simultaneous-start case back on the source a second time.

What to verify before connecting the drive #

  1. Written transient withstand. From the motor manufacturer: a statement that the insulation system withstands the drive's output — peak voltage and rise rate — at the installed cable length, with the Part 31 peak from the worked example above as the minimum you accept. No statement, no connection.
  2. Drive output data. Maximum terminal peak versus cable length, voltage rise rate, pulse rate, and which output filter the supplier documents for your cable run. The filter is part of the recipe, not an optional extra.
  3. Drive sizing on its output side. Rated output current at the machine's voltage with the overload class the load needs, and torque across the speed range sufficient for breakaway — the line-start 70% and 205% figures do not transfer to a controlled ramp.
  4. Input side sized from the drive. Incoming conductors and protection follow the drive's rated input current and its maximum permitted protection values, not the motor's 93 A nameplate — a voltage-source drive's input current can run above its output current, as why VFD input current can be higher than output current explains. The motor's nameplate current sizes the overload element only.
  5. Harmonics on the supply. Get the supplier's harmonic data for your actual source configuration — source impedance, transformers, capacitor banks and the sensitive electronics sharing the bus — and check it against those loads; assessing VFD harmonics when one small drive runs a plant walks the assessment when one drive dominates a supply.
  6. Cooling and bearings at reduced speed. A self-ventilated motor driving a constant-torque load overheats at low speed because its shaft-mounted fan slows with it — get the manufacturer's derating for reduced-speed running or specify separately powered ventilation, and ask about bearing insulation or shaft grounding, because inverter common-mode voltage drives bearing currents a line-start motor never saw.

Commissioning checks #

Before any terminal work at the drive or the motor terminal box, de-energize, lock out and verify absence of voltage: NFPA 70E, 2024 edition, covers the safe work practices for that verification, and your site's switching procedure and the authority having jurisdiction govern how it is done on your installation.

For the first starts, ramp the machine unloaded where the process allows, and record supply voltage, drive input and output current, and acceleration time. Use a clamp that reads correctly on a pulsed waveform — measuring VFD and soft starter current with the right meter explains why an average-responding meter misreads a drive output. Have the supplier's commissioned verification done, including the motor-terminal measurement against their documented limits, and log winding temperature through the first full duty cycle. On the direct-on-line machines, capture one start with a power-quality recorder: the measured start duration and the dip at the bus are what confirm the paper study.

The decision, case by case #

On the drive: conditional go. A correctly sized medium-voltage drive will start and run this motor, but the go-ahead is the motor manufacturer's written transient withstand against the drive's documented terminal waveform, with the Part 31 peak from the worked example as the floor. With the statement in hand and the terminal peak below it, connect and commission. Without it, fit the supplier's documented filter and re-verify the terminal peak, or stay on the DOL starter — and if neither is acceptable, the durable fix is a replacement motor ordered to the inverter-duty standard.

On DOL: arithmetic, then the curve. The feeder carries the running total continuously and must ride through the staggered-start and simultaneous-start cases for their duration; verify both start cases on the breaker's time-current curve at the installed voltage, check the dip they cause against what the rest of the plant tolerates, and confirm the under-voltage release or restart scheme. Those checks decide the breaker, not the running total alone.

Questions asked

Can a direct-on-line motor like this run on a VFD?

Electrically, yes: a drive rated for the motor's voltage and at least its output will start and run it. The risk is the winding. A nameplate that stops at Class F insulation, VPI and a Class B temperature rise proves nothing about pulsed-voltage withstand, and connected unverified the motor may run for weeks while partial-discharge erosion works on the turn insulation, then fail without warning. Get the written withstand, compare it with the drive's documented terminal peak, and fit the filter the supplier documents if it falls short.

What do two motors on DOL draw at the breaker, running and starting?

Running, both motors draw 2 × 93 A = 186 A at motor voltage; one starting while the other runs comes to 558 A + 93 A = 651 A; both starting together doubles the starting current to 2 × 558 A = 1,116 A. The starting figures assume rated voltage at the motor terminals — a long feeder or a weak source pulls them down and stretches the start. A breaker upstream of a transformer sees these currents scaled by its voltage ratio.

Why do the drive's incoming conductors follow the drive rating instead of the motor current?

A voltage-source drive's rectifier and DC bus decouple input from output: at reduced speed or light load the input current can exceed the output current, because the input draws what the bus needs at a distorted power factor. Size the incoming conductors and protection from the drive manual's rated input current and maximum permitted protection values at your supply voltage; the motor's 93 A nameplate sizes the overload element only.

Do VPI and a Class F temperature rise prove inverter duty?

No. Vacuum pressure impregnation fills the winding's voids with resin, which helps against vibration, moisture and the seed sites for partial discharge; Class F insulation operated at a Class B temperature rise is a thermal class with built-in margin. Neither states the voltage pulse and rise rate the turn insulation was designed to survive, and that is the property inverter duty describes — which is why the manufacturer's written withstand is the acceptance document.

Do both direct-on-line starters need under-voltage protection?

Decide it deliberately before the first dip. After a voltage sag, a plain held-in contactor may drop out and then pull both machines back in when voltage returns, re-accelerating them together and landing the simultaneous-start case on the source a second time. An under-voltage release, or a controlled restart scheme, holds the motors off or staggers the restart. Check what each starter actually fits, then set the plant's restart policy on purpose.

Keep reading

  • Selection guide

    Choosing a line reactor or motor reactor for a VFD

    Pick the side first. A line reactor goes between supply and drive input, sized on drive input amps at 3% impedance for transient buffering or 5% for harmonic reduction; a motor reactor goes between drive output and motor, sized on motor FLA, for reflected-wave protection on long shielded leads. The two are not interchangeable.

    Variable frequency drives

  • Troubleshooting

    Finding a 113 V drop between a VFD and the motor terminals

    The drop is real, it lives in the path between the drive lugs and the terminal box, and it works out to about 0.36 Ω per phase — enough to dissipate roughly 11 kW per phase if it is resistance. Verify the reading with a drive-rated meter, then find it with an infrared scan under load and a micro-ohmmeter on every joint; the motor is downstream of both measurement points and is not the cause.

    Variable frequency drives

  • Explainer

    How a VFD works: rectifier, DC bus and inverter stages

    A VFD rectifies the incoming AC to DC — about 648 V DC on a 480 V supply with a six-diode front end — then switches that bus with IGBTs to build variable-frequency output. Speed follows N = 120 × f / P and torque follows the volts-per-hertz ratio. The worked example turns the 1.35 × line rule into a 648 V DC check you can make at the drive.

    Variable frequency drives