Short answer

The one-second dip to 109 V on the branch is the medium-voltage motor's starting current flowing through impedance shared with that branch: about 8 V, or 6.8%, well inside the 15% starting-drop practice but low enough to trip one sensitive device. Capture the dip at the load, fix it at the motor start or at the device, and leave the utility tap alone - raising the bus to 4368 V only lifts the floor to about 114 V without removing the dip.

On this page
  1. Capture the dip at the load before changing anything
  2. The dip points upstream, not at the downstream circuits
  3. What the incoming medium-voltage level should be
  4. Why the downstream meters read higher than the incoming
  5. Working the numbers: 117 V normal, 109 V floor during the start
  6. Fixes that remove the dip, and which to choose
  7. Questions asked

Your 120 V branch falls about 8 V for roughly one second whenever the medium-voltage motor across the second 4.16 kV bus starts, and that dip is made where the two loads share a supply: the utility transformer, the medium-voltage distribution and the feeder up to that bus. At 6.7 to 6.8% it is well inside normal motor-starting practice - every motor on the system is comfortable - and one electronic device is not. Capture the dip on a recording meter, confirm it appears at the 480 V bus and the medium-voltage bus at the same instant, then spend the fix on the motor start or on that one branch. Raising the utility voltage only lifts the dip's floor; it does not remove the dip.

Capture the dip at the load before changing anything #

The first instrument on this job is a recording meter at the affected panel, not a tap wrench. A steady-state display averages over seconds and will not show the true floor of a one-second event, and the 112 V and 109 V figures are two reports that need one instrument to settle. Record:

  • normal RMS voltage, minimum RMS voltage and dip duration at the affected branch panel;
  • the same quantities at the 480 V bus and at the medium-voltage bus, through the PTs, time-stamped against the motor start;
  • the start signal or event record from the starter, so each dip is tied to one specific start;
  • the documented input-voltage range of the device that faults.

A simultaneous sag at all three levels confirms a source-side cause. A clean medium-voltage bus with a dipping branch panel would instead point at the MV-to-480 V or 480 V-to-240/120 V transformer and the branch wiring. Connecting a recorder to medium-voltage PT terminals means opening switchgear: de-energize, lock out and test for absence of voltage before touching terminals, and never open a PT secondary circuit while its primary is energized.

The dip points upstream, not at the downstream circuits #

Volts lost along any path equal the current drawn times the impedance in that path, ΔV ≈ I × Z. An across-the-line start draws many times running current, and starting studies model the motor at that instant as a constant-impedance load, so nearly all of the loss lands in whatever the starting current and your branch share: the utility transformer, the medium-voltage main bus, the feeder breaker and the second MV bus. The MV-to-480 V transformer, the 480 V-to-240/120 V transformer and the branch wiring serve your load only, and their own drops do not grow during a start - they pass the lowered bus voltage along. A one-second dip coincident with every start convicts the shared path, so the motor and everything upstream of both it and the sensitive load are the investigation targets, not the downstream circuits. The method is the one used in a motor starting voltage dip calculation on an 11 kV bus and in estimating voltage sag from motor inrush current.

Two reference points frame how big this dip is. Planning practice for motor starting limits the drop to about 15% - at least 85% voltage at the motor terminals - and the measured dip sits far inside that. On the power-quality side, a sag is defined as a fall below 90% of nominal, and typical fault-caused sags last 3 to 10 cycles (50 to 167 ms); a motor-start sag instead lasts as long as the motor takes to accelerate, here about one second.

What the incoming medium-voltage level should be #

Verify it as a baseline, after the metering is trusted, and not as the cure. ANSI C84.1-2020 (reaffirmed 2025) sets nominal voltage ratings and operating tolerances for 60 Hz power systems above 100 V. On the low-voltage base its Range A service band is 114 to 126 V, with wider tolerances of -8.3% and +5.8% (110 to 127 V) for limited excursions. For the medium-voltage service, the figures cited for this system from IEEE Std 141 are a maximum service voltage of 4370 V and a minimum near 4050 V; confirm the applicable limits with the utility and the current edition of the standard, because service voltage is a contract quantity between you and them.

