Short answer
On a fixed-impedance screening calculation, cutting starting current from 600% to 400% scales a 10% utility-bus dip to about 6.7%, so a modeled 2-point gain signals a study-method or data problem, not a soft-starter fault. A 10% dip on a shared medium-voltage feed also exceeds the roughly 5% planning ceiling utilities apply at the point of common coupling. Keep the starter for the motor and the mechanical train; fix the study, then the supply, before ruling the starter out.
On this page
- Is a 10% voltage dip at the utility bus acceptable?
- Which buses should the dip be read from?
- Why does 600% to 400% current buy only two points of dip?
- Is the 35% drop at the motor terminals a real failed start?
- What data does the study need before judging the starter?
- Is the soft starter worth it on this supply?
- Questions asked
A 10% motor-start dip at a 12.47 kV bus other customers share sits above the roughly 5% planning ceiling utilities apply at the point of common coupling, so it is not a number to wave through. The model's arithmetic is the bigger problem: cutting starting current from 600% to 400% should scale a 10% dip to about 6.7% on a fixed-impedance screening calculation, not 8%, and the "35% voltage drop at the motor terminals means it will not start" conclusion is an artifact of running a static study — static runs cannot evaluate acceleration at all.
Keep the soft starter; it limits inrush to the motor and softens the mechanical start whatever the dip arithmetic says. Fix the study, verify what actually reaches the utility connection, and if a corrected study still misses the utility's limit, the remedy is the supply — or a drive — not a deeper current limit.
Is a 10% voltage dip at the utility bus acceptable? #
No — not on a 12.47 kV feed that other customers share: planning practice holds a motor-start dip at the point of common coupling to about 5%, and nearer 3% where starts repeat through the day, so 10% invites flicker complaints.
ANSI C84.1 (2020 edition) sets steady-state service voltage ranges for 60 Hz systems — Range A holds service voltage within ±5% of nominal — and it says nothing about momentary starting dips. Those limits come from the serving utility's interconnection or service rules, which screen at roughly the 5% level for occasional starts and apply tighter, often flicker-based, limits where starts repeat through the day. Confirm the ceiling that applies to your connection with the utility and the authority having jurisdiction before you treat any figure here as the limit.
If you are the only customer on that line, the deciding buses move inside your plant: the 12.47 kV dip appears deeper at the transformer secondary, where your running equipment has to ride through it. That propagation is worked through in why a 4.16 kV motor start dips a 120 V branch to 109 V. Sensitive electronics on that bus may need power conditioning or a UPS no matter which starter you choose.
Which buses should the dip be read from? #
Read it at four places: the 12.47 kV connection (what the utility and your neighbors see), the transformer secondary bus (what your running equipment sees), the soft-starter input, and the motor terminals, where the starter's own voltage reduction lives.
| Location | What it decides |
|---|---|
| 12.47 kV utility connection | The disturbance you export to the network and any neighbors on the feed |
| Transformer secondary bus | The voltage your running motors, contactors and electronics must ride through |
| Soft-starter input terminals | The supply remaining after all upstream drops |
| Motor terminals | The voltage the starter removes on purpose — not a supply disturbance |
Compute every dip the same way: dip = 100 × (V_prestart − V_start) / V_prestart. A figure quoted against nominal instead of pre-start reads smaller when the bus is already depressed before the start. Note which base the study used before comparing its 10% and 8%, and which bus each number sits on, because a transformer sits between the 12.47 kV report and the low-voltage motors.
Why does 600% to 400% current buy only two points of dip? #
It should not: on a fixed-impedance screening calculation the dip scales with starting current, so 10% × 400/600 ≈ 6.7% — a 3.3-point gain, not 2 — and the shortfall points at the study method or its data, not at the starter.
The physics is simple: the dip is the starting current through the source impedance, ΔV ≈ I_start × Z_source, referenced to pre-start voltage — the same proportionality behind a motor starting voltage dip calculation on an 11 kV bus. One-third less current should mean one-third less dip. When it does not, run these down:
- Current base mismatch. The 400% setting must be 400% of the same full-load current the study references, and locked-rotor current falls with terminal voltage, so the study must iterate rather than assume nameplate locked-rotor amperes.
- Power factor. A soft starter's phase control delays the current, so the reactive volt-amperes through the source reactance fall less than the amperes do — the dip is reactance-driven, and a worse displacement angle claws back part of the gain.
- Load models. Running loads modeled as constant kVA pull more current as the bus sags and re-deepen the dip; constant-impedance loads pull less. Either changes the scaling.
- Percentage basis. Points against pre-start versus percent of nominal are different numbers whenever the pre-start voltage is below nominal.
- Assumed source data. A 10% dip at 12.47 kV from one low-Voltage motor says the feed, the substation transformer, or both are small for the load. Get the utility's three-phase short-circuit MVA and X/R, and check the site transformer's kVA, impedance and tap against its nameplate.
The 10-second ramp never enters this comparison: a static study is one snapshot at locked rotor and knows nothing about time. To close the gap between model and reality, measure the start — the method is in measuring VFD and soft starter current with the right meter, because a plain averaging clamp meter reads a phase-controlled waveform low.
Is the 35% drop at the motor terminals a real failed start? #
Not on this evidence: a static motor-starting study takes one locked-rotor snapshot and cannot compute acceleration, so its failure flag is a screening outcome; at 350% current limit the motor still sees about 58% voltage and 34% of full-voltage torque.
