Motors and motor starters Published 7 min read By Current Intel engineering team

Short answer

On a NEMA 12 lead motor the windings read only across 1-4, 2-5, 3-6, 7-10, 8-11 and 9-12. Continuity from 1 to 10 is not a winding pair: the 4-7 series link joins windings 1-4 and 7-10, so the beeper sees two windings in series. Verify the lead numbers and links, test the six pairs, and megger to ground before calling the motor good.

On this page
  1. What the meter sees between leads 1 and 10
  2. The six winding pairs to test
  3. The 1 to 10 reading on a 460 V motor with links 4-7, 5-8 and 6-9 in place
  4. What each outcome tells you
  5. Testing the pairs with the leads separated
  6. Megger the winding before it goes back
  7. Reconnect to the nameplate and prove it
  8. Questions asked

A continuity beep between leads 1 and 10 on a 12 lead motor is not a pass, and it is not a fail. On a NEMA dual-voltage machine the windings read only across 1-4, 2-5, 3-6, 7-10, 8-11 and 9-12; leads 1 to 10 go beep because the 4-7 series link joins winding 1-4 to winding 7-10. Confirm the lead numbers and the installed links first, then test the six pairs and megger the winding before you judge the motor.

What the meter sees between leads 1 and 10 #

Each phase of a 12 lead dual-voltage motor is built as two windings. Phase A is the winding across 1 and 4 plus the winding across 7 and 10, and the same pattern holds on phases B and C. The series links join each pair of halves end to end, so with links installed the meter does not see six separate windings. It sees three phase groups: 1, 4, 7 and 10 all read to each other, 2, 5, 8 and 11 read to each other, and 3, 6, 9 and 12 read to each other, with nothing between the groups and nothing to ground.

A beep from 1 to 10 is therefore one path through two windings and a link, which is a normal signature of that connection rather than a winding-pair measurement. The beeper only proves a conductive path below the meter's beep threshold. It measures nothing about insulation strength and nothing about winding condition, so it cannot clear or condemn the motor on its own.

The six winding pairs to test #

Pull the nameplate diagram before trusting any pairing. In NEMA numbering the six windings sit across 1-4, 2-5, 3-6, 7-10, 8-11 and 9-12: leads 1, 2 and 3 are one end of each phase and leads 7, 8 and 9 begin the second half. IEC-numbered machines pair U1-U2, V1-V2, W1-W2, U5-U6, V5-V6 and W5-W6 instead.

Wye-delta and part-winding motors also come with 12 leads, and their internal groupings differ from a dual-voltage wye machine, so the diagram on this motor is the one that counts. When pair readings come back inconsistent, suspect lead identity before the winding: the same pair-and-resistance logic used for identifying mislabeled leads on a nine-lead motor that fights itself applies here. If any leads carry no number at all, motor-repair trade associations publish step-by-step procedures for assigning numbers to unmarked 12-lead windings.

The inputs come from the reported case: a 460 V three-phase motor with twelve NEMA-numbered leads; three links found in the terminal box, 4 to 7, 5 to 8 and 6 to 9, which is the nameplate's series wye pattern (the 4 to 6 first reported was a transposition of 4 to 7); a digital multimeter on its continuity setting; and the motor leads disconnected from the starter. The observation was a beep between 1 and 10 and nothing elsewhere.

The rule: series resistances add. The 4-7 link places the 1-4 winding in series with the 7-10 winding, and a short copper link contributes only a few milliohms, which disappears next to winding resistance. The arithmetic, with R the resistance in ohms that one winding reads across a single pair with the links removed:

R(1 to 10) = R(1-4) + R(link 4-7) + R(7-10) = R + about 0 Ω + R = about 2R

The pair count confirms the coverage: 12 leads ÷ 2 ends per winding = 6 windings, and 3 links × 2 windings per path = 6, so the three two-winding paths 1-10, 2-11 and 3-12 together account for every winding in the machine.

The result: the beep between 1 and 10 is the expected signature of the 4-7 link with both phase-A windings intact, and that path should measure close to twice R. The same should hold on 2-11 and 3-12 if those links are genuinely installed.

The decision: read R across one pair with the links off, then re-check 1 to 10 with the link back in. A reading close to twice R confirms the link and both windings. A reading close to R means the path stops at the link, which points to an open second-half winding or a mislabeled lead. A beep on 1 to 10 with dead paths on 2-11 and 3-12 means the other two links are missing or those leads do not carry the numbers printed on them: stop interpreting continuity, identify the leads, refit the links to the diagram, and only then judge the winding.

What each outcome tells you #

Separate all twelve leads from the starter and match the meter against these cases:

  • Beeps 1 to 10 only. The meter has seen only the phase-A path; the other two links are absent, loose or those leads are mislabeled. Fix identity first.
  • Beeps on 1-10, 2-11 and 3-12, each close to twice a single pair. Consistent with three series links and intact windings. The next test is insulation, not more continuity.
  • Every lead beeps to every other lead. The 10, 11, 12 wye tie is still in place along with the series links, which is the connected-for-running state; it hides the individual windings. Remove the tie and the links before testing.
  • Open across 1-4 with the links removed. An open winding, a broken lead or the wrong pair: verify the number on that lead before condemning the winding.
  • Continuity between two different phase groups, say 1 to 2, with every link and tie removed. Either something bridges inside the machine or it is not the dual-voltage wye design assumed; go back to the nameplate.
  • Six pairs read but the motor fails the insulation test. Continuity work cannot see ground leakage; that finding belongs to the insulation tester in the next section.