The utility's tap changer regulates the secondaries of 2400:120 PTs connected line-to-neutral on the bus - 4160 V ÷ √3 ≈ 2402 V primary, so the secondary sits at its nominal value when the primary does. Its quoted 2 V bandwidth is 1.7% on that base; pin down whether that means ±1 V or ±2 V, and ask for the setpoint and time delay. A delayed tap changer regulates steady state and cannot act inside a one-second start, so no tap setting removes the dip.

Decision: your 117 V normal reading is inside 114 to 126 V, so no steady-state correction is owed. The 4035 V phase reading at the incoming gear matters only once the PTs and meters are verified; a genuinely low verified reading would justify a small trim, nothing more.

Why the downstream meters read higher than the incoming #

Readings of roughly 4035, 4079 and 4122 V at the incoming gear against 4130 V and above downstream, both sets taken from open-delta PT connections, are most likely a measurement or setup difference - unless a capacitor bank is actually connected on the lower bus and lifting its voltage. An 87 V spread between phases on the same meter is itself a warning. Before comparing the two sets:

  • confirm each PT ratio, and whether the connection is line-to-line or line-to-neutral;
  • check secondary wiring, phasing and burden against the drawings;
  • verify the meter configuration: ratio setting, line-to-line versus line-to-neutral basis, and whether the display shows instantaneous, averaged or min/max values;
  • compare against a calibrated reference instrument at the same point;
  • take both sets of readings simultaneously, and record the status of any capacitor bank.

Decision: treat both sets as unverified until then. Voltage that rises from source to load with no capacitors in between is physics telling you the two numbers are not comparable.

Working the numbers: 117 V normal, 109 V floor during the start #

Inputs, each with its source:

  • Normal reading at the affected panel: 117 V (the steady-state measurement taken on the floor).
  • Floor during the roughly 1 s start: 109 V (the transient reading management captured).
  • Branch report from the installation staff: 120 V falling to 112 V during the start.
  • Motor-start planning limit: 15% maximum drop, at least 85% voltage at the motor terminals (practice figure, not a code requirement).
  • Sag threshold: 90% of nominal (power-quality definition).
  • Service band: Range A 114 to 126 V, wider band 110 to 127 V (ANSI C84.1 tolerances above).
  • Management's proposed correction: raise the bus 5%, to 4368 V, against the 4370 V cited service maximum.

Rule in words: the dip in percent is the normal reading minus the floor, divided by the normal reading, times one hundred. The floor in percent of nominal is the floor divided by nominal.

Arithmetic:

  • (117 V - 109 V) ÷ 117 V × 100 = 8 V ÷ 117 V × 100 = 6.8%
  • 8 V ÷ 120 V × 100 = 6.7%
  • 109 V ÷ 120 V × 100 = 90.8%
  • 117 V × 1.05 = 122.9 V, and 122.9 V × (1 - 0.068) = 114.5 V
  • 4160 V × 1.05 = 4368 V

Result: the two reported dips agree at 6.7 to 6.8% - different instruments, same physics. The floor sits 0.8 points above the 90% sag threshold, 5 V below the 114 V Range A floor and 1 V below the 110 V wider-band floor. The raise moves normal operation to 122.9 V and the floor to about 114.5 V: the dip survives, the floor lands exactly on the Range A boundary with no margin, and the bus ends up within 2 V of its service maximum.

Decision: 117 V normal is in band, so there is no undervoltage to correct - the dip is the whole defect. The raise buys 5.5 V of floor, leaves the dip in place and parks the bus at its ceiling; if the device still trips at a 114.5 V floor, the taps have nothing left to give. Fix the starting current or the branch.

Fixes that remove the dip, and which to choose #

Tap changes and transformer re-taps raise the floor of the dip without reducing it, and a steady-state raise toward the service maximum raises flux, no-load current and heating in every motor on the bus. If you touch the taps at all after the metering is verified, limit it to a 1 to 2 V trim on the PT base - enough to stop a marginal device tripping, not enough to stress anything. That is a patch, and it should be labeled one.

