Current IntelPower LibraryShop main store

Explainer

What decides acceptable voltage drop for MV motor starts

Motors and motor starters Published 10 min read

Short answer

Judge a medium-voltage motor start by dip magnitude and duration together, not by one percentage. A bus reading above the NEMA contactor hold-in floor clears only the starter screen; the start is accepted when the motor out-torques its load through acceleration at the reduced terminal voltage, the dip ends within the motor's thermal limits, and the other bus loads ride through it. Direct-on-line survives when all checks pass; a failing bus points to a soft starter; lost torque margin or a no-dip bus points to a VFD.

On this page
  1. What voltage drop is acceptable for a medium voltage motor start?
  2. Why is the measured bus dip not a pass or fail number?
  3. How much torque does the motor lose during the dip?
  4. What does the NEMA contactor hold-in floor decide?
  5. How long can the dip last before it becomes a problem?
  6. How do the other loads on the bus change the answer?
  7. When does the start need a soft starter or a VFD?
  8. How do I verify the start before and after choosing a starter?
  9. Questions asked

An acceptable voltage drop for a medium-voltage motor start is a magnitude and a duration that together clear four checks, not a single percentage. The only documented floor is the NEMA contactor hold-in level, so a bus that holds the measured dip clears the starter screen by three percentage points and nothing more. The start itself is accepted only when the motor still out-torques its driven load at the reduced terminal voltage, when the dip ends inside the motor's thermal limits, and when every other load on the bus rides through it. This article works a 4.16 kV example end to end, from bus to terminals to torque to duration, and ends with the decision rule for keeping direct-on-line, fitting a soft starter or specifying a VFD.

What voltage drop is acceptable for a medium voltage motor start? #

Magnitude and duration decide it together, and the only documented floor is 85% of rated voltage, the lowest level at which NEMA ICS 2-2000 rates its industrial control devices to operate satisfactorily; every other acceptance check is specific to the motor, the load and the bus.

The four checks, in the order they usually settle: whether the motor accelerates the driven load at the reduced terminal voltage without stalling; whether acceleration ends inside the motor's locked-rotor and stall-time ratings; whether the contactors, control power supplies and instruments on the bus stay in service through the dip; and whether the utility accepts the disturbance at the point of common coupling. A design-stage starting study produces the magnitudes before the equipment exists, the way the motor starting voltage dip calculation on an 11 kV bus page sets out, and a captured start waveform verifies magnitude and duration once the machine is installed.

Quantity What it decides Where the number comes from
Minimum bus voltage Whether contactors, coils and controls on the bus stay in Starting study, or a captured start waveform at the MCC
Motor-terminal voltage Torque available for acceleration Bus result minus the feeder drop at starting current
Dip duration Rotor heating and how long bus loads are stressed Time from dip onset to recovery in the waveform
Acceleration time and torque margin Whether the load reaches speed before protection objects Motor torque curve, load torque curve and inertia
Start frequency How much heat stacks between starts Operating records and the motor's data sheet limits
Utility dip or flicker limits Whether the source may be disturbed at all The serving utility's interconnection requirements

Why is the measured bus dip not a pass or fail number? #

An 88% reading at the MCC bus is a magnitude at one point in the circuit, not a verdict: it says nothing about how long the dip lasts, about the lower voltage at the motor terminals, or about whether the load still accelerates.

The design phase is the trap: before the rotor, the driven equipment and the cables exist, a study can size the dip but not time it, because duration depends on inertia and torque margins that are still estimates. Treat the reading as a screen and nothing more. The bus result clears the contactor floor by three percentage points, thin enough that a longer feeder, a stiffer load or a softer source erases it, and the two checks that actually decide acceptance, terminal voltage and duration, are still open.

How much torque does the motor lose during the dip? #

Induction motor torque falls with roughly the square of terminal voltage: at 84.5% of nominal, the motor in the worked example holds only 71% of its rated-voltage torque curve, and that is where the acceleration verdict is won or lost.

Worked example, with every input declared: a 4.16 kV MCC bus; a starting study for a cold start that predicts a dip to 88% of nominal; an assumed 3.5% of nominal dropped across the feeder cable at locked-rotor current; a motor with 120% of full-load torque available at breakaway when rated voltage is applied; a fan load needing 40% of full-load torque to break away.

  • Bus during the start: 0.88 × 4160 V = 3660.8 V.
  • Contactor screen: 0.85 × 4160 V = 3536 V, so the dip clears the floor by about 125 V and every NEMA-rated starter on the bus holds.
  • Motor terminals: 4160 V × (0.88 − 0.035) = 3515.2 V, or 84.5% of nominal, below the contactor floor but unaffected by it, because that floor governs coils at the bus, not the motor.
  • Torque: 0.845² = 0.714, so the whole torque curve runs at 71% of its rated-voltage height; breakaway torque falls to 1.20 × 0.714 ≈ 86% of full-load torque, against the fan's 40% demand, a margin of about 46 points of full-load torque at zero speed.

