Short answer

Fifteen simultaneous CT secondary channels need fifteen current-regulated outputs, not one voltage source: at a 5 A RMS command into an example 0.5 Ω loop, each channel needs about 2.5 V and 12.5 VA of compliance, 187.5 VA continuous for all fifteen. Choose a multi-channel relay test set or generator-driven current amplifiers when channels need independent phase and frequency; one programmable three-phase source, sequenced across circuits, covers balanced tests.

On this page
  1. What the loop is: relay burden plus your bench wiring
  2. The per-channel arithmetic, worked
  3. What fifteen independent channels must each control
  4. Three architectures compared
  5. Prove the delivered current before you trust it
  6. The decision, case by case
  7. Questions asked

Fifteen simultaneous CT secondary channels need fifteen current-regulated outputs: a relay test set configured with that many current channels, or a multi-channel waveform generator driving one compact current amplifier per channel. A single programmable three-phase AC source covers the job only when the channels share one frequency and either hold balanced angles or are tested one circuit at a time. Underneath every option sits the same sizing question: each channel must develop enough voltage compliance to push its commanded RMS current through the whole loop — relay input burden, leads, terminals, any switching contact. At a 5 A RMS command a realistic bench loop asks for about 2.5 V and 12.5 VA per channel, so fifteen live channels are a 187.5 VA continuous current source before any headroom.

What the loop is: relay burden plus your bench wiring #

The receiving device is the smallest part of the load. Modern protection relay current inputs are deliberately frugal — ABB's application note on calculating CT accuracy limit factor lists a relay input burden below 20 mΩ for a 5 A input — so what dominates a bench loop is everything you add to it: test leads, terminal blocks and any selector or switching contact in the circuit.

Copper is cheap to compute. A 26 m round trip of 1.5 mm² lead is about 0.30 Ω, from R = ρL/A = 1.72×10⁻⁸ Ω·m × 26 m ÷ 1.5×10⁻⁶ m² ≈ 0.30 Ω. Add terminals and a switching contact and an example loop measures 0.5 Ω end to end, which is the number the worked example below uses.

Two things move that number. At 50/60 Hz the loop is essentially resistive, but if the test plan includes off-nominal frequencies or harmonic orders, loose test leads add inductive reactance — measure the impedance across the frequency band instead of trusting a DC ohmmeter reading. And there is no C-class rating to lean on: a SEL technical paper on selecting CTs for relay performance defines the C rating as the secondary voltage a CT supports across a standard burden at 20× rated current while holding ratio error within 10%. A simulator replaces the CT, so its compliance voltage is the spec that plays that role. This is the same burden voltage that decides the reverse-injection test in reverse current injection with a CT: burden voltage decides, seen from the source side instead of the CT side.

The per-channel arithmetic, worked #

A current-regulated channel holds its commanded current regardless of burden, so its output stage must develop V = I × Z across everything in the loop. Apparent power follows as S = V × I in VA, and a resistive loop turns all of it into heat, P = I²R in watts.

Example inputs, illustrative — measure your own loop before ordering: command 5 A RMS per channel; loop impedance 0.5 Ω resistive, built from a 0.02 Ω relay input, 0.30 Ω of leads and 0.18 Ω of terminals and contact.

  • Voltage per channel: V = 5 A × 0.5 Ω = 2.5 V RMS
  • Apparent power per channel: S = 2.5 V × 5 A = 12.5 VA
  • Heat in the loop: P = (5 A)² × 0.5 Ω = 12.5 W per channel, dissipated in the leads and contacts, not the relay
  • Fifteen channels together: 15 × 12.5 VA = 187.5 VA of regulated current output, continuous

A lean loop relaxes this fast. A 20 mΩ relay input with short 2 m leads — about 0.02 Ω in 1.5 mm² — and clean terminals gives roughly a 0.05 Ω loop, so the same full-scale command needs 0.25 V and 1.25 VA per channel, 18.75 VA for all fifteen. Supplier listings for programmable AC current sources describe units delivering full rated current across a 0.2–20 V compliance window, which brackets both loops; the compliance voltage, not the ampere rating, is the number to negotiate.

