Explainer
Single phase control power for a three phase machine
Short answer
Only when the machine's own electrical drawings show an approved control-only connection; a recollection that two line terminals run the control is not one. The 30 kVA input converts to 125 A single phase at 240 V but 72 A as three-phase line current, so it never sizes a single-phase feeder. Wait for proper supply, charge the control 24 hours, replace the batteries if the alarm persists, and reload parameters from the record per the builder's procedure.

On this page
- What sits between the line terminals and the control
- What a control-only connection looks like on the drawings
- The input kVA is a three-phase number
- Converting a 30 kVA input at 240 V and at the 200 V minimum
- Recovering the control once power is on
- If three phase never arrives: the converter route
- The decision for your case
- Questions asked
Don't wire it on a memory. Energizing two line terminals of a three-phase machine tool to wake its control is legitimate only when the machine's own electrical drawings show a control-only connection, and a recollection that R and T run the computer is not that. Behind those terminals sit a control transformer, a phase-failure relay, pump motors and a spindle rectifier wired to diagrams you have not read, and the machine's input rating converts to a current its breaker and cable were never sized for. The move that costs nothing is to wait for the service and spend the time on the real recovery: a 24-hour charge attempt, a battery set on order, the machine's parameter record and the builder's reinitialization procedure. If three phase will never reach this site, a rotary converter sized to the reported rule is the permanent answer.
What sits between the line terminals and the control #
R and T are two of the three line input terminals on a machine of this class, and everything behind them follows the builder's diagrams, not your recollection. In the usual arrangement the three lines feed the main breaker, the spindle drive's rectifier, the pump motors and a control transformer with a tapped primary, while a phase-failure relay watches all three lines and drops the control circuit when one disappears. Feed two terminals and one of three things happens: the relay keeps the control dead anyway, the control lights up while pumps and drives sit on an open phase, or a load sees a voltage its primary tap was never set for. Which one you get is written on the drawings and nowhere else.
Drive manufacturers do publish rules for running a drive input on single phase — wiring a VFD R S T input from a single phase supply walks through one — but that permission belongs to that drive's manual. A machine tool has no generic equivalent; its permission, if it exists, is a sheet in its own diagram set.
Before you open the cabinet even to trace terminals: de-energize the feed, lock it out, and test for absence of voltage at the points you will touch, remembering that the drive's DC bus capacitors hold charge after the incoming line reads zero. NFPA 70E, 2024 edition, covers this work and the protective equipment your site's electrical safety program assigns to it.
What a control-only connection looks like on the drawings #
If the builder supports control-only power, the diagram set shows it plainly: a sheet with either a separate control inlet or two named line terminals, the control transformer's primary taps for the supply voltage, the fuse or breaker protecting that one circuit, and the relay chain that keeps the drives and pumps unpowered. Nothing else may hang on that circuit. If your diagram set has no such sheet, the machine has no control-only connection, and that ends the question.
The size of that circuit is the tell. Machine-tool control transformers are small: a 1 kVA isolation transformer with a 380/220 V primary and multiple secondaries, or a 2 kVA open-core unit with a selectable 208 to 550 V primary and a 115/230 V secondary, are typical catalog parts for this duty. At nominal supply voltage those draw 4.2 A and 8.3 A. Your machine's own transformer rating is on its control-power sheet, but expect that class of load, and set the screen accordingly: if a proposed control-only feed would carry more than about 10 A, it is feeding more than the control, and you have the wrong terminals.
The input kVA is a three-phase number #
The figure everyone reaches for — the input power requirement in the corner of the diagram's first page — is a three-phase requirement. Current from apparent power depends on how many conductors share it: single phase, the current is the apparent power divided by the voltage; three phase, the apparent power divided by the square root of three times the line-to-line voltage. The same kilovolt-amperes give two answers, and the single-phase answer is always the square root of three, about 1.73, times the three-phase line current.
That gap is why the input rating never converts into a single-phase feeder design. The machine's breaker, its internal wiring and its documented cable size were chosen around three-phase line current, and the spindle drive, coolant and hydraulic motors behind the terminals cannot run on one phase no matter what the arithmetic says. On the line side, NFPA 70, the National Electrical Code, 2023 edition, covers the feeder and its overcurrent protection — Article 670 for the machine tool, which defers the machine's internal construction to NFPA 79, 2021 edition, and Article 430 where motor loads set the numbers — and its continuous-load rule sizes overcurrent devices at 125 percent of a continuous load, so a standard breaker carries 80 percent of its rating indefinitely. Confirm the edition and amendments with the authority having jurisdiction.
Converting a 30 kVA input at 240 V and at the 200 V minimum #
The case: a slant-bed CNC lathe whose documentation states the numbers below. Every input comes from the machine's own papers, and the arithmetic assumes the full input requirement flows through the supply — the worst case any two-line feed could see.
- Input power requirement: 30.0 kVA, first page of the electrical wiring diagram, upper left.
- Minimum voltage the builder accommodates: 200 V, same page.
- Machine circuit breaker: 150 A, on the breaker sheet of the same set.
- Nominal supply for the calculation: 240 V, the service voltage at the new building.
The rule in words: single-phase current equals apparent power divided by voltage; three-phase line current equals apparent power divided by the square root of three times the line-to-line voltage. Volts times amps equals volt-amperes, so 30.0 kVA enters the division as 30,000 VA.