Testing the pairs with the leads separated #

De-energize, lock out and verify the absence of voltage at the motor terminals before the terminal box comes open. NFPA 70E, the Standard for Electrical Safety in the Workplace, 2024 edition, covers establishing an electrically safe work condition; confirm the details with the authority having jurisdiction and the equipment documentation. Then:

  1. Photograph the links and line connections exactly as found.
  2. Disconnect the motor leads from the starter, disconnect or drive, and separate all twelve so no two touch.
  3. Match every lead number against the nameplate diagram, sorting NEMA from IEC numbering before any measurement.
  4. With the links off, measure the six pairs and write down each resistance, keeping the same meter, test leads and probe pressure for all six.
  5. Refit the three series links and confirm that 1-10, 2-11 and 3-12 each read close to twice a single pair; remove them again to keep diagnosing.
  6. Treat a pair that reads open, or well above its siblings, as a lead-identity problem first and a winding problem second.

Megger the winding before it goes back #

An ohmmeter works at only a few volts, far below what an insulation test applies, so it cannot judge the winding's insulation. With the leads still separated, use an insulation resistance tester: each winding to ground, and winding to winding, at the test voltage and acceptance values the motor's documentation specifies. Where you connect matters as much as the number, because testing from the switchgear reads the cable along with the winding; insulation resistance testing from switchgear vs motor terminals explains what each connection point includes. In the reported case behind this article the winding meggered clean, was reconnected and ran. That outcome belongs to that motor. The sequence is the part that transfers: identify, pair-test, megger, reconnect.

Reconnect to the nameplate and prove it #

Reconnect from the diagram, not from memory. For the series wye connection of a dual-voltage machine at its higher voltage, the pattern is lines on 1, 2 and 3, links 4-7, 5-8 and 6-9, and 10, 11 and 12 tied together as the wye point; confirm that against this motor's nameplate, because delta-wound and part-winding 12 lead machines connect differently. The voltage side of that choice, including the delta-to-wye reconnection math, is covered in reconnecting a 12 lead 575 V delta motor to 480 V wye; this article stays on the ohmmeter side of the job. With the box closed, prove the connection under controlled conditions: rotation, current balance and temperature. If any of them look wrong, de-energize and recheck the wiring instead of leaning on a continuity result.

Questions asked

Which pairs should read on a NEMA 12 lead motor?

Six windings, six pairs: 1-4, 2-5, 3-6, 7-10, 8-11 and 9-12. With the series links in place the meter also reads 1-10, 2-11 and 3-12, each close to twice one pair. Take the pairing from the motor's own diagram; delta and part-winding 12 lead machines differ.

Does a beep between leads 1 and 10 prove the motor is good?

No. That path runs through winding 1-4, the 4-7 link and winding 7-10, so the meter saw two windings joined by a link rather than one tested winding. It says nothing about insulation to ground either, which takes an insulation resistance tester. Remove the links, read the six pairs, compare them for balance, then megger before reconnecting.

Why did only 1 to 10 beep if the other links were in place?

With all three series links installed, the meter should also beep 2 to 11 and 3 to 12. One path alone means the 5-8 and 6-9 links are missing or loose, or those leads do not carry the numbers printed on them. Identify the leads, refit the links to the nameplate diagram, then test the six pairs before drawing any conclusion about the winding.

Is the 4-7, 5-8, 6-9 link pattern right for every 12 lead motor?

No. That set is the series wye connection of a NEMA dual-voltage machine at its higher voltage, with lines on 1, 2 and 3 and 10, 11 and 12 tied as the wye point. Delta-wound and part-winding machines use other patterns. Read this motor's nameplate diagram; a chart remembered from a different motor is not evidence for this one.

What resistance should each winding pair read?

No table value fits every motor, because winding resistance depends on frame size, voltage and design. The reliable check is balance and ratio: the six pair readings should match closely with the same meter and leads, and a two-winding path such as 1 to 10 should sit close to twice one pair. One pair far from the others points at that winding.

Keep reading

  • How-to

    Reconnecting a 12-lead 575 V delta motor to 480 V wye

    Reconnection follows the standard 12-lead map whether the winding is concentric or lap: jumpers 4-7, 5-8 and 6-9 come off, leads 4, 5, 6, 10, 11 and 12 tie into one star point, and pairs 1-7, 2-8 and 3-9 land on the lines. Series delta at 575 V puts 287.5 V on each group; parallel wye at 480 V puts 277 V, about 3.6 percent low. Make the move only when the nameplate lists the wye connection at the new voltage.

    Motors and motor starters

  • How-to

    What a multimeter shows about three-phase motor winding resistance

    With the motor locked out and the star or delta links removed, measure U1-U2, V1-V2 and W1-W2. Three near-equal readings, continuity on every winding and no continuity between windings or to the frame pass the test. There is no fixed pass value in ohms: the correct resistance scales with the motor's size, so the comparison between the three readings decides.

    Motors and motor starters

  • Explainer

    What six leads and two plate voltages tell you about wiring

    Six leads are the two ends of three stator windings. Measure the supply, match it to a plate voltage line, and connect exactly as the plate diagram shows: wye ties the three winding ends together and lands supply on the starts, delta ties each end to the next start. A six-lead wye/delta pair sits 1.732 apart; a 230/460 pair means the plate diagram, not a rule, decides.