The margin at breakaway is not the whole verdict: the worst point is usually the pull-up region, where the motor's curve is flattest, and a thinner margin there stretches acceleration and pushes rotor temperature up. The acceleration time that follows is calculated the way the motor starting time calculation with torque margin and inertia page works it, accelerating torque integrated against the load's inertia.

What does the NEMA contactor hold-in floor decide? #

The 85% figure is a contactor hold-in guarantee, not a bus acceptance limit: NEMA ICS 2-2000 rates its industrial control devices to operate satisfactorily at 85% to 110% of rated voltage, so the floor screens only the starters and coils riding on the dipped bus.

NEMA ICS 2-2000 covers industrial controllers, contactors and overload relays rated 600 V, and its operating band is a performance guarantee for the device, not a limit any code puts on a bus. Two consequences follow. The guarantee applies where the coil is fed: a contactor mounted on the dipped MCC bus judges that bus's voltage, even though the motor a feeder length away sees less. Below the band the guarantee lapses, and a dip under the floor can release every starter on the bus at once, multiplying the disturbance as running processes trip. Read the specific contactor's band from its data sheet, because the standard is the envelope and device families sit inside it differently, and note that medium-voltage switchgear sits outside the 600 V scope entirely, so its coil ranges come from the switchgear specification.

How long can the dip last before it becomes a problem? #

The dip lasts exactly as long as the acceleration, so the duration you must tolerate equals the motor's starting time at the reduced voltage, and the motor's data sheet locked-rotor and stall times set the thermal ceiling for it.

The ceiling comes from the motor, not the bus: locked-rotor and stall-time ratings bound how long the machine may carry starting current, and the data sheet's start limits bound how often heat may stack between starts. Acceleration at reduced voltage stretches the dip, because the load needs the same speed change but the accelerating torque is smaller, so a start that clears thermally at full voltage can overrun a limit at the reduced one. High inertia grows the duration fastest, which is why the torque-margin calculation and the duration check are the same calculation done once. Judge frequency too: a start made once in several years gets more tolerance than one repeated every shift, and a machine still hot from the last start has less room than the cold figures assume. Motor protection that models residual heat enforces all of this; use its event records when the schedule is tight.

How do the other loads on the bus change the answer? #

Inventory what rides on the bus: NEMA-rated contactors hold in down to their documented floor, but a running induction motor draws more current as its voltage dips, control power supplies ride through for their own times, and the utility may cap how often and how deeply the source is disturbed.

A running induction motor needs the same torque after the dip as before it, and with reduced flux it takes more current, so every motor on the bus heats harder through the dip while its overload relay watches. Sensitive loads answer on their own schedules: drive front ends trip on undervoltage, control power supplies hold up for milliseconds or not at all, and each tolerance lives in that device's documentation rather than in any bus-wide rule. If another large motor can start while this one accelerates, the two dips add, and the second motor starting voltage drop calculation page works that combined case. The disturbance at the point of common coupling is the utility's business as well; interconnection requirements commonly cap dip size or frequency, so confirm those limits with the serving utility and the authority having jurisdiction before committing to direct-on-line.

When does the start need a soft starter or a VFD? #

Choose by which check failed: direct-on-line stays when torque margin and bus ride-through both pass; a soft starter fits when only the bus fails and the load breaks away easily; a VFD fits a high-inertia or constant-torque load, or a bus that cannot tolerate the dip at all.

Direct-on-line stays when all four checks pass. The worked example's fan, with about 46 points of full-load-torque margin at breakaway and a bus that holds, keeps its starter if the captured duration lands inside the thermal limits and the utility accepts the disturbance; the measured dip alone never forces a starter change.

A soft starter is the fit when the motor and its load pass but the bus fails. It cuts the starting current and shrinks the local dip, and it cuts torque by the same square law, so rerun the acceleration check at the starter's reduced starting voltage before committing. Centrifugal pumps and fans take that trade well, because they break away lightly and their torque demand climbs with speed. Temper the promise where the complaint is upstream: the why a soft starter barely improves the utility bus dip page shows why a soft starter barely moves the dip a stiff utility supply sees.

A VFD is the fit when torque margin fails or the bus cannot tolerate the dip at all. It ramps frequency with voltage, holds line current near its programmed limit, and accelerates high-inertia or constant-torque loads without a locked-rotor event. Rerun the thermal check for the ramp time the drive will actually use, and treat the drive's input side, harmonics, filters and precharge, as new bus loads to be checked.

How do I verify the start before and after choosing a starter? #

Capture a full start, meaning minimum voltage, time to recovery, current and acceleration time, at both the MCC bus and the motor terminals, and repeat it after the new starter is installed, because a single instantaneous reading cannot clear or condemn a design.