The real fixes sit at either end:

  • At the motor: a reduced-voltage starter or soft starter cuts the starting current, and the dip shrinks with it. Ask the utility whether it limits across-the-line starting by motor size; the arithmetic is the one covered in converting a 350 kVA soft start limit to starting current.
  • At the bus: switched capacitor stages held in during the start support the voltage; mitigation practice calls for a minimum of two stages and preferably three or four, sized for the voltage support needed.
  • At the device: a constant-voltage transformer, voltage conditioner or small UPS on the one affected branch makes it ride through every start the plant ever makes.

Decision for this system: one sensitive device with every other load healthy points at the branch - condition that branch now. Put the soft-starter evaluation on the schedule if starts are frequent or the dip starts bothering more than that one device; that is the fix that removes the dip for everyone on the bus.

Questions asked

Is a dip to 109 V for one second formally a voltage sag?

Formally, a sag is any fall below 90% of nominal, and your floor sits at 90.8% - but the label changes nothing. What matters is the input-voltage range in the faulting device's own documentation: field surveys have attributed almost half of sensitive-equipment failures to sags that other loads rode through without notice. Compare the captured minimum against that documented range. If it falls below it, the device needs ride-through help or a shallower start, not a higher utility voltage.

Why can the downstream switchgear read higher voltage than the incoming gear?

An open-delta connection builds all three displayed voltages from just two PTs, so one wrong ratio, wrong burden or wiring error contaminates two of the three readings at once. Unless a capacitor bank on the lower bus is genuinely lifting voltage, a downstream reading above the incoming reading means the two meters are not reporting the same quantity - different ratios, different averaging windows, or readings taken at different moments. Verify ratios, configuration and calibration before trusting either meter.

How much will a soft starter on the motor cut the dip?

The dip is starting current times source impedance, so it shrinks in proportion: halve the starting current and you roughly halve the 8 V lost. Read the motor nameplate first, because medium-voltage motors at this system class are commonly rated 4000 V, and the starting method has to suit that rating. Then weigh the starter against a conditioner on the single affected branch.

What recorder settings catch a one-second motor-start dip?

Log per-cycle or half-cycle RMS minimums rather than an averaged trend: a one-second dip disappears inside display averaging, which is likely why 112 V and 109 V were reported in the first place. Record several starts with the motor start time stamped, and capture the branch panel and the 480 V bus together, so one dataset ties the dip to the start and gives the true floor.

Keep reading

  • How-to

    Motor starting voltage dip calculation on an 11 kV bus

    A starting medium-voltage motor dips the bus in proportion to its locked-rotor kVA against the source's short-circuit strength. Screen it as dip ≈ 100 × S_start/S_sc at the point of common coupling, then refine with ΔV = I_start(R cosφ + X sinφ) per phase. In the worked 11 kV, 1.5 MVA chiller example a direct-on-line start gives 3.6% at the PCC and 4.0% at the plant bus, failing a 3% limit; a 65% tap autotransformer or a soft starter limited to 3× rated current holds both points under 2%.

    Motors and motor starters

  • Explainer

    Converting a 350 kVA soft start limit to starting current

    A 350 kVA soft start limit is about 421 A of line current at 480 V: divide 350,000 VA by √3 × 480 V. The figure is apparent power, so no power factor enters the conversion, and it carries no duration — that comes from the torque-speed margin. The 12.5 kV fuse is a coordination problem; motor protection belongs at 480 V.

    Motors and motor starters

  • Explainer

    Effect of closing the bus tie on motor starting

    No. With the tie open, the motor on one bus sees only that bus's incomer, so energizing the second incomer changes nothing in its circuit; closing the tie while the motor's own incomer stays closed changes nothing either. The tie only eases a start when it actually parallels two live sources onto the motor bus, roughly halving the source impedance — at the cost of higher fault current.

    Motors and motor starters