Fix the amplitude convention before anything else. If the automation writes 5 meaning 5 A peak into a source that honors it as peak, the receiver sees 5 ÷ √2 ≈ 3.54 A RMS — 29% low — and every downstream reading inherits the error. State RMS in the command, confirm RMS in the datasheet, and measure RMS at acceptance. These are planning numbers: measure the real loop and check the receiver input documentation before you buy.

Buy headroom, not heroics. A channel rated at least 5 V and 25 VA continuous covers the worked loop with margin — 10 A available at that impedance — and survives a 6 A excursion at 3 V and 18 VA.

What fifteen independent channels must each control #

  • Amplitude per channel in one stated convention, RMS, with the receiver scaling known before the first command is written.
  • Phase per channel: 0°, 120° and 240° is the balanced special case; swapped sequences, displacement angles and broken-delta quantities need arbitrary angles set per channel.
  • Frequency per channel: any slip, out-of-step or frequency-deviation test needs two channels at different frequencies at the same time, and a source with one shared frequency clock cannot do it however many channels it has.
  • Simultaneity: running one channel and switching it around is a different test plan, not an equivalent of fifteen live channels.
  • Isolation and returns: shared returns let one channel's current find a path through another, so check the output isolation arrangement before fifteen channels share a terminal strip.
  • Command discipline: changing one channel's command must not disturb the others — the coupling check belongs in the acceptance test.

Three architectures compared #

Architecture Independence delivered Sizing and checks Hard limit
Relay test set with the needed current-channel count Per-channel amplitude and phase; frequency may be one clock per set — verify it Compliance voltage and continuous VA from the worked example; channel count and per-channel frequency from the datasheet Frames come in three-phase groups, so five circuits can outgrow one frame
Waveform generator plus one current amplifier per channel Full per-channel amplitude, phase and frequency Continuous rating covers loop VA plus the amplifier's own drop; setpoint accuracy is set by the sense resistor Bench space, heat and wiring discipline at fifteen channels
One programmable three-phase AC source, switched across the five circuits True 0/120/240 with per-phase amplitude, one common frequency A voltage source regulates volts, not amps: delivered current follows loop impedance unless the source has a real current mode No simultaneous abnormal-frequency or cross-circuit angle tests; sequential only

The common-bus-drive idea — one rectifier feeding several inverter channels — resurfaces for jobs like this because the hardware looks reusable. Drives are product-standardized for motor loads (the IEC 61800 series covers power drive systems), not for closed-loop AC current control at instrument-level currents into sub-ohm burdens, so that route means designing and validating an instrument rather than buying one. The amplifier route is the same idea built from parts made for the purpose: a published Texas Instruments amplifiers-forum example maps a 10 V command to 10 A out, with 0.1%-tolerance sense resistors giving 0.1%-class setpoint accuracy — the accuracy you get is the accuracy of the current-sensing part, so spec it accordingly.

Prove the delivered current before you trust it #

Injection happens on an isolated secondary: de-energize, verify absence of voltage at the terminals, and confirm the in-service CT is disconnected and shorted per the plant switching procedure before connecting anything — NFPA 70E, 2024 edition, requires establishing an electrically safe work condition before you open equipment, and the details belong to your authority having jurisdiction and the equipment documentation.

Then take three readings per channel: the command, an independent true-RMS measurement at the receiver terminals, and the receiver's own display. The pattern among them separates a source problem from a scaling or mapping problem. Measured and displayed both below command points at compliance limiting or an amplitude-convention mismatch. Measured correct but displayed wrong points at the receiver ratio setting — a 600/5 setting turns the full-scale secondary command into 600 A on the display, and the arithmetic behind that conversion is walked through in checking a 600/5 CT ratio for transformer protection.

Amplitudes right but phase relationships wrong points at wiring or automation binding, not at the source's muscle; inject one channel at a time to find which input a command actually reaches. The chain fault behind a CT that reads correct volts while the meter shows zero amps is the same lesson: the delivered signal and the displayed number are separate checkpoints, and only a terminal measurement proves which one lied. When one command moves a channel it should not touch, suspect shared returns or a coupling path, and change one command at a time until the culprit is named.