  • De-energize the MCC section and verify absence of voltage before connecting temporary recorders; if the capture must be made on a live bus, plan it as energized work under NFPA 70E, 2024 edition, with the arc-flash risk assessment and the PPE the label calls for.
  • Record the full event with a three-phase power-quality recorder or the MCC's own power monitor: minimum voltage, time from onset to recovery, motor current, and acceleration time to speed.
  • Derive the terminal voltage from the bus record and the feeder impedance, or measure it at the motor, and keep the two numbers separate through every check.
  • A permanent metering point at the MCC captures every start without temporary gear; where that station's display and computer belong in one cabinet-mounted unit, an industrial panel PC is the hardware to specify.
  • After the starter decision, repeat a representative start under the real load and confirm no stall, thermal headroom as the protection models it, bus loads still in service, and a dip inside whatever the utility requires.

Four habits produce wrong verdicts: comparing a bus measurement against a terminal-voltage limit, recording magnitude without duration, promoting the contactor floor to a system-wide acceptance number, and judging a soft starter by its current reduction while ignoring the torque it took away. A dip that is short and deep and one that is shallow and long stress different equipment, so read the captured waveform for both before signing off the design.

Questions asked

How do I judge an 88% bus reading during a medium-voltage motor start?

Treat it as a screening pass only. The measured dip sits above the contactor hold-in floor, so NEMA-rated starters stay in, but acceptance still needs the dip duration, the motor-terminal voltage, the acceleration and thermal check against the driven load, and the tolerance of every other load on the bus. A design-stage study gives magnitude and duration; a captured start waveform verifies both.

Does a soft starter shrink the dip the utility sees?

Only slightly on a stiff supply. The starter cuts the current drawn from the local MCC bus, but the upstream source impedance is small, so the dip at the point of common coupling shrinks far less than the current does. Soft start answers a local ride-through problem, not a utility flicker limit.

What voltage do the motor terminals see when the bus holds at the measured dip?

Less than the bus. Whatever the starting current drops across the cable from the MCC to the motor comes off the bus figure; in the worked example, a 3.5% feeder drop turns an 88% bus into 84.5% at the terminals. Read or calculate the terminal value before judging acceleration, because torque follows the terminal voltage, not the bus voltage.

How many starts in a row can a medium-voltage motor take?

The motor's data sheet decides, and it separates a cold machine from a hot one. Locked-rotor and stall-time ratings bound how long a single start may last; start-frequency limits bound how much heat may stack between starts. Motor protection that models residual heat enforces the same idea, so use its event records when the start schedule is tight.

How much current does a VFD draw from the bus while starting the motor?

Whatever its programmed current limit commands, commonly little more than the motor's rated current and far below locked-rotor inrush. A drive raises frequency and voltage together, so the motor stays near synchronous speed and never presents a locked-rotor load to the bus; the visible disturbance is mostly the drive's own DC bus precharge. Size the feeder for the drive's rated input current.

Does a code require keeping bus voltage above 85% during a motor start?

No. The 85% level is the bottom of the NEMA ICS 2-2000 operating band for rated industrial control devices, a device performance guarantee rather than a code limit on voltage drop. Codes set conductor sizing and equipment requirements and give no motor-start dip percentage. Binding numbers come from the utility's interconnection requirements and the ride-through tolerances of the loads on the bus; confirm both with the authority having jurisdiction.

Keep reading

  • How-to

    Second motor starting voltage drop calculation

    The second motor's dip is √3·I·(R cosφ + X sinφ) through the shared source-and-feeder impedance, with I the phasor sum of the running motor's load current and the starting motor's locked-rotor current. The running motor supplies none of the start; it adds to the drop. Iterate once on the reduced terminal voltage, then judge by torque, which falls with the square of voltage.

    Motors and motor starters

  • How-to

    Motor starting voltage dip calculation on an 11 kV bus

    A starting medium-voltage motor dips the bus in proportion to its locked-rotor kVA against the source's short-circuit strength. Screen it as dip ≈ 100 × S_start/S_sc at the point of common coupling, then refine with ΔV = I_start(R cosφ + X sinφ) per phase. In the worked 11 kV, 1.5 MVA chiller example a direct-on-line start gives 3.6% at the PCC and 4.0% at the plant bus, failing a 3% limit; a 65% tap autotransformer or a soft starter limited to 3× rated current holds both points under 2%.

    Motors and motor starters

  • Troubleshooting

    Why a single phase motor stalls on start at 200 V

    The motor stalls because 200 V at its terminals leaves about 69% of rated starting torque — torque varies with the square of voltage — and the primed pump needs more than that. Recover the margin by starting against a throttled discharge, cutting the 20 V feeder drop with a step-up/step-down transformer pair, or converting to a three-phase motor and a drive sized for single-phase input.

    Motors and motor starters