Single phase: 30,000 VA ÷ 240 V = 125 A, and at the minimum, 30,000 VA ÷ 200 V = 150 A. Three phase: 30,000 VA ÷ (1.732 × 240 V) = 72.2 A, and at the minimum, 30,000 VA ÷ (1.732 × 200 V) = 86.6 A.
The result: putting the whole input rating through two lines raises the current from 72 A to 125 A at nominal voltage, and at the documented minimum the single-phase figure lands exactly on the machine breaker's rating. Under the continuous-load rule that breaker carries 120 A all day, so the nominal-voltage case already fails, and the minimum-voltage case leaves nothing for pump and spindle starts.
The decision: a two-line feed sized on the machine's full input rating is out at every voltage — the screen is 120 A continuous on that breaker, and both single-phase cases sit at or above it. Control-only power survives only as the small circuit the drawings show, a few amps behind its own protection; above roughly 10 A on a proposed control feed, stop and find what else is on those terminals.
Recovering the control once power is on #
Dead batteries and lost parameters do not make the machine a paperweight; they make the recovery a sequence, and it starts only after proper supply is on the machine.
Leave the control powered for 24 hours. A depleted memory-support battery set recharges through the control's own charging circuit, and nothing else needs to happen first. Then read the alarm: Error 23, “NMI Battery Alarm”, should be gone. If Error 23 is still on the display after the charge period, the cells are past recharging — replace the set with the builder's specified batteries and stop troubleshooting the charger.
Parameters come back from a record, not from the control. Before anyone reinitializes anything, obtain the machine's parameter list: your saved copy, or the builder's record for the machine's serial number. The builder publishes a service bulletin that walks through reinitializing the control and installing its parameters; get the current revision from the builder's service department or its distributor, and follow it in order. After the load, verify the installed values against the record and confirm the battery alarm is clear before the machine goes back to production.
If three phase never arrives: the converter route #
When the site will stay single-phase, the permanent answer for the whole machine is a rotary phase converter, not two wires into the control. One reported installation of this lathe model sized its converter at twice the machine's 30-minute rating: the machine is 15 HP (11 kW) continuous and 20 HP (15 kW) for 30 minutes, so the converter is 40 HP. Treat that as the concrete starting number rather than a builder's rule — it is an installation that runs — and treat undersizing as the known failure mode, because inadequate source capacity and undersized conductors shorten the life of the machine's electrical components.
The feeder follows the machine's manual, which calls for power cables of 30 mm² or more; in North American sizes the next conductor up is AWG 2 at 33.6 mm², since AWG 3 at 26.7 mm² misses the mark. The same reported install ran AWG 1 per leg with an AWG 4 ground in 2-inch conduit over a 125 ft run — a voltage-drop concession to the length, not a change to the machine's requirement. Verify in the converter's instructions which loads may sit on its generated leg, and hold the machine's documented minimum voltage at the machine terminals during the heaviest start, not at the converter.
A variable-frequency drive is no shortcut: its output is a single-motor waveform, which is why a VFD cannot power a whole machine as a phase converter. The wider checklist — which loads tolerate a generated phase, and what a conversion does to feeder and protection — is in what converting a three-phase mill to single phase requires.
The decision for your case #
Four situations, four answers:
- The drawings show a control-only connection: take it, on their terms — their terminals, their tap, their fuse, nothing else live. Expect a working display and a dead machine: no spindle, no axes, no coolant, because those are three-phase loads on an open phase.
- You have no drawings, only the memory of R and T: energize nothing. Order the drawing set by machine serial number from the builder, and wait for the utility.
- The batteries are dead and the parameters are gone: that costs one 24-hour charge, possibly a battery set, and a parameter reload from the record — a bounded job after proper power, never a reason to improvise a supply now.
- Three phase will never come to this site: buy the wait out with a rotary converter sized at twice the machine's 30-minute rating, on a feeder that meets the manual's cable minimum and your voltage drop, and treat that as the machine's supply from then on.
The one option that is never right is the improvisation in the middle: two line terminals on a recollection, into a machine whose breaker, cable and control transformer were all designed against a different arithmetic.
Questions asked
Can I power the control section from a portable generator while waiting?
Yes, on the same condition as any other supply: the drawings must show the control-only connection, and the generator feeds exactly that circuit. Hold its voltage inside the documented range (the diagram's first page states the minimum) and its frequency at the machine's nameplate value, and keep the rest of the machine locked out so nobody can bump a pump start onto an open phase.
Where does the parameter list come from if none was saved?
The control's own manual carries defaults for the control's functions only. The servo, spindle and machine-specific values exist in the builder's record for that machine, matched to its serial number, or in your own saved copy, and the reinitialization procedure expects that list in hand before it begins.
Does powering only the control harm the spindle and pump motors?
Unpowered motors are not harmed by sitting; the hazard is accidental energization. Anything wired to the control circuit, such as a lube pump, a fan or a coolant contactor held by the control, can try to start on the missing phase. That is what the drawings' control-power sheet is for: it shows which loads the control feed wakes up, and the safe connection keeps every motor out of that group.
How do I confirm the drawing set matches my machine?
Match the drawing set number in the diagram's title block to the machine's serial number through the builder. Input pages differ by market: the input requirement and its breaker belong to one export-market model, so a diagram from a similar machine or from a domestic-voltage variant can state different input numbers than yours.