The decision, case by case #

Case 1 — any test step needs two or more channels at different frequencies, or arbitrary angles, at the same time: slip tests, out-of-step runs, cross-circuit differential or synchrocheck. Buy per-channel current regulation: a relay test set configured with fifteen current channels, which usually means two frames, or a multi-channel generator driving fifteen current amplifiers. Spec each channel at least 5 V and 25 VA continuous, per the worked example.

Case 2 — the fifteen channels only ever carry balanced 0°, 120° and 240° at one frequency, all together or one circuit at a time: one programmable three-phase AC source does the whole job. With no current mode available, add a series resistor sized at the worked example's loop impedance to dominate the loop: drive 2.75 V so the set current is 5.0 A (2.75 V ÷ 0.55 Ω), accept roughly ±1% of current wobble for a ±10% wander in the small part of the loop, and rate that resistor for its 12.5 W of dissipation with margin — a 25 W part on a heatsink.

Case 3 — a mixed plan, most channels balanced with two or three going abnormal: a hybrid. One three-phase source carries the balanced background; two to four current amplifiers take the abnormal channels. Smallest footprint, least hardware, and the only combination that keeps both halves of the plan honest.

The simultaneity rule decides the rest. If the receiving scheme compares circuits to each other, you are in Case 1 whatever the panel space says. If the specification allows circuit-by-circuit testing, Case 2 turns the whole fifteen-channel job into one programmable box.

Questions asked

Can one current channel be switched across all fifteen inputs instead?

Yes, if the test specification allows one circuit at a time — sequential testing is a valid plan, not an equivalent of simultaneous. Fold the switching contact into the loop impedance, because a tired or dirty contact can add tenths of an ohm and skew every step that runs through it. Check the switch transition behavior too: an open moment on a live current loop can spike the voltage at the source and drop the receiver reading to zero mid-step.

Why not drive the loop with a plain voltage source?

A voltage source regulates volts, so delivered current equals set voltage divided by loop impedance and every impedance error becomes a current error. Hold 2.5 V across the example 0.5 Ω loop and let it drift to 0.6 Ω: the current falls to 4.17 A, about 17% low, with nothing on the source announcing it. Voltage mode is workable only with a dominant series resistor or an independent measurement on every channel.

What instrument should verify the injected current?

Use a true-RMS clamp or a calibrated shunt whose accuracy is several times better than the tolerance being proven — a 0.5%-class instrument cannot demonstrate a 0.1% setpoint. Confirm its rated frequency band covers the test waveforms: many clamp meters are specified for 50/60 Hz sinusoids only and under-read harmonic-rich or off-nominal-frequency currents, which quietly blames the source for an instrument limitation.

Does the simulator need to reproduce CT saturation waveforms?

A current-regulated sine reproduces the RMS secondary current, not a real CT saturation waveform with its harmonics and DC-offset decay. If the relay test specification calls for those shapes, you need voltage headroom to force the waveform through the burden plus a CT model driving the channel — a different instrument class with far higher VA demand. Most meter-accuracy and element-reach tests never need it.

Keep reading

  • Explainer

    Reverse current injection with a CT: burden voltage decides

    A CT multiplies current only into a burden that is nearly a short circuit. Into 1,200 Ω, 100 mA forces 120 V and 12 W at the output, which reflects as 75 MΩ and 30 kV on the 250-turn winding, beyond any 400 µA source and any CT core or insulation. Lower the burden to ohms or less, where secondary injection is standard practice, or drive the load from a 60 Hz source that supplies the voltage and power directly.

    Protection: breakers, fuses and SCCR

  • Troubleshooting

    When a CT reads correct volts and the meter reads zero amps

    A current transformer with a 0.333 VAC output collapses to near zero when landed on a power monitor's low-impedance current input; the meter is healthy. Fit a conventional 5 A secondary CT sized just above the circuit maximum, or use the meter variant whose current inputs expect a 0.333 VAC signal. Never open a 5 A CT secondary while the primary carries current.

    Power quality and harmonics

  • Selection guide

    Measuring DC and AC motor current for a PLC without a VFD

    No. A fixed-speed motor that keeps its starter and overload relay gets PLC current feedback from a current transducer wired to an analog input, or from a communicating overload relay that reports over the network. A 12 V DC load needs a DC-capable Hall-effect transducer, because a current transformer cannot read steady DC.

    Control power: 24 V DC, UPS and transformers