Current IntelPower LibraryShop main store

How-to

Wiring a VFD R S T input from a 240 V single-phase supply

Variable frequency drives Published 6 min read By Current Intel engineering team

Short answer

The two hot conductors land on any two of the R, S and T line terminals (R and S is the common choice), the equipment grounding conductor lands only on the drive's dedicated earth terminal, and T stays empty. Measure hot-to-hot rather than to ground, and confirm the reading against the drive's rated input range before energizing.

On this page
  1. De-energize, lock out, and verify dead
  2. Measuring the split-phase supply before landing a wire
  3. Landing the conductors, step by step
  4. Ground goes only on the earth terminal
  5. Setting lists that conflict
  6. Checks before the first run
  7. The decision for each case
  8. Questions asked

The fix up front: land the two hot conductors on R and S of the drive's line input, the equipment grounding conductor only on the dedicated earth terminal, leave T empty, and energize only after a hot-to-hot reading of about 240 V at the drive terminals. Wiring a split-phase supply to a three-phase-input VFD is a three-terminal job with one trap. Ground on a line terminal is the mistake to avoid: the input is a rectifier, and the earth connection is separate from it by design. Measure the supply hot-to-hot, not hot-to-ground, before you energize, because a neutral landed where a hot belongs can read deceptively close to correct conductor-to-ground.

De-energize, lock out, and verify dead #

Before any terminal cover comes off: switch the branch circuit off, apply your own lock, and verify absence of voltage at the conductor ends with a meter you have just proven on a known live source. Check hot-to-hot and hot-to-ground. NFPA 70E, the Standard for Electrical Safety in the Workplace, 2024 edition, covers this absence-of-voltage verification as part of establishing an electrically safe work condition; editions and local rules differ, so confirm the practice with your authority having jurisdiction. One more wait: the drive's input capacitors hold charge after shutdown, so give the discharge time printed in the drive's manual before touching its terminals.

Measuring the split-phase supply before landing a wire #

This is the worked case for a typical North American shop branch circuit.

Inputs. A split-phase service: a center-tapped transformer secondary whose two outer ends each read 120 V to the center tap and are opposite in polarity, 180 degrees apart. This is the circuit behind a two-pole branch breaker, and the supply the wiring plan describes: two hot conductors plus an equipment grounding conductor, no neutral used at the drive.

Rule. Because the two legs are opposite in polarity, the voltage between the outer ends is the sum of the two line-to-neutral readings.

Arithmetic.

120 V + 120 V = 240 V line-to-line, and either leg alone reads half of it.

Result. Expect a reading of about 240 V between the two hot conductors, measured hot-to-hot at the point where the drive will land. Treat it as an estimate to be checked against the governing code and the drive documentation.

Decision. A hot-to-hot reading near 240 V matches a drive whose manual lists a 220-240 V class input, so you can proceed to land the conductors. A hot-to-hot reading near 120 V means one leg is open or the meter tips are across a hot and a neutral — stop, and re-identify the conductors before energizing anything.

Landing the conductors, step by step #

  1. With the circuit locked out and verified dead, identify the two hots and the equipment grounding conductor at the drive end. If a neutral is present in the cable, cap it and leave it unlanded; it has no place on this drive.
  2. Land the first hot on R and the second on S. The input is a rectifier, so the two conductors are not polarized and either order works; any pair of R, S and T would work, and R and S keeps your wiring consistent with how most drive manuals document single-phase use.
  3. Land the equipment grounding conductor on the dedicated earth terminal, marked with the protective earth symbol. On one widely photographed 2.2 kW, 220 V-class drive that terminal is numbered 9; treat that number as belonging to that unit and read the marking on your own drive's terminal cover before landing anything.
  4. Leave T unconnected and empty.
  5. Bond the motor frame to protective earth through its own grounding conductor, then confirm continuity from the drive's earth terminal to the motor frame.
  6. Torque every terminal to the manual's value, confirm nothing is on T, and refit the covers before re-energizing.

Ground goes only on the earth terminal #

R, S and T are rectifier line terminals. The earth terminal bonds the drive chassis to the grounding system, and the two jobs must never share a landing point. If a grounding conductor is already on T or any line terminal, move it to the earth terminal before the drive is ever energized — a grounding conductor on a line terminal puts rectifier switching potential on every bonded surface downstream.

Run the circuit's own equipment grounding conductor with the branch conductors and land it on the drive's earth terminal, shared with nothing else; a dedicated equipment grounding conductor is exactly what keeps fault current on a defined path, which is why high-resistance grounding systems rely on a dedicated equipment grounding conductor. NFPA 70, the National Electrical Code, 2023 edition, covers how a split-phase branch circuit and its equipment grounding conductor are installed; local amendments differ, so confirm the details with your authority having jurisdiction and the drive's installation manual.