At fixed frequency and slip, motor current scales roughly with terminal voltage and torque with its square, so the current limit sets the motor voltage directly: V_motor ≈ I_limit / I_LRC. The arithmetic for this machine, with the 600% locked-rotor current your study assumes:
- At a 400% limit: V_motor = 400/600 = 0.67 of nominal, so 67% voltage; torque ≈ 0.67² = 0.44, or 44% of full-voltage locked-rotor torque.
- At a 350% limit: V_motor = 350/600 = 0.583 of nominal, so 58% voltage; torque ≈ 0.583² = 0.34, or 34%.
- At a 300% limit: V_motor = 300/600 = 0.50; torque ≈ 0.50² = 0.25 — matching the soft-starter handbook relation that voltage at 50% gives current at about 50% and torque at about one quarter.
That 350%-current, 34%-torque point is the documented wye-delta equivalent: soft-starter application guides name exactly those settings to mimic a wye-delta start, and wye-delta starts industrial motors every day. "No load" removes process torque, not rotor and machine inertia, breakaway or friction; an unloaded machine accelerating on 25–34% of locked-rotor torque is normal territory, not a failed start. Treat the square-law as an estimate under phase control — the waveform is not a clean sine — and settle the question with a dynamic study using the machine's own curves.
What data does the study need before judging the starter? #
It needs dynamic motor-starting input: manufacturer torque-speed and current-speed curves, real inertia for motor and driven machine, the utility's source impedance, and the installed transformer data — the static run that produced these numbers cannot judge a starter.
ETAP and its peers offer both static and dynamic motor-acceleration studies; the dynamic one is what answers "does it accelerate". Feed it:
- Motor torque-speed and current-speed curves from the manufacturer, not a library default.
- Motor and driven-load inertia in the units the model asks for; "no load" does not remove inertia.
- The driven machine's actual torque-speed profile. If nobody has one, record that gap in the report instead of inventing a curve — a made-up load profile is exactly how a study concludes a motor will not start while the real one runs.
- Utility source impedance, or three-phase short-circuit MVA with X/R, obtained from the utility.
- Site transformer kVA, impedance and tap position from the nameplate.
- Feeder lengths and conductor data as installed.
- The soft starter modeled with its current limit and ramp at the actual settings.
- One identical pre-start case — same running loads, same initial voltages — behind both the across-the-line baseline and the soft-start runs.
When the study meets the plant, the verification starts de-energized: lock out, test for absence of voltage, and open nothing live — NFPA 70E (2024 edition) covers the work practices and the protective equipment for the rare case where energized measurement is genuinely required. Logging the start with a power-quality meter at the transformer secondary then gives you the real dip to hold against the model.
Is the soft starter worth it on this supply? #
Yes for the motor and the driven train, no as the whole answer to a 10% dip on a shared feed: a 400% limit lands near 6.7% and 350% near 5.8%, both at or above the 5% planning ceiling, so the residual fix is the supply itself.
Decide by case:
- Only customer on the line. The utility-bus number is between you and the utility. If a dynamic study shows acceleration at your limit and the low-voltage bus stays high enough that running contactors hold — IEC 60947-4-1, the contactor and motor-starter product standard, requires pick-up down to 85% of rated control voltage and drop-out by 75% — the 400% soft start is a sound installation.
- Shared feed, utility ceiling 5%. No current limit gets you there on this source: holding the dip to 5% means a 300% limit, 50% motor voltage and 25% torque — marginal even unloaded. The remedy is supply impedance (a larger or dedicated feed, a bigger transformer) or a drive, which accelerates at near rated current and puts the screening dip near 10% × 100/600 ≈ 1.7%, at the price of line-side harmonics and a different skill set.
- Either way. The starter still earns its place: limiting inrush protects the motor winding and the mechanical train, which is its design job. It was never the tool for fixing a 10% weak-source dip alone, and the two-point model result says more about the study than about the starter.
Questions asked
Does a longer ramp time reduce the utility bus dip further?
No. The dip depth tracks the current limit, not the ramp: at any instant the bus sags in proportion to the amperes flowing, and a 10-second ramp only spreads the same limited current over more time. What the ramp does reduce is mechanical shock, belt loading and motor heating during the start. If you need less dip, lower the current limit or reduce the source impedance.
What current limit should I set for an unloaded motor start?
Soft-starter documentation puts typical starting current at two to four times rated current. For an unloaded machine, begin near 350% — the wye-delta equivalent — and step down while watching acceleration time and motor temperature. Some heavy-duty models accept limits up to about 550%; confirm your setting range in the starter's manual and leave the high end for loaded, high-inertia machines.
Would a drive instead of a soft starter fix the dip?
On the dip, usually yes: a drive accelerates the motor at roughly rated current, about six times less than a 600% locked-rotor draw, so the screening dip collapses to a couple of percent. You trade that for line-side harmonics, filtering and a different maintenance skill set. If the utility's 5% ceiling is firm and the supply cannot be upgraded, the drive is the starting method that meets it.
How do I confirm the study once the starter is running?
Log one complete start with a power-quality meter at the transformer secondary and a true-RMS clamp meter at the utility connection, capturing voltage and current together; average-reading meters under-report a soft starter's phase-controlled current. Quote the dip against the measured pre-start voltage, not nominal. Then put the measured current into the model — the two dip numbers should agree within a point or two.