Setting lists that conflict #

Wiring gets the drive safe to energize; the motor data decides whether it protects the spindle. Setting lists copied between small 220 V-class drives disagree on exactly that data: motor rated voltage PD141 shown as 220, motor rated current PD142 as 9 A in one list and 11.0 A in another for the same 2.2 kW spindle, and maximum speed PD144 as 3000 in one list and 1440 in another. The same lists show PD000 as the parameter lock and unlock, PD001 as the local or remote command source, and PD013 set to 08 for a factory reset — a reset that wipes every entered setting, so it is not part of a routine commissioning.

The decision here is firm: enter motor voltage, rated current, poles and maximum speed from the spindle nameplate, confirmed against the manual for your exact drive model and firmware revision. A wrong current setting compromises the drive's protection, so never take it from a shared list.

Checks before the first run #

  • The measured line-to-line supply falls inside the rated input voltage range printed in the drive's manual.
  • You have found the manual's single-phase input note and applied any derating it publishes; the spindle's rated current still fits the derated output current.
  • Nothing is landed on T, and the equipment grounding conductor is on the earth terminal only.
  • Continuity from the drive's earth terminal to the motor frame reads solid, and the motor terminal box holds no power-factor capacitor — on a drive-fed motor, a capacitor in the motor terminal box must come off before a VFD is connected.
  • The nameplate values are entered for motor voltage, rated current, poles and maximum speed.

Give the first speed command low and watch the drive's current display. Stop immediately if the current, sound or rotation direction is wrong, and recheck phase identification and the parameter entries before trying again.

The decision for each case #

  • Two hots plus a ground, as described here: hots to R and S, ground to the earth terminal, T empty. Correct — proceed to the parameter and first-run checks.
  • Ground conductor on T: move it to the dedicated earth terminal before energizing. This is the one wiring error on this job that damages hardware and puts potential on bonded metal.
  • Reading near 120 V hot-to-hot: one leg is open or the meter is across a hot and a neutral. Fix the supply or re-identify the conductors first; do not energize the drive.
  • Only one hot and a neutral available: that half-voltage supply cannot feed a 220-240 V class input. Pull a proper two-leg circuit or select a drive rated for the supply you actually have.
  • Parameter lists pulled from the internet: use them as a checklist of which settings exist, never as values. The nameplate and your drive's own manual are the only sources for motor data.

Questions asked

What happens if I feed the drive one hot leg and a neutral instead of two hots?

The drive sees half the line-to-line voltage it is built for. After the input rectifier, the DC bus sits near 1.35 times 120 V, about 160 V, roughly half of what a 220-240 V class input is designed around. Most drives fault on low bus voltage, and none should be coaxed into running that way. Use a proper two-leg circuit or a drive whose manual lists the input you actually have.

Does single-phase input require derating the drive?

Usually yes. With one input phase carrying nothing, the remaining rectifier legs and the DC-link components do more work, so many manufacturers publish a single-phase input derating in the manual's input rating section. Find that note for your exact model, apply it, and confirm the spindle's rated current still fits the derated output current. If the manual lists no derating for your model, the published ratings govern.

Why do shared setting lists disagree on PD142 and PD144?

The lists circulating online mix up motor data between drives. For the same 2.2 kW spindle, PD142 (motor rated current) appears as 9 A in one list and 11.0 A in another, and PD144 (maximum speed) appears as 3000 in one and 1440 in another. Set PD142 from the spindle nameplate's rated current and PD144 from its maximum speed, then confirm both in the manual for your exact drive model.

Keep reading

  • Selection guide

    Sizing a VFD for a three-phase motor on single-phase input

    On single-phase input, size the drive's continuous output current at no less than twice the motor nameplate full-load amps when the drive's 50% derating applies, and feed it from a branch circuit sized to 125% of the drive's published single-phase input current — never from the ideal wattage estimate. For a 10 hp, 208 V motor that means a drive rated at least 61.6 A output.

    Variable frequency drives

  • Troubleshooting

    Why a VFD cannot power a whole machine as a phase converter

    A VFD is a motor controller, not a three-phase utility source: its output feeds only the motor wired directly to its terminals. No contactor, drum switch or machine feeder belongs on that output, and reversal happens through the drive's ramp, not a lead swap. Size the drive to the motor nameplate and add braking resistance when fast stops return more energy than the drive absorbs.

    Variable frequency drives

  • How-to

    Wiring nine-lead dual voltage motor leads to a VFD

    On a 230 V drive, pairs T1-T7, T2-T8 and T3-T9 land on the three output terminals and T4-T5-T6 are joined and insulated; on a 460 V drive, T1, T2 and T3 land on the outputs with 4-7, 5-8 and 6-9 joined. No winding lead is ever grounded — the motor frame and drive chassis carry the equipment-grounding conductor.

    Variable